Name

:

Roofi Rais Ahmed

Date of birth

:

** ***** ****

Nationality

:

Indian

Position

:

Sr. Mechanical Engineer

Experience

:

** ***** ( All in Kingdom Of Saudi Arabia )

Contact

:

Email: ac87yb@r.postjobfree.com

mob.: +966-***-***-*** / +966-**-*-**-**-**

Qualification:

Education:

-B.Sc. (Engineering) from one the best, oldest and prestigious university of India (Aligarh Muslim University ) - ALIGARH, INDIA, 1989 - FIRST CLASS.

-Submitted Ph.D., Final Thesis and Documents, Washington University- USA, 2010.

-Advance Computer Course, from NICO- Aligarh, 1990.

-PMP Certified Course, Riyadh, 2012.

-Project Management and Controlling – it Software ( PrimaVera )

Training:

Course name

Year

Executive PROJECT MANAGEMENT PROFESSIONAL (PMP) training from Certified PMP Manager, on the following:

2013

Project Management & project Controlling.

Project Scope & Time Management

Project Cost & Quality Management.

Project Resources & Communication Management.

Project Risk Management and Procurement Management.

Building Management System- Johnson & Johnson.

-Carrier Air-conditioning – Provide the training program- for Heat Load Calculation, Products selection, types of systems, Aware of O&M.

-Medical systems - MEP work designing and installation and O &M, under the Supervision of King Faisal Specialist Hospital.

-Special Management Training – how to deal with urgent and critical problems, how to manage the team, to achieve the target in specific target.

-Factory visits – training ongoing production line installation and quality control procedures and testing and commissioning. Attend the Factory test Acceptance ( FATS ) of MEP equipment’s.

-Many seminars of different companies to have the update information of new products and technology coming in the markets.

2013

1997

1994

1994

1996

2004

Summary:

Twenty Six (26) years’ experience on Mega Projects__

Recently working on one of biggest Airport in Saudi Arabia, Abdul Aziz International Airport (KAIA) as a member of Core Technical Team and Project Development Team.

Before that worked - one of the biggest project in GGC - “ King Abdullah Financial District” – (KAFD), it is high tech sophisticated latest city in Riyadh, it consist mostly High Rise Towers - Commercial Towers, Five Star Hotels, Banks and Residential Towers etc., and with high tech latest facilities and infra-structure. These projects cost more than Billion Saudi Riyals.

And also worked on other projects in different locations like Prince Palaces, Hospitals, Airport, Commercial Centers, Residential Compounds, Ministry Headquarters, Big Complexes, Industrial projects, Multistory Buildings, Fast Food Restaurants, Jama Masjid Mosques, Education centers, Hospital facilities, Recreation centers, Industrial projects etc.

As having experience in the designing & Supervision of Mechanical systems – HVAC, Plumbing ( Portable water, Storm Water, Irrigation system, pumping stations), Fire Fighting Systems. Developing the Designing drawings Plans, Isometric Views with details sections, it design calculations as per International Codes ASHRAE, NPC, UPC, NFPA, SMACNA, ASPE, ETC. And follows Local Authorities Codes like BALADIYA, CIVIL DEFENCE, NWC, SEC, etc. and follow them to get its Approvals.

For HVAC( Heating,Ventication,Air Conditioning) – Doing Heat Load Calculation, used design software develop by me( As per Ashrae std.) and also such HAP / E-20 by Carrier, Elite, Zamil software, Duct sizing, piping sizes, pressdrops, Special Smoke Evocation from Highrise buildings (Smoke Management), Basements Exhaust System, develop infrastructure - chilled water piping networks.

Worked in Ministry Of Municipal and Water Department – evolves in Design and study of water projects, Sewage Waste systems, Water Treatment Systems like RO system, Chemical treatment process to soften the Water properties, Pumping Stations, Water networks, Designing city water network system with different locations Pumping stations and supply of portable water, Filtration system and Recycling Grey water system. Preparing the design reports, doing technical analysis, Hydraulic calculations, involving in Infrastructure developments - finalizing Mechanical Piping designing and Layout as per Codes and Standards like ASME ( as B3 associated with piping codes & Std.), API and NFPA. Also develop Tunnels, Channels, piping of large pipe sizes of GRP, RTRP, FRP and other utilities pipelines and its Inspection Chambers, Manholes and also for Valves, pump stations, etc.

Prepare Civil Défense drawings for Fire Fighting systems, doing Hydraulic calculations, Designing of fire Pumps and fire fighting piping’s . Finally prepare project documents, O&M manuals, As Built drawings, Tender documents with complete Technical Specifications.

Review the Shop Drawings, Material Submittals, Method statements, Factories Visits, Sample Module. Change Orders review, Participate with Financial aspects and Schedule planning of the project. Finally do testing and commissioning of all Mechanical systems and handle Over of all official documents and Close Outs.

Developing the Details design reports, Specifications, final tender documents, Doing Coordination with all other Departments like Electrical, Architectural, Structure, to minimize the Site problems by developing well Coordination Drawings and discussed all Technical aspects as fulfil all Clients requirements.

Also, doing Project Cost Analysis, focusing on Time and Risk factors and finalizing after doing all Value Engineering Analysis of the Projects ap per Client Financial budget, Accordingly fixed the Main Milestones, and generate the Critical Path which should be follow doing Construction phases. Try to provide alternate solutions and Engineering Models.

Conducts time to time Meetings with our Technical Teams, Client, Contractors and sub contactors to discussed on going technical issues, ongoing progress. Try to accumulate and resolve the contractual obligations of the stakeholders.

Review and Approved the Shop Drawings, Material submittals, Method of statements, Daily Inspection Requests (IR), Material Inspection Requests (MIR), Provide technical solutions regarding daily on going issues, Monitor and inspect site Works being undertaken by the contractors/subcontractors and monitor overall progress. Also, conduct the combine site walk with contractors and subcontractors to visit all that areas having the site issue or any obstacle to discuss on site how to rectify this issue and provide what are best possibilities to resolve it. Provide the required drawings and relevant documents with all details as per International Standards ( NFPA, NPC, ASHRAE, SMACNA, UPC, ASTM, UL, others) to get approval from Civil Defense ( Fire Fighting ), Baladiya by provide drawings and all other supporting documents as Per NFPA, UPC, ASHRAE, ASTM standards.

Review the contact documents accordingly done Resources arrangements, relocate the materials and equipment’s as planned schedule, and prepare all relevant documents accordingly. Procured Materials and Equipment’s and deals with subcontractors and suppliers. Participate all meeting (i.e schedule review meeting, progress meeting, coordination meeting, and constructability review meeting and so on). Finally ready Projects Drawings, BOQ, project tender documents, Prepare and arrange all shop drawings, Materials procurement, finalize contract with sub contractors and supplies, Preparation the project reports which comprise graph and charts, and discuss various project activities with General Manager. Participate with planning team and management to discuss what are the major steps and procedures to adopt that help to achieve our target. Checking the status of daily and weekly progress report.

Further, Designing the MEP systems as per International Standards after review project documents

like - HVAC, Plumbing, Fire Fighting systems, calculate the Air Conditioning Heat Load calculation, Air duct designing and its layout, and detailing of the drawings, systematic layouts mechanical systems, drainage systems, Cold & Hot water supply system, storm water system, Firefighting Protection systems, HVAC, Piping of different types of gases, and Building Management System (BMS). Selection of materials & equipment’s. Supervision, inspection & commissioning of mechanical works. Also, preparing the detail shop drawings using the AutoCAD.

Managing, Planning and controlling the Projects activities, lead the Engineers and technical teams and provide technical solutions, doing coordination and manage the all aspects to ensure achieve the company targets. Monitoring and keeping track of work progress throughout the construction process and comparing this with projected schedule. Develop good coordination with all technical and administration departments to fulfilling the Contractual Obligations. According to Project Base Line program – Planning all Project activities, keep Eyes on Critical Path activities throughout all phases, try to achieve each Milestone on time in order to execute the project on time.

Experience:

Project name

:

King Abdul Aziz International Airport (KAIA), Jeddah, KSA.

Company Name

:

Projacs / Egis ( Engineering Consultant) From : Nov 2016 – till Today

Client

Position :

:

GACA – General Authority Of Civil Affairs

Sr. Mechanical Engineer ( Designing Team)

Role in this project

:

1-Involving in Airport and Buildings facilities development and Integration with SAS ( Special Airport System ).

2-Follow up with Airport work progress and developing technical reports and highlight the major issues which causing delay of the project - of ATC Tower, PTB (Passenger terminal Buildings Zones), Data Centers, Load centers, Fuel Form, Ratio Sites, Nursery House, Parking Areas, Main Transportation Area, and Railway Station. Water Treatment Plant, etc.

3-As having experience in the designing Mechanical systems – HVAC, Plumbing ( Portable water, Storm Water, Irrigation system, pumping stations), Fire Fighting Systems. Developing the Designing drawings Plans, Isometric Views with details sections, it design calculations as per International Codes ASHRAE, NPC, UPC, NFPA, SMACNA, ASPE, ETC. And follows Local Authorities Codes like BALADIYA, CIVIL DEFENCE, NWC, SEC, etc. and follow them to get its Approvals.

4-For HVAC( Heating,Ventication,Air Conditioning) – Doing Heat Load Calculation, used design software develop by me( As per Ashrae std.) and also such HAP / E-20 by Carrier, Elite, Zamil software, Duct sizing, piping sizes, pressdrops, Special Smoke Evocation from Highrise buildings (Smoke Management), Basements Exhaust System.

5-Design and study of water projects, Sewage Waste systems, Water Treatment Systems like RO system, Chemical treatment process to soften the Water properties, Pumping Stations, Water networks, water network system with different locations Pumping stations and supply of portable water, Filtration system and Recycling Grey water system. Preparing the design reports, doing technical analysis, Hydraulic calculations.

6-Prepare Civil Défense drawings for Fire Fighting systems, doing Hydraulic calculations, Designing of fire Pumps and fire fighting piping’s. Finally prepare project documents, O&M manuals, As Built drawings, Tender documents with complete Technical Specifications.

7-Review the Shop Drawings, Material Submittals, Method statements, Factories Visits, Sample Module. Change Orders review, Participate with Financial aspects and Schedule planning of the project. Finally do testing and commissioning of all Mechanical systems and handle Over of all official documents and Close Outs.

8-Developing the Details design reports, Specifications, final tender documents, Doing Coordination with all other Departments like Electrical, Architectural, Structure, to minimize the Site problems by developing well Coordination Drawings and discussed all Technical aspects as fulfil all Clients requirements.

9-Also, doing Project Cost Analysis, focusing on Time and Risk factors and finalizing after doing all Value Engineering Analysis of the Projects ap per Client Financial budget, Accordingly fixed the Main Milestones, and generate the Critical Path which should be follow doing Construction phases. Try to provide alternate solutions and Engineering Models.

10-Conducts time to time Meetings with our Technical Teams, Client, Contractors and sub contactors to discussed on going technical issues, ongoing progress. Try to accumulate and resolve the contractual obligations of the stakeholders.

11-Participate with planning team and management to discuss what are the major steps and procedures to adopt that help to achieve our target.

12-Attend the internal and external meeting – Consultants Engineers, Contractors, Stack Holders.

13-Our Focusing on Critical Path activities throughout all phases, try to achieve each Milestone on time in order to execute the project on time. Highlight the projects activities, and doing planning and controlling the systems, Progress according to Look ahead program, minimizing Risk factors.

14-keep Eyes on Critical Path activities throughout all phases, try to achieve each Milestone on time in order to execute the project on time.

15-Managing the projects activities, and doing planning and controlling the systems, Progress according to Look ahead program, minimizing Risk.

16-Regularly visiting the Site to provide best solutions to resolve the site issues as per site conditions, and check the site ongoing work, quality, and work progress.

17-Checking and Verifying the status of weekly progress report, Weekly Progress tracking sheet, Weekly construction obstacle report, Weekly shop drawing log and Weekly progress status, also prepare and updating the monthly executive report.

Position

:

Sr. Mechanical Eng. / MEP Design Engineer

Duration

:

July2011 – Nov2017

Employer

:

DAR AL- RIYADH CONSULTANTS, Riyadh, KSA

Projects

:

KING ABDULLAH FINANCIAL DISTRICT ( KAFD )

Project name

:

PPA 30, King Abdullah Financial District (KAFD), RIYADH, KSA.

KING ABDULLAH FINANCIAL DISTRICT

King Abdul Aziz International Airport (KAIA), Jeddah, KSA.

Role in this project

:

Review the Design drawings and Specifications and approved the Shop drawings, Material Submittals and Also provide the Technical solution as occur during Construction of Project.

Interaction with the Inspectors and Engineers/ Managers of Contractors - on day to day basis for the progress of works at sites

Managing, Organizing site Engineers and technical teams to achieves our targets.

Review and Approved the Shop Drawings, Material submittals, Method of statements, Daily Inspection Requests (IR), Material Inspection Requests (MIR), Provide technical solutions regarding daily on going issues, Monitor and inspect site Works being undertaken by the contractors/subcontractors and monitor overall progress. Also, conduct the combine site walk with contractors and subcontractors to visit all that areas having the site issue or any obstacle to discuss on site how to rectify this issue and provide what are best possibilities to resolve it. Provide the required drawings and relevant documents with all details as per International Standards ( NFPA, NPC, ASHRAE, SMACNA, UPC, ASTM, UL, others) to get approval from Civil Defense ( Fire Fighting ), Baladiya by provide drawings and all other supporting documents as Per NFPA, UPC, ASHRAE, ASTM standards.

Regenerate the Drawings and all relevant details and documents.

Reviewing and assessing the Material submittals, methods of Statement, shop drawings and all other submittals like Daily Inspection Requests ( IRs), Material Inspection Requests (MIRs), Long lead Procurement schedule, work breakdown reports, site Progress reports.

Reviewing and doing technical analyses of the daily site issues face by technical team and provide technical solutions and guidance to our team how to resolve these issues, how to improve the quality and how to expedite the work progress on site.

Regularly visiting the Site to provide best solutions to resolve the site issues as per site conditions, and check the site ongoing work, quality, and work progress.

Reviewing and approving the Payment certificate( IPC) submitted by the contractors as per approved and agreed procedures, after Checking the break down percentage of each activity done on site.

Participate with planning team and management to discuss what are the major steps and procedures to adopt that help to achieve our target.

Checking and Verifying the status of weekly progress report, Weekly Progress tracking sheet, Weekly construction obstacle report, Weekly shop drawing log and Weekly progress status, also prepare and updating the monthly executive report.

3)

Position

:

Sr. Projects Engineer

Duration

:

Nov 2006 – To Jul2011

Employer

:

Zuhair Faiz Engineering Consultant

Role in this project :

Design different building services like HVAC, Plumbing, Fire Protection systems, Irrigation systems.

Preparing & Providing Line Diagram drawings to Contractors.

Design and study of water projects, Sewage Waste systems, Water Treatment Systems like RO system, Chemical treatment process to soften the Water properties, Pumping Stations, Water networks, Designing city water network system with different locations Pumping stations and supply of portable water.

Doing supervision &Inspection of mechanical systems on different sites.

Doing Heat Load Calculation, used design software develop by me( As per Ashrae std.) and also such HAP / E-20 by Carrier, Elite, Zamil software, Duct sizing, piping sizes, pressdrops, Special Smoke Evocation from Highrise buildings (Smoke Management), Basements Exhaust System.

Approval of shops drawings and materials submittals by the contractors.

study of water projects, Sewage Waste systems, Water Treatment Systems like RO system, Chemical treatment process to soften the Water properties, Pumping Stations, Water networks, water network system with different locations Pumping stations and supply of portable water, Filtration system and Recycling Grey water system. Preparing the design reports, doing technical analysis, Hydraulic calculations.

Doing coordination of our drawings with Electrical, Architecture, Structure, and landscape departments to insure and minimize the problems to occur on site.

Preparing of design drawing for HVAC & Plumbing layout and detail shop drawings with different sections.

Fire Fighting systems, doing Hydraulic calculations, Designing of fire Pumps and fire fighting piping’s. Finally prepare project documents, O&M manuals, As Built drawings, Tender documents with complete Technical Specifications.

Preparation the project reports which comprise graph and charts, and discuss various project activities

Attend the meeting with different contractors for coordination of various project activities.

Planning and Scheduling all project activities and doing analyzing the progress to ensure reliable results to fulfill our objectives

Responsible for Site Supervision, Quality Assurance and Quality Control of all works (housing, Buildings, sports facilities and industrial).

Inspection equipment and materials in the factory prior to delivery of these at site.

Prepare weekly and monthly quality reports to be discussed with the chief of Quality Assurance.

Reviews drawings, specifications and codes if implemented correctly at site.

Checking the drawings and material submittal to confirm with specifications and codes.

4)

Position

:

Projects Engineer ( Head Of Mech. Dept.)

Duration

:

July 2001– Nov 2006

Employer

:

AL Yamama Engineering Consultant, Riyadh, KSA

Projects

Position

:

Private Projects / Government Projects

Head of Designing Mechanical Dept.

Role in this project

:

Design different building services like HVAC, Plumbing, Fire Protection systems, Irrigation systems.

Preparing & Providing Line Diagram drawings to Contractors.

Doing supervision &Inspection of mechanical systems on different sites.

Approval of shops drawings and materials submittals by the contractors.

Schedule the different projects activities and accordingly arrange our technical staff to different sites as priority.

Doing coordination of our drawings with Electrical, Architecture, Structure, and landscape departments to insure and minimize the problems to occur on site.

Preparing of design drawing for HVAC & Plumbing layout and detail shop drawings with different sections.

Preparation the project reports which comprise graph and charts, and discuss various project activities

Attend the meeting with different contractors for coordination of various project activities.

Planning and Scheduling all project activities and doing analyzing the progress to ensure reliable results to fulfill our objectives

Responsible for Site Supervision, Quality Assurance and Quality Control of all works (housing, Buildings, sports facilities and industrial).

Inspection equipment and materials in the factory prior to delivery of these at site.

Prepare weekly and monthly quality reports to be discussed with the chief of Quality Assurance.

Reviews drawings, specifications and codes if implemented correctly at site.

Checking the drawings and material submittal to confirm with specifications and codes.

Responsible for coordination of works with adjoining packages.

Confirming the material being delivered at site is approved one and from approved source/supplier.

5)

Position

:

Technical Manager

Duration

:

Oct 1999 – June2001

Employer

:

Arabian Consolidated Trading & Contracting ( ACT GROUP OF Companies), RIYADH.KSA

Projects

:

Multiple Projects

Project name

:

ACT Group – Head Office in Jubail, branch offices in Riyadh, Khobar, Dammam, Jeddah. Mainly they are dealing with Aramco, Royal Commission, Sabic, Ministries and other big Projects.

Duration

:

2 Years, From: Oct 1999 – June2001

Type of project

:

Multiple projects

Client

Different clients.

Scope of work

:

Done jobs for the following projects:

For:

(A) AL ASKAR CONSULTANT: Done the Designing of six projects of Ministry Of Education, these are big Education center located in Madina, Hail, Abha, Baha, Tabouk, and Najran. Provide detail drawings, specifications, bill of quantity for HVAC, Plumbing, Firefighting, and Irrigation systems.

(B) Head quarter Of Air Force in Riyadh, Ministry Of Defense Project: Multi stories Head quarter building equipped with latest systems, main job we done designing of smoke Management system – evacuation of smoke fumes from the building as per NFPA standards, further HVAC and Plumbing works, site inspection, prepare submittals, detailing of shop drawings.

(C) Al Romaysa Contracting: mainly MODA projects, Hospital projects, other private projects – we done designing, Preparing Bill of quantities, Tender biddings, drawing and material submittals, Supervision and inspection all Mechanicals works.

Role in this project

Managing and coordinating all activities of Electro-Mechanical division. Estimating Air Conditioning Heat Load calculation for the projects.

Prepare details drawings and sections details and finalize the shop drawings and also finalize the material submittals in guidance of Design drawings and specifications. Review the contact documents accordingly done Resources arrangements, relocate the materials and equipment’s as planned schedule, and prepare all relevant documents accordingly. Procured Materials and Equipment’s and deals with subcontractors and suppliers. Participate all meeting (i.e schedule review meeting, progress meeting, coordination meeting, and constructability review meeting and so on).

Preparing of design drawing for HVAC & Plumbing layout and Fire fighting.

Design different building services like Plumbing, sewage, HVAC, Fire Protection systems, Irrigation systems, Steam Boilers, Air compressors, Heat Exchangers & Select the Chillers, Pumps, Fans, Generators, Treatment Plant, Boilers, Exchangers, different types of controls which require as per our Project requirements.

Preparing & Providing Line Diagram drawings to Contractors.

Inspection, Testing, and Commissioning of electromechanical systems.

Approval of shops drawing and materials submittals by the contractors .

Preparation the project reports which comprise graph and charts, and discuss various project activities with General Manager.

Attend the meeting with different contractors for coordination of various projects activities.

Planning and analyzing the progress to ensure reliable results.

Scheduling the activities and follow-up to fulfill our objectives.

Lead the team and providing support to manage different aspects to reach them to the target.

Preparation the project reports which comprise graph and charts.

Attend the meetings for coordinating various Company activities.

Supporting the staff and following policies to achieve company goal.

Preparing routine maintenance charts and preventive maintenance programs ( daily, weekly, monthly ) in accordance to equipments maintenance schedule for each system.

Planning and arranging our staff on different sites to achieve the progress in desire time.

Handling batch of Engineers, supervisors, and technicians of different discipline to executive the work in proper way.

Issue daily Job Orders to each dept. engineers and follow up daily job order report to know the status of activities.

Estimating and preparing bill of quantities for new projects, Further negotiates with different contractors to execute the work in given budget.

Firming by daily consuming materials and Spare parts requirement to procurement dept.

-

6

Position

:

Head office of BADR AL- DUGHAITHER, Riyadh

Duration

:

Sep. 1997 – Oct1999

Employer

:

Head office of BADR AL- DUGHAITHER, Riyadh

Projects

:

Commercial building – Olaya, Riyadh

Project name

:

Badr Commercial building

Duration

:

2Years, From: Sep. 1997 – Oct1999

Type of project

:

Commercial Center

Client

:

Owner of the company

Scope of work

:

Multiple high rise commercial

Scope of work

:

Construction of Commercial Center.

Role in this project

:

Managing and coordinating all activities of Construction Project.

Estimating Air Conditioning Heat Load calculation for the projects.

Preparing of design drawing for HVAC & Plumbing layout and Fire fighting.

Design different building services like Plumbing, sewage, HVAC, Fire Protection systems, Irrigation systems and Select the Chillers, Pumps, Fans, Generators, Treatment Plant, Boilers, Exchangers, different types of controls which require as per our Project requirements.

Preparing & Providing Line Diagram drawings to Contractors.

Inspection, Testing, and Commissioning of electromechanical systems.

Approval of shops drawing and materials submittals by the contractors .

Preparation the project reports which comprise graph and charts, and discuss various project activities with General Manager.

Attend the meeting with different contractors for coordination of various project activities

7)

Position

:

Sr. Mechanical Engineer.

Duration

:

Nov.1993 – Nov.1997

Employer

:

Headquarter of Ministry of Municipal And Rural Affairs.

Projects

:

Ministry Projects

Project name

:

MOMRA Headquarters, Different Ministries Projects.

Duration

:

4 Years, From: Nov.1993 – Nov.1997

Type of project

:

Construction of Ministries Projects.

Client

:

Ministry of Municipal And Rural Affairs

Scope of work

:

Construction of Ministries Projects.

Role in this project

:

Estimating, detailing of new projects for HVAC & Plumbing works.

Supervision, Inspection, Testing, and Commissioning of mechanical systems.

Handling team of Engineers and Technicians and instructing them how to shoot the problems.

Approval of drawing and materials / Equipment’s by the contractors

Inspection, Testing, and Commissioning of electromechanical systems.

Liaison work with contractors and with other ministry Depts.

Forward weekly, monthly reports to General Manager which comprise of Graphs and Charts.

Attend meeting with Project manager for coordination of various project Activities.

7) Ministry Of Agriculture and water - Riyadh.

Position: Sr. Mechanical Engineer.

Period : 2 years (1991 - 1993 ) .

Responsibilities / Nature of job:

In Water Supply Department, dealing with plumbing projects of the kingdom

mainly water supply to different localities, Agriculture forms and cities .

Our major responsibilities are Design & execution, maintenance, modification

Trouble shooting of the projects - in short following activities :

* Design of Projects and the maintenance of the projects.

* Handling of critical problems coming due to special reasons.

* Lead different Contractors and provide details of Design of projects to execute it

up to the final stage .

* Periodically visit to different projects and provide report to Director General .

* Preparation of tender documents, bids evaluations, recommendations .

8) Sariya Trading & Contracting Est. - Riyadh.

Period: 1 year (1990 -1991)

Worked as Mechanical Engineer -

* Preventive maintenance of Mechanical equipment’s .

* Execution of Electro-Mechanical works .

* Led the team of Technical staff .

Name Of Projects:

1- Kingdom one of biggest Mega project- (KAFD) – King Abdullah Financial District.

2- In CORE TEAM – For Ministry of Interior projects in Riyadh, Jeddah, Dammam

3- Prince Palace – Sultan Bin Abdul Aziz Project – Argah – Riyadh

4- Prince Palace – Prince Mugrin Bin Abdul Aziz – Dariyah - Riyadh

5- Saudi Royal Naval Force ( SRNF) Administration building – Al Kharj.

6- Prince Turki bin Bin Abdul Aziz Palace – Riyadh

7- Prince Abdul Aziz Bin Saud Bin Fadh - Riyadh

8- Big Commercial Project – Johra AL Falaq – PR.