Post Job Free

Resume

Sign in

Test Cases Engineer

Location:
Redmond, WA
Posted:
April 30, 2019

Contact this candidate

Resume:

Experience Summary:

I have ** years of experience in Quality Assurance Lead and almost 9 years on Microsoft Windows Devices Group in CFE (Customer Focused and Engineering) Team for different requirements of OEMs in a fast-paced environment at Microsoft Redmond Campus.

Professional Summary:

Expertise to ATLAS Cloud, WTT Atlas and WTT Studio for Automation runs.

Knowledge to create VMs in Xlab and MadDog servers and maintenance using MS Azure services.

Deploy builds, scripts and other test services on test VMs and verify Installation, Uninstallations and Layout issue

Expert on using Monsoon Power Monitor/Oscilloscopes for different power scenarios to meet exit criteria.

Complete understanding of Telecommunication standards like 3GPP for GSM and 3GPP2 for CDMA technologies.

Strong knowledge in QA process and Testing which includes Requirement Analysis at early stage, preparing Test Strategy Plan and Test Cases against all the requirements

Knowledge of all different network layers like Physical, MAC, RLC, PDCP, RRC and NAS

Familiar with LTE network elements and interfaces which allow SIP, P-CSCF, I-CSCF, S-CSCF, MME, SGW and PGW cooperating with other network elements like MME, HSS and PCRF.

Familiar with IMS stack, VoLTE and VT (Video Telephony) call flow

Skilled in working on different call box setup/Logic Analyzers like Spirent, Anritsu, Agilent, CMW R&S and Anite.

Highly skilled in prototype testing and analysis using RF signal measurement software

Experienced working on WiFi Throughput Testing using WPPerf.exe and iperf.exe, Monitoring Data transfer rate and range with WiFi Direct and Peer-to-peer connection, collect etl and ETW logs after test failure, SOFTAP TCP/UDP upload and downloads, Over the air test, Power Monitor Test scenarios using WiFi and optimization of power consumption.

Can analyze logs referring to the 3gpp specs as per the customer requirements.

Experienced in providing on-site support at various third-party labs and attending meetings to answer queries of the customers.

Specialized in using various tools like QXDM, QCAT, MDL, RTA, Wireshark and other internal tools for collecting issues and analyzing logs using log masks.

Expertise in Microsoft Windows Phone 10, 8 and 7 Automation test suites, tools and process – WTT, PS, Source Depot, TEXUS, TPManager, T3, TELLUS, OPS LAB

Experience in Windows Phone 10.X, 8.X and WM7 Triaging and Testing.

Updateability, FTP and CTP Automation test monitoring, Triaging, Bug filing and Reporting.

Test through Test Central tool for Manual, Automation and Semi Automated tests, monitoring and Support

Strong knowledge in Testing domain, Preparing Test Strategy Plan.

Experience in using the Bug tracking tools like Product Studio.

Setting up the quality process for the project with respect to the deliverables.

Skilled in understanding and analysis of Business, Functional Requirements

Experience in RFP response and creating Statement of Work (SOW), Work Break Down Structure (WBS), Project Management Plan (PMP), Decision Analysis and Resolution (DAR) plan, Project Information Report (PIR)

Skill set:

Application Software

Agilent, CMW, Spirent, Aeroflex, Anritsu, Anite.

Operating System

Windows Phone 10, Windows Phone 8, Windows Phone 7, Android, Windows 7/XP, Red Hat WS 4.0, SuSe 10, Novell 9.2, Solaris 10, AIX 5.3, HP UX

Software Packages

MS office, Adobe workshop, TShell script, Power shell scripts, Visual Studio

Domain

Mobility, GIS, ERP, Telecom, Media, Publishing and Retail domain.

Tools

Product Studio, WTT, QXDM, QPST, Windbg, Visual Studio 2017, TELLUS, TEXUS, T3, Load Runner, Mercury quality Centre, Rational Clear Quest, IBM AppScan, JMeter and Badboy

Certifications

QA Certification from WebTek Labs

ITIL-V3 Foundation

Introduction to Program Management

Enterprise Project Management

Creating and Defining a Project

Organizing and Managing Project Information

Specifying and Assigning Resources

Educational Qualification:

MBA in Program Management, San Jose, CA. GPA 3.8 / 4

Bachelor of Technology in Computer Science Lucknow, India

Project Summary:

1.WDG SHELL Team Microsoft, Redmond, USA

Client: Microsoft Corporation Duration- Feb 2018 – Till Date

Working as SDET Engineer for SHELL Team and responsible for triaging all automation failures under FT_Shell area using ATLAS Cloud, WTT Atlas and WTT Studio on multiple OS.

Improving existing triage process and continuously resolving all the failures under SHELL which includes on-time delivery to stay compliant with shiproom.

Create VMs for automation run, schedule automated tests and open bugs for new test failure.

Log analysis for all automation failures and resolve issues on Win 7, Win 8 and Win 10 platforms.

Re-run all new failures to differentiate between Test failures and Infrastructure failures.

Bug verification for MS Store Team on both Windows Phone and Desktop App.

Generate and maintain daily and weekly Test Report for FT_Shell Team.

2.Visual Studio IDE Platform Microsoft, Redmond, USA

Client: Microsoft Corporation Duration- Feb 2017 – Jan 2018

Worked as SDET Engineer for Visual Studio IDE Team and responsible for verifying overall visual studio functionality on multiple OS and languages.

Responsible for creating virtual machines in Xlab servers on different languages for manual test scenarios, deploy latest VS build and verifying Installation, Uninstallations and Layout (Online, Offline, partial and full layouts) issue.

Schedule automated tests on MadDog server, monitor the runs and file bugs for test failure.

Generate and maintain daily and weekly Test Report using VS Share Point and Power BI tool for MS managers for ship room.

Conduct Site validations with each RTW release of Visual Studio functionality to make sure all Help guides are correct and accurate.

Preview and Release signoff with every RTW releases.

3.Windows Phone 10, 8 and Windows Mobile 7 – Microsoft, Redmond, USA

Client: Microsoft Corporation Duration- Feb 2011 – Jan 2017

Worked as a SEDT-3 for CXE and Feature Team. This includes analysis of requirements, creating test plan, creating and modifying existing test cases as per new requirements and testing of engineering and retail devices on WP8 and WP 10 platform.

Attend on-call meeting with Microsoft partner (Qualcomm) to get the schedules of all the bug fixes.

Identify key scenarios to validate the fixes coming from Partners at the first place by creating Smoke Tests Pass in WTT.

Visit Partners onsite location as and when required to do apple-to-apple comparison. It helped to figure out if bug is related to Microsoft OS or Qualcomm Modem.

Responsible for executing 10776 regression cycles on devices and finding bugs.

Experienced in using Anite, Spirent, Anritsu, Comprion and performing various testing’s using validated scripts or standalone Signal.

Capable working on UMTS, LTE and CDMA protocols.

Conducted throughput testing on Spirent for performance testing.

Testing of network related proactive commands using Anritsu and Comprion IT3 setup.

Collecting and analyzing the MODEM logs using QXDM tool and Comprion logs for the issues.

Familiar with AT&T specs for 10776 testing.

Responsible for supporting various teams in using a callbox and giving presentations and demos on the functioning and usage of various callboxes for testing.

Experienced in using Windbg for analysis RIL and Kernel logs.

Use Wireshark on day to day to analyze data parameters and to check IMS functionality.

Experienced in using AT commands and writing automation scripts

4.DSGi-LAP – HCL Technology, India

Client: DSG Corporation Duration: Aug 2010 – Jan 2011

Requirement Analysis and Effort Estimation

Mentor the project team members and assign the work

Preparation of test cases against requirements

Isolation of Bugs and reporting

Creation of test report on daily basis.

5.PCS-PTG – HCL Technology, India

Client: Pearson Technology Duration: Sep 2009 – Jul 2010

Requirement Analysis and Effort Estimation

Mentor the project team members and assign the work

Preparation of test cases against requirements

Isolation of Bugs and reporting

Creation of test report on daily basis.

6.New Global Web Platform – HCL Technology, India

Client: Readers Digest Duration: Apr 2009 – Aug 2009

Requirement Analysis and Effort Estimation

Preparation of test cases against requirements

Multilingual Testing for 36 Countries

Data Migration Testing

Isolation of Bugs and Creation of test report on daily basis.

7.PIMS-Custom Pub – HCL Technology, India

Client: Pearson Technology Duration: Oct 2008 – Mar 2009

Requirement Analysis and Effort Estimation

Preparation of test cases against requirements

Progression Test and GUI Testing

Regression Testing

Isolation of Bugs and reporting

Creation of test report on daily basis.

8.LadyBird and Peter Rabbit Redesign- HCL Technology, India

Client: Pearson Technology Duration: Mar 2008 – Sep 2008

Requirement Analysis and giving Effort Estimation

Preparation of test cases against requirements

Progression and Regression Testing

Isolation of Bugs and Bug Reporting. Creation of test report on daily basis and GUI Testing.

9.Puffin Redesign In Vignette - HCL Technology, India

Client: Pearson Technology Duration: Jun 2007 – Feb 2008

Requirement Analysis and giving Effort Estimation

Preparation of test cases against requirements

Progression and Regression Testing

Isolation of Bugs and Bug Reporting

Creation of test report on daily basis and GUI Testing.

10.Operation Support Systems Portal (OSSP) – HCL Technology, India

Client: Comverse Duration: Jul 2006 – May 2007

Requirement Analysis

Preparation of test cases against requirements

Progression and Regression Testing

Isolation of Bugs and Reporting

Creation of test report on daily basis

Functionality Testing including installation and uninstallation of component using rpm and tar package

11.Adobe Reader 7.0.5 - 7.0.7 – Adobe Systems Inc, India

Client: Adobe Systems Duration: Dec 2005 – Jun 2006

Execution of Test Cases

Bug Reporting

Regression Testing

Functionality Testing and GUI Testing

12.Enterprise Knowledge Pro – SumSof tech Pvt Ltd, India

Client: NTT Duration: Jul 2004 – Nov 2005

Preparation of test cases against requirements

System Testing and Bug Reporting

Regression Testing and Creation of test report on daily basis.



Contact this candidate