Suresh Chandra Mishra
BE Civil
**************@*****.*** +919*********
Add: Bld. No 8/404 Vijay Park, Kasarvadvali, G.B Road, Thane Maharashtra 400 615 India
Skills Summary: Comprehensive knowledge with proven track record of Project,
Engineering, Planning, Design Management, execution of specialized tall structure & Executing
Multi Disciplinary projects within the time frame in Construction of Airport/Airbase Project,
Stadium, High raises Tower Residential, Commercial Building & Hotel Apartments along with
Infrastructure related with projects
Current Position: Sr. Manager Civil Reporting Manager Project Director
Current CTC: IR 35,00,000.00 Expected CTC: Negotiable
Reporting Team Size: Directly/Indirectly 15 Plus Current Industry: Construction/PMC
Project Cost App: IR 700 CR Current Location: Mumbai
Project: Pune Airport, Maharashtra, India Notice: 15 Days
Project Details:
Airport @ Pune Civil Enclave, Pune India
Al Rayyan Stadium @ Doha for FIFA 2022 Qatar
Airport @ Salalah International Oman & Hindan Airbase
Hotel Intercontinental 2B+G+M+58 story (Silhouette tower) @ Doha, Qatar
Residential apartments G+4P+25 Story & The Villa @ Dubai UAE
Staff accommodation B+G+12 Story @ Dubai UAE
Hotel Safeer International G+M+7 Story @ Muscat Oman
National Head Quarter Building of Reliance @ Navi Mumbai, India
Modification of Existing Receiving stations @ Mumbai, India
STP & Under Ground water tank @ Mumbai, India
Project Experience:
Sr. Manager Civil: July 2018 to Dec 2018 @ Airport Authority of India Pune, Concept
To commissioning for the Construction of new integrated terminal building, Reconstruction of
Of Terminal building, Modification of existing expanded Terminal Building at Civil Enclave, Pune,
Maharashtra India with Egis India Consulting Engineers Pvt. Ltd
Construction ( Project ) Manager: July 2016 to April 2018 @ Al Rayyan stadium FIFA
World cup 2022 Project with ABLT JV of (L& T and Al Balagh Trading & Contracting WLL Doha
Qatar) as a Construction (Project) manager looked over all projects after multiple key activities
On behalf of JV (ABLT) for the Works Involved like Project Mobilisation, setting out,
Project office, Approval of logistic plan/lay out, Coordination, Preparation & Approval of Method
Statements from Engineers and PMC before starting the Actual activity, coordination with the
Design team For the Drawing approval, Procurement Team for Materials, Quality team for the
Approval of Materials, Project Quality Plan, Procurement Team for arrangement of materials,
Contract team For the Sub Contractor and site Team for Execution of work as per plan including
Coordination with Engineers /PMC for smooth execution of work as per project specification
With proper Utilisation of resources, manpower, Plant & Equipments
Building (Project) Manager / DGM: May 2012 to May 2016 @ Salalah for the
Construction Air Traffic Movement Building, Air Traffic Control tower, Crash Fire Rescue Station
Of Salalah International Airport with Larsen & Toubro and Construction of the C-17 Beddown
Facilities to support 10 Nos. of Boeing C-17 Globemaster III AIRCRAFT @ Hindon Air Base.
As Building (Project) Manager was Responsible for execution and Handing over of Air Traffic
Control Tower along With 360 Degree Visual Control Room including coordination with
MEP and Nominated sub contractor for the installation, testing and commissioning of Air Traffic
Movement Building including finishing likes flooring, wall cladding both external as well as
Internal, Ceiling as per requirement and Crash Fire Rescue Building from Start to finish along
With erection of steel structure including Coordination with Design team for the timely approval
Of Drawing to maintained schedule, Procurement team for the updated Status of the Materials,
Quality team for the Approval of Materials, Contract team for the sub Contractor, site Team in
Execution of the RCC Work and Complete Finishing Work like Block Work, Plaster including
Separation of Fire and Non fire Zone, approval of External Facade Work Including testing with
Multiple agencies as well as with nominated Sub Contractor for the Smooth execution of the
Work during Construction stage and at Hindon Airbase to supervise the construction of Apron,
Main Taxiway, Squadron and other ancillary Building related with Boeing C -17 @ Hindon,
Ghaziabad, UP
Construction Manager: July 2009 to Jan 2012@ Doha Qatar for the Construction of
2B+G+M+58 Stories (Silhouette tower) Five Star Hotel Intercontinental @ West bay with Redco
Construction Al Mana Group Doha, Qatar As a construction Manager was responsible but not
Limited to only construction, Supervision and Execution of the RCC work, including Planning,
Properly utilisation of resources and coordination with the design Dept for Drawing & Opening
Front for MEP and finishing team likes layout approval and Complete fit out work of the hotel
Apartments, Plastering, Painting, Wall (Stone & ACP) Cladding Façade, False Ceiling, like
Partition Wall Panelling, Painting, wall paper, flooring work as per project requirements
Including Fire proofing, accosting, Flooring, Installation of doors & windows etc to start for the
Timely execution of the work as per Approve Project Quality and HSE Plan
Project / Dy. Project Manager: Sept 2007 to Jun 2009 @ Dubai UAE for the
Construction of 4 No’s of G+4P+25 Story Residential Buildings in Emirates City of Ajman jobs
Includes the Supervision and lead a team for Execution of RCC work of 4 Nos. of towers as well
As finishing like Different type of flooring, wall cladding, Ceiling including external Façade and
The Villa 289 Villas Project at Dubai Land including supervision and execution of different type of
G+1 villa along with Swimming pool with Sky Construction @ Dubai Land for Star GIGA
Project Manager: May 2005 to Aug 2007 @ Dubai, UAE for the construction of
B+G+ 12 Story staff accommodations for Dubai Chambers of Commerce with Emirates
Contracting Co’s Dubai from start to finish including mobilization, site setting out, Shoring,
Installation of Dewatering system, RCC structure, finishing along with External facade and
Coordination with client and Engineer for the materials approval and execution of Jobs
Sr. Project Engineer: Nov 2002 to Apr 2005 @ Muscat, Oman for the construction
Of G+8 One Star (Safer International) Hotel Apartments with Oman Commercial Agencies @
Muscat Oman responsibility includes coordination with HO, Procurement Department for delivery of the materials on time at site, with Engineers for the approved drawing for the
Execution of RCC framed structure, Block work, coordination with MEP Sub Contractor for
Installation of 1st Fix including approval before starting the Plaster work and finishing activity
Project Engineer: Aug 1997 to Oct 2002 @ Navi Mumbai as a client Representative
For the Supervision of National Head Quarter Buildings work including day to day supervision of
RCC work, waterproofing, finishing work like different type flooring external Facade (Stone,
Glass & ACP), and Roofing System along with skylights and coordination of MEP Services
Including With Architect, Structural Consultant on behalf of Reliance Industry for the
Construction of Reliance National Head Quarter Building, Supervision of Temple &Beautification
of Lake as well as surrounding area, Helipad, Infrastructure work in and around NHQ Building at
DAKC Navi Mumbai
Sr. Site Engineer: Nov 1993 to July 1997 @ Mumbai for the Reconstruction and
Modification of Existing receiving station as per requirement and coordination with other
Agencies for the Installation of their equipments including testing and commissioning
Of Substation in and Around Mumbai with Tata Electric Company
Site Engineer: April 1989 to Oct 1993 @ Mumbai for the Construction of Sewage
Treatment Plant Along with lagoon and underground pumping station with pipe line and
Underground Water storage Tank with Pre Stress Product (INDIA) Pvt. Ltd Mumbai
Job Profile in General: Performs a wide range of duties includes some or all of the following
Define the scope of the project in collaboration with top management
Driving project & Ensuring Efficient use of resources
Coordinates with pre-construction efforts for design-build/Design assist Project
Coordinates during the estimating phase
Updates & manage the project Budgets
Controls and accurately forecasts project costs
Managers & Co ordinates the project schedules with head of project.
Coordinates & Resolve changes with the clients on the timely basis
Processes & manages subcontractor pay request
Maintained timely clients communication & satisfaction at the highest level
Prices, issues, Negotiates & track change order
Create a detailed work plan & sequence the activities needed for successfully completion
Determine the resource( time, money, equipments etc) required to complete the project
Need to determine & evaluate the cost of each activities in terms of sub contract & BOQ
Develop a schedule completion & effectively allocates the resources as required
Review the schedule with Team by activities wise
Complete accountability of the project within defined budgets & time schedule
Identify, work closely with consultant to insure safe & effective that comply with budget
Negotiate contract with vender to insure all cost incurred are within estimated budget.
Approve plan & budget for each Activity and make required adjustment if needed in consultation with management
Coordinate with the execution team,assign short & long term goal for successful & timely completion of project
Responsible for Billing, timely collection, extra claims, Client escalation . . . . etc.
Leading a multidisciplinary team of Engineers &Conducting Project reviews
Reviewing of construction plans, Monitoring quality of material & installation of work
Generation of technical & management reports
Construction Management, Project management,Technical & Operational direction
Analyzed major Capital Projects, Planning, Scheduling & Cost Control
Created strategies to make project move, setting of the goals & action plans
Day-to-day activities of Civil, MEP, procurement, reviving the status of all Purchase requests & orders to ensure that all items are being move as per Requirements
Keeping a track of departmental, capital expenditure budgets & Operating plane
Established & managed communication protocols with all internal & external Stakeholder
Co ordination with Client, PMC & Government Authorities for Necessary approval
Oversaw interior,finishing work, External Facade & Roofing work
Ensuring that work conforms to design, operational standards & Project requirements
Review of engineering drawings & technical specifications
Review the 3D model, basic, detail engineering drawings of equipment, structures, foundations and ensure all contractual requirements are met
Provide technical solutions to problems within teams.
Ensure that lessons learned from previous projects are known and utilized within the teams by regularly organizing technical review sessions.
Ensure that key performance like on time Delivery & Material Productivity are met
Coordination & Communicate with site team, deliverables with respect to schedules, upcoming deliverables, challenges and achievements
Follow-up & checking interface data with client, other disciplines, clash check with the help of 3D model etc.
Provide technical support during fabrication, inspection & erection stage
Support sourcing team in clarifying vendor requirements related to document &Drawing.
Assist Project Management team on technical discussions for with client & Engineer.
Ensure continuous process & quality improvement
Implement global standards & common processes to assure quality is delivered.
Monitor & approve all budgeted project expenditure
Preparing Monthly and weekly report of the project for the management and clients.
Ensure that the project deliverable are on time,within budget & at the required level of the quality
Ensure that all financial records of the project are up to date
Monitor cash flow projections, actual cash flow and variance on regular basis
Develop forms and records to document project activities
Monitor the progress of the project and make the adjustments as necessary to insure the successful completion of the project
Establish a communication schedule to update stakeholder on the progress of the project
Insure that project personal receive an appropriated orientation of the project
Mentors team members to provide the best opportunity for each member’s success
Prioritizes, communicates and resolve issues in a timely manner
Build and maintained positive relationships with design professional, sub-contractor and all team members
Suresh Chandra Mishra
BE Civil