FRANCIS P T
VILLA NO: **
FIRST FLOOR
DOOR NO: *
NEAR NEW SALATA PARK
NEW SALATA
DOHA
MOB: +974********
E MAIL ID: ac86ku@r.postjobfree.com
CAREEER OBJECTIVE
To excel in my field of Electrical Engineering through hard work, research, skills and perseverance.
To serve my parents, and my country with the best of my abilities.
PROFESSIONAL EXPERIENCE
1. Company : LEENA POWERTECH ENGNEERS PVT LTD. MUMBAI
Designation : SITE INCHARGE (Electrical)
Duration : 5th May 2014 to 18th August 2018
Responsibilities
Lighting & Power distribution system
Lighting Protection and Earthing system
300 / 120 SQ mm HT cable laying
Cable termination / Straight through joints.
Preparation of estimate Installation and related man power requirements in the site
Transformers & RMU errection.
Drawing co-ordination of main ring & sub ring Drawings.
Testing and commissioning of the above Installations.
Operation and maintenance of the Electrical Installation.
2 . Company : VS Electricals
Designation : Electrical Supervisor.
Duration : 10th October 2013 to 1st may 2014
Responsibilities
Lighting & Power distribution system
Lighting Protection and Earthing system
LT cable laying
Cable termination
Preparation of estimate
Panel board erection and wiring for High rise Buildings
Drawing co-ordination of single line diagrams, lighting layouts and earthing layouts.
Testing and commissioning of the above Installations.
Operation and maintenance of the Electrical Installation and related man power requirements in the site
Daily Shift Arrangements
3. Company : Ashapura Mine chem Limited. {Ashapura Group of Industries}
Designation : Supervisor-Electrical.
Duration : 26th November 2007 to 8th October 2013
Product : Kaolin.
Responsibilities
Detailed Engineering, Installation of 2 Nos 1600 KVA Transformer and its interlocking system.
. Detailed Engineering, Installation of 2 Nos 600 KVA DG Set and its interlocking system.
Lighting & Power distribution system
Lighting Protection and Earthing system
HT & LT cable laying
Erection of Transformer, VCB panel PCC and MCC’s
Cable termination
Preparation of estimate
Panel board erection and Industrial wiring
Drawing co-ordination of single line diagrams, lighting layouts and earthing layouts.
Testing and commissioning of the above Installations.
Operation and maintenance of the Electrical Installation related with Machine erection.
Operation and maintenance of compressor.
Maintenance & erection commissioning of ACS 550 series V.F.D, PSTB series soft starters up to 215 H.P.
4. Company : Raja Electricals
Designation : Electrician cum Supervisor.
Duration : 25th August 1998 to 21st August 2003
Responsibilities
Lighting & Power distribution system
Lighting Protection and Earthing system
LT cable laying
Cable termination
Preparation of estimate
Panel board erection and wiring for High rise Buildings
Drawing co-ordination of single line diagrams, lighting layouts and earthing layouts.
Testing and commissioning of the above Installations.
Operation and maintenance of the Electrical Installation and related man power requirements in the site
Daily Shift Arrangements
5. Company : H.K.T Mining Pvt. Limited. (Steel plant)
Designation : Senior Technician -Electrical. (On contract Kairali Engg Limited)
Duration : 10th March 2005 to 9th march 2006
Responsibilities
Lighting & Power distribution system
Lighting Protection and Earthing system
HT & LT cable laying
Erection of Transformer, VCB panel PCC and MCC’s
Cable termination
Panel board erection and Industrial wiring
Drawing co-ordination of single line diagrams, lighting layouts and earthing layouts.
Testing and commissioning of the above Installations.
Operation and maintenance of the Electrical Installation related with Machine erection.
Operation and maintenance of compressor.
Erection, commissioning and maintenance of Continuous Casting Machine
Errection, commissioning & maintenance of over head cranes up to 100 tones
Errection, commissioning & maintenance of VFD’S (ABB & ALLEN BRADLEY)
6. Company : Hindustan Latex Limited. (Govt. of India undertaking)
Designation : Apprentice Electrician
Duration : 28th August 1997 to 21st August 1998
Responsibilities
Cable lying, concealed wiring of light circuit and Power circuit in the Plants, office etc.
Preventive maintenance of ACB contactors,Overload relays,ON-OFF Push button station, MCB’s, Secondary control systems, Light circuits, Star Delta starters, DOL starters and Limit switches etc
Rewinding of Single phase and three phase induction motors, ceiling fan, cabin fans and repair, Overhauling, bearing replacing and assembling etc.
Knowledge of Operation system in 11 KV Transformer, HT, LT, OCB’s, change over system of 1000 KVA Generator supply& KSEB Supply and other Distribution systems etc. in the centralized substation.
EDUCATIONAL SUMMARY
Sl. No
Course Name
Board / University/ Institution
Percentage of Marks
Year of Passing
1
SSLC
Board of Public Examination.
AMR High School, Thirumala. Trivandrum
60.83 %
1992
2
ITI Electrical
National council for Vocational Training [Govt. ITI Chackai, Trivandrum, Kerala]
68.42%
1994
3
Diploma in Electrical
Karnataka state open university (KSOU)
78.83
2014
PERSONAL INFORMATION
Date of Birth : 06-12-1976
Sex : Male
Nationality : Indian
Present Address : Qatar, Doha
Marital Status : Married
Religion &caste : Christian, Nadar
Languages Known : English, Hindi, and Malayalam
Passport No : N 5424711
Date of Expiry : 14-12-2025
Visa No : 382*********
Qatar ID No : 276********
DECLARATION
I here by declare that the above-mentioned information’s are true to the best of my knowledge.
Place: Qatar, Doha FRANCIS P.T