Post Job Free

Resume

Sign in

Engineer Manager

Location:
Perrysburg, OH
Posted:
April 28, 2019

Contact this candidate

Resume:

Ahmed Shehata

Principle-Lead Piping/Pipeline Engineer

Project Manager

(Permanent Resident of the US)

December 2018 1 of 3

CONTACT INFORMATION

Address : **** ********* **., **********, ** 43551 Cell Phone : +1-419-***-****

E-mail address : ac88jw@r.postjobfree.com

KEY COMPETENCIES

Over 20 years of significant, progressive experience in management, design engineering and site supervision of all discipline engineering works for numerous projects in the Oil & Gas industries. Moreover, my on-the-job experience at Offshore Design Engineering (ODE UK /Doris Group), PETRONAS/Shell Malaysia, PESCO, British Gas, Apache and PETROJET has afforded me a well-rounded skill set, including problem-solving abilities, I excel at:

• Preparation of P&ID, piping line list, bulk and final MTO based on General Arrangement and Isometric drawings

• Holistic pipeline /Piping design calculation, consideration given to total life cycle.

• Developed piping specifications, including material selection.

• Managing and overseeing projects and engineering staff.

• Using design guides, standards, systems and applicable engineering codes to piping and pipeline engineering.

• Material selection capability encompassing piping, valves and relevant ancillaries. In addition, I have a solid educational foundation and progressive engineering knowledge that has provided me with the opportunity to develop strong client relation building skills and an ability to lead multi-disciplinary teams. I am experienced at applying the principles of piping and pipeline engineering and project management when planning, designing, and overseeing the engineering, construction and maintenance of engineering facilities. PROFESSIONAL EXPERIENCE

January 2017

to Present

Company: ODE

Title: Lead piping & Project Manager RSF (Rosetta Sharing FACILITY) technical assurance Project.

• Liaising with all members of the project delivery team (construction, engineering, and contractor) to assist the Projects with technical support in all engineering/construction phases and with associated documentation to meet project quality, safety, cost, and program.

• Supervises preparation of construction drawings and schedules.

• Review detailed design calculations, preparation of engineering data sheets & specifications.

• Visit site and assist each engineering discipline as required.

• Carry out construction readiness reviews and constructability assessments in line with Project requirements and liaise with internal regulator where required. January 2015

to December

2016

Company:

PETRONAS

Carigali Sdn.

Bhd.

Location:

Malaysia

Title: Integrity& Engineering studies Lead / Rehabilitation project manager.

• Pioneered the analysis of annual capacity review for all trunk lines and hydraulic analysis for intra-field pipelines, 106 pipelines in total.

• Matured Front End Engineering Design exercise for 22 pipelines for Sarawak Region.

• Lead pipeline integrity assessment exercise, concluding FFS assessments for 11 pipelines Rehabilitation of four pipelines with High risk Integrity (internal/external) issues, by inserting In-Field-Liner (IFL).

• Recent introduction and study of RTP (Reinforced Thermoplastic Pipe) and TCP (Thermal Composite Plastic pipe) as an Alternative standalone solution to replacement of deteriorating carbon steel pipelines with potential economic benefits.

Ahmed Shehata

Principle-Lead Piping/Pipeline Engineer

Project Manager

(Permanent Resident of the US)

December 2018 2 of 3

December 2013

to January

2015

Company:

PETRONAS

Carigali Sdn.

Bhd.

Location:

Malaysia

Title: Procurement and Construction Lead

The Pipeline Rehabilitation Project Objective is to rehabilitate ageing carbon steel pipelines utilising cutting age high performance plastic reinforced with aramid fibres. This project is worth more than USD 1 billion over a span of five years.

• Actively contributed to the Detailed Engineering exercise, accelerating Material Take Off and Procurement decisions with sound technical basis.

• Optimised procurement of long lead items duration (Shutdown Valves, hot bends, line pipes).

• Single point accountability for all onshore fabrication works throughout the project, involving various parties within a short duration of time, meeting complex shutdown deadlines.

• Offshore technical counterpart, providing onshore engineering support during the offshore execution campaign.

November

2011 to August

2013

Company:

ODE (a joint

Saipem-Doris)

& PESCO

Location :

Egypt

PESCO UAE

Title: Lead Piping/Pipeline Engineer (ODE).

Lead Piping/Pipeline Engineer for RASS ISSA Oil Storage/Terminal Project (PESCO)

• Led the preparation of line list, bulk and final Material Take-Off (MTO) in accordance with P&ID, GAD and Isometric drawings.

• Design calculation of DANA Lorcan 6” -12 KM Gas pipeline.

• Design Road crossing For Lorcan Pipeline.

• Technical focal for the Review & Verify WT calculations, Pressure & Temperature flange rating.

• Calculated piping wall thickness based on established codes and standards.

• Reviewed pipeline data sheets, specifications, alignment sheets, wall thickness calculations, road crossing calculations based on API RP1102 for RASS ISSA Pipelines.

• Freelancer WT calculation, stress verification of Hydre 12” DSS pipeline done by JPK. December 2009

to November

2011

Company:

Burullus gas

Company

(British gas)

Title: Mechanical Completion Manager Phase VII Main Compressor Station Installation The project is new gas compression station consists of five trains each train has three Stage compressor, intermediate and after cooler and the feeding of gas through main gas transmutation line, slug catcher finger type, HIPPIS system, separators, and all the required utilities such as air compressor, GTG, diesel generator, oily water system, open / closed drain, chemical injection packages in additional to fire fighting network. Total project worth is in excess of $ 400millionUSD.

• Develops plans for transitions from Construction (Area Based) to Mechanical Completion (System Base) to System Completion

• Interfaces with the Site Quality Advisor & Site Commissioning Lead for system completions database management with regard to mechanical completion.

• Coordination of MC planning, verification, and documentation by the use of Mechanical Completion Check Records (MCCR’s) and Walk down Check Lists (WDCL’s), punch lists, etc.

• Coordinate interfaces between discipline/area leads & contractor MC group.

• Tracking MC to Systems Completion to facilitate an effective commissioning campaign. Title: Lead Piping /pipeline Engineer (December 2009 to April 2011).

• Focal for all piping activities, prepared piping MRQ and complete bidding cycle

• Verify WT(B31.8)& Road Crossing (API RP 1102)of 32” PL from Beach valve to Slug catcher

• Prepared tie-in list, project valve consolidation list, HT map document, and piping specifications.

• Reviewed piping stress analysis report, material selection philosophy, project design basis, etc. Ahmed Shehata

Principle-Lead Piping/Pipeline Engineer

Project Manager

(Permanent Resident of the US)

December 2018 3 of 3

• Calculate expansion loop location and dimensions.

• Oversaw more than 97 tie-ins and 11 hot taps in existing LNG facilities and pipelines.

• Updated material reconciliation sheets accurately upon plan model updates. February 2003

to November

2009

Company:

Khalda

Petroleum

Company KPC

(Apache)

Title: Engineering Manager-Senior Piping/Pipeline Engineer, Project Engineer Projects: Qasr-Salam pipeline -Qasr / Ozorious oil facility-Hayat oil & gas compressor facility Project involves the construction of 24” gas transmission pipeline (31 mm), slug catcher with pre- facilities, eight Flow lines 6” DSS, Trunk lines 12” DSS Total project worth is $280millionUSD.

• Key person bridging the engineering to construction of works throughout the whole project.

• Design calculation of wall thickness of 6” flow line DSS & 12” DSS Trunk lines (LC 65-2205)

• Design verification of 24” API 5l X65 wall thickness calculation.

• Stress verification of all the flow lines,,Trunk line and Main line

• Led tender preparations, Tech. Evaluation (50 KM DSS 6”, 20KM DSS 12”, 24” API 5L X65.

• Lead design support team during the construction, fabrication, installation & commissioning. July 1998 to

January 2003

Company:

PETROJET

Location:

Egypt

Title: Piping /pipeline Construction Engineer

Alexandria Petroleum Company’s Naphtha Reformer Complex (Technip),Salam Gas Plant Project and Flow lines (Samsung Ltd)

• Fabricated piping and pipe supports, with carbon steel and duplex stainless steel materials.

• Prepared and implemented piping hydrostatic tests of complete piping loops and piping system.

• Manage Fabrication workshops for both piping & pipe support.

• Responsible for spool release, co-ordination with both quality control team, distribution to blasting/painting & Responsible on Dispatching spools to designated Area for erection

• Main focal point for systems hand over to main contractor/client. EDUCATION

B.Sc. of Mechanical Power Engineering.

Training Courses:

Course Title

Certification for Project Management

Integrity management of offshore and onshore pipeline Pressure Vessel Division 1 Design

CAESAR II Stress Analysis

Plant Design Management System (PDMS)

Fundamental of Corrosion



Contact this candidate