Post Job Free
Sign in

Mechanical Superintendent / Rotating & Static Equipment Inspector

Location:
Lucena, Quezon, 4301, Philippines
Posted:
April 20, 2019

Contact this candidate

Resume:

ALEJANDRO B. BALADHAY

Saint Claire St. San Antonio Subdivision

Little Baguio II, Red-V

Lucena City

Tel. # +63-042-***-**** / +63-042-***-****

Mobile # +639********* / +639********* / +639*********

E-mail: mailto:**********@*****.***

*********@*****.***

Nationality : Filipino

Date of Birth : July 10, 1955

Position : Mechanical Inspector/ Piping Inspector/ Mechanical Supervisor/

Mechanical Technician/ Permit Receiver and Coordinator

Rotating and Static Equipment Inspector

Marital Status : Married

Educational : Bachelor of Science in Mechanical Engineering

Attainment Feati University, Manila Philippines

Passport Number: EC8206897 Date of Issue: 04 July 2016 / Valid Until: 03 July 2021

WORK EXPERIENCE SUMMARY:

More than 30 years experience in Oil and Gas Industry with different companies (Projects) in Engineering, Construction, Inspection and Quality Control, Diversified experience includes construction of Buildings, Refineries, Cross-country Pipelines, Pumping Stations, and Oil and Gas / Industrial / Nuclear Power / Chemical / Sewage Treatment Plants. Wide range of proficiency in Process Rotating and Static equipments, such as Gas & Steam Turbine, Centrifugal Compressor, Boilers, Blowers, Hi-pressure pumps, Fin-fan coolers, Storage Tanks, Vessels, Columns and Exchangers. Familiar with International codes and Standards, such as API (American Petroleum Institute) and ASME (American Society of Mechanical Engineers).

OCCIDENTAL MUKHAIZNA LLC

SULTANATE OF OMAN

SEPTEMBER 2010 to NOVEMBER 2015

Position: Rotating and Static Equipment Inspector / Mechanical Technician

Responsibilities:

Responsible for performing daily inspection activities which involve the receiving, installation, periodic preservation maintenance of rotating equipment by utilizing advanced technical knowledge of inspection codes, standards, applications, as well as applying innovative concepts, technology and skills.

Monitoring day to day activities of the Construction Contractor’s rotating equipment installation activities to ensure compliance with contract documents, specifications, codes and standards.

Brings forward any concerns to the Senior Field QC Inspector with respect to Contractor progress, procedure, code and specification compliance, documentation, safety procedures or environmental compliance.

Inspect and verify that received equipment is properly preserved in accordance with applicable codes, standard practices and company specifications.

Responsible for the detailed recording of maintenance activities and requisition of critical spare parts utilizing the maintenance management system.

Active participation in safety briefings, safety talks and the risk assessment process.

Responsible for the input into the development of maintenance plans and procedures.

Integral part of commissioning team supporting mechanical rotating and static equipment prior for start up.

Support the development and data population of computerized maintenance management system.

Carry out routine site inspection and monitoring the application of the PTW system and performing PTW audits.

Responsible for ensuring compliance of the PTW procedures, and responsible for operating, monitoring and controlling the permit issuance system.

Ensure all documentation necessary for reliable control of work system is in place. This includes but not limited to keep approved updated procedures, P&ID’s, training matrices, MSDS, and equipment certification.

Control the register of approved PTW authorities and update it regularly.

QATAR GAS II and EXXON MOBIL LNG ONSHORE FACILITIES PROJECT

Ras Laffan, State of Qatar

January 2006 to November 2009

Position: Mechanical Inspector (Rotating, Static & Piping)

COMMON SULFUR PROJECT

QATAR GAS II and EXXON MOBIL LNG ONSHORE FACILITIES PROJECT

Ras Laffan, State of Qatar

November 2009 to August 2010

Responsibilities:

Provide full time oversight on all aspect of quality assurance on a USD13.4 Billion LNG Gas Project of QATARGAS Operating Company LTD, with objectives aimed at developing management systems, processes, practices and procedures required to align the project contractors handling activities with established goals for QATARGAS facilities.

Work includes in different phases of construction works such as equipment installation, final alignment and pre-commissioning stage of all rotating and static equipments.

Implements safety procedures, training requirements and management of specific type of quality requirements with the contractor’s representative on site.

Responsible for ensuring that the project facilities are constructed in accordance with the approved project design and specifications, applicable codes / regulations and acceptable work practices.

Provide construction quality assurance support, performing and/or coordinating specific QA/QC activities to ensure compliance of deliverables, with project specifications, during construction.

Provide leadership to contractor inspectors, supervisors and coordinators during project construction.

Maintain and monitor the implementation of approved QA/QC procedures, inspection Plan and Construction Work Methods.

Perform and conduct timely on-site inspection to ensure the construction works complies with drawings, standard and project specification.

Record inspection findings in job site, prepare and issue inspection report and non-conformance report.

Supervised and provide technical assistance to QC personnel and site supervisor

Witness the run-in test of Mechanical Equipment in the plant as per test procedures.

Monitor Mechanical Works of plant Equipment, Fabrication, Repair, Modification, Upgrading and Installation.

Verify and review design drawings with vendor drawing for possible discrepancies.

Conduct final inspection; prepare punch list and verifying completion of punch list item.

Monitor the implementation of all rotating equipment and static equipment preservation and preventive maintenance program.

Responsible for the supervision, testing and inspection of piping works and plant mechanical equipment, installation of the project. Also involves in preparation of hydro test package and turn over documents for mechanical completion and commissioning.

Participate in Mechanical Completion, Acceptance of Facilities.

Involve in the Installation & Inspection of HVAC Units, Ducting, Chilled water piping, Exhaust fan, Pressurization fan, Pumps and other related HVAC works.

Monitor and audit all rotating equipment preservation activities on a day-to-day basis.

Ensure contractor’s compliance with all relevant Quality Assurance Plans, Procedures, Inspection and preservation records

Participate in piping walk down, line checking, punch listing and testing when required

Preparation and execution of Piping Test Packages. Review all test packages as per system, pipeline checking and doing punch list for remaining work subject for hydro testing and final inspection

Control and Production of commissioning work-packs and Operational Test Procedures/

Planning ‘on site’ commissioning activities.

Liaise with Construction Supervisor to ensure Ready for Commissioning documentation is finalized and ready for acceptance.

Direct Construction Supervisor in clearing of any Punch-list items which affect commissioning.

Ensuring safe execution of work to ensure the Health, Safety and Welfare of the workforce and the protection of the environment through the avoidance of releases and spills.

JGC / KBR IN AMENAS GAS PROJECT

In Amenas, Algeria

Nov. 2003 to Oct. 2005

Position: Mechanical Inspector `

Responsibilities:

Supervision and inspection on the contractor and vendor activities for mechanical equipments installation such as pumps, blowers, fin fan coolers, compressors, heat exchanger, generators, storage tanks in conformance to project procedures, specifications and drawings

Work includes in different phases of construction works such as equipment installation, final alignment and pre-commissioning stage of all rotating and static equipments

Implements safety procedures, training requirements and management of specific type of quality requirements with the contractors representatives on site

Watch and record non-conformances

Conduct daily surveillance and assessment to monitor contractor performance, construction status and provide assistance to project personnel on quality related issues and concern to maintain company’s Quality Assurance Program

Implements safety procedures, training requirements and management of specific type of quality requirements with the contractor’s representatives on site.

Monitor Mechanical Works of plant Equipment, Fabrication, Repair, Modification, Upgrading and Installation.

Monitor the implementation of all rotating equipment and static equipment preservation and preventive maintenance program.

Responsible for the supervision, testing and inspection of piping works and plant mechanical equipment, installation of the project. Also involves in preparation of hydro test package and turn over documents for mechanical completion and commissioning.

Participate in piping walk down, line checking, punch listing and testing when required

Preparation and execution of Piping Test Packages. Review all test packages as per system, pipeline checking and doing punch list for remaining work subject for hydro testing and final inspection

Pump Station No. 3 Belabo, Cameroon, Africa

Esso Oil Exploration – Chad Cameroon Development Project

Kellog Brown & Root (KBR)

Sept. 2002 to Aug.2003

Job No. 7606

Position: Piping/Rotating Equipment Inspector

Responsibilities:

Conduct daily surveillance and assessment to monitor contractor performance, construction status and provide assistance to project personnel on quality related issues and concern to maintain company’s Quality Assurance Program

Conducts field inspection on all ongoing pipe spool fabrication and erection and completed piping line installation and welding works and conducts materials inspection as per application standards and required welding procedure

Conducts site inspection on piping fabrication and erection and check if it is as per isometric drawing. Check fit-up and dimensional inspection prior to welding

.

Preparation and execution of Piping Test Packages. Review all test packages as per system, pipeline checking and doing punch list for remaining work subject for hydro testing and final inspection

Preparation and execution of Piping Test Packages. Review all test packages as per system, pipeline checking and doing punch list for remaining work subject for hydro testing and final inspection

Participate in piping walk down, line checking, punch listing and testing when required

Responsible for the supervision, testing and inspection of piping works and plant mechanical equipment, installation of the project. Also involves in preparation of hydro test package and turn over documents for mechanical completion and commissioning.

ABDULLAH H. AL-SHUWAYER CONTRACTING CO. LTD

DAMMAM K.S.A.

From 1994-2001

QA/QC SUPERVISOR / FIELD MECHANICAL ENGINEER

CONTRACTS:

Shedgum Gas Plant

Debottlenecking Project

Saudi Aramco Shedgum, K.S.A.

Contract # 45944/00

Position: QA/QC Supervisor

Abqaiq Gas Plant

Upgrade Firewater & Drainage Facilities

Saudi Aramco Project – Abqaiq, K.S.A.

Position: Mechanical/Piping Inspector

Regional Sewage Treatment Plant and Effluent Disposal System.

Saudi Aramco Project, Abqaiq, K.S.A.

Position: QA/QC Supervisor/Field Mechanical Engineer

MOHAMMAD AL-MOJIL GROUP

DAMMAM K.S.A

QA/QC SUPERVISOR / PIPING

CONTRACTS:

Hawtah Stabilzer / ASL Storage and handling Facilities

Saudi Aramco Project, Pump station 3 Wasia, Riyadh, K.S.A.

Position: QA/QC Supervisor

16 “ Ø Truckline Project, Shedgum GOSP 1

Saudi Aramco, Shedgum K.S.A.

Position: Mechanical/Piping Inspector

FRAMATOME –SPIE BATIGNOLLES

PEOPLE REPUBLIC OF CHINA

1992 – 1993

PROJECT;

Guangdong Nuclear Power Station

Unit 1 and Unit 2, Daya Bay

Peoples Republic of China

Position: Piping Inspector

DEMAURO-SHUWAYER CONSTRUCTION CO. LTD

DAMMAM K.S.A

1982 – 1986

CONTRACTS:

Infrastructure Project of Saudi Aramco Pump Station 1 to Pump Station 4 @ East-West Pipeline

Position: Mechanical Inspector

Wave Protection for Refinery Tank Farm / Site Development

Royal Commission for Jubail and Yanbu Project. Jubail K.S.A.

Position: QC Mechanical Engineer

Sewage Treatment Plant Project-Under U.S. Corps of Engineers Management

King Khalid Military City

Hafar Al-Batin, K.S.A.

Position: Mechanical/Piping Inspector

Gas Oil Separation Plant

Saudi Aramco Project

Uthmaniya, K.S.A.

Position: Piping Inspector

JOANNOU AND PARASKEVAIDES OVERSEAS LTD.

DUBAI, UNITED ARAB EMIRATES

1979 – 1981

MAINTENANCE SUPERVISOR

CONTRACT;

Dhaid-Fujeirah Road Project

Position: Maintenance Supervisor

EMPLOYMENT HISTORY:

OCCIDENTAL MUKHAIZNA LLC 2010 - 2015

SULTANATE OF OMAN

Position: Rotating Equipment Inspector / Mechanical Technician

QATARGAS OPERATING COMPANY LTD. 2006 - 2010

LNG GAS PLANT / QATARGAS II PROJECT

RAS LAFFAN, STATE OF QATAR

ROTATING & STATIC EQUIPMENT INSPECTOR

PROJECT MANAGEMENT TEAM (PMT), QA/QC DEPT.

JGC / KBR IN AMENAS GAS PROJECT 2004 - 2005

IN AMENAS, ALGERIA

MECHANICAL INSPECTOR

ROTATING EQUIPMENT INSPECTOR

KELLOG BROWN & ROOT (KBR) 2002 - 2003

PUMP STATION NO.3 BELABO, CAMEROON

TCHAD CAMEROON CONSTRUCTORS (TCC)

ROTATING EQUIPMENT INSPECTOR

ABDULLAH H. AL-SHUWAYER CONTRACTING CO. LTD 1994 - 2001

DAMMAM K.S.A.

QA/QC SUPERVISOR / FIELD MECHANICAL ENGINEER

MOHAMMAD AL-MOJIL GROUP-DAMMAM K.S.A. 1993 – 1994

QA/QC SUPERVISOR

FRAMATOME –SPIE BATIGNOLLES 1992 – 1993

PEOPLE REPUBLIC OF CHINA

QA/QC PIPING SUPERVISOR

ABDULLAH H. AL-SHUWAYER CONTRACTING CO. LTD 1990 – 1992

DAMMAM K.S.A.

QA/QC SUPERVISOR / FIELD MECHANICAL ENGINEER

DEMAURO-SHUWAYER CONSTRUCTION CO. LTD 1982 – 1986

DAMMAM K.S.A

QA/QC ENGINEER (MECHANICAL)

JOANNOU AND PARASKEVAIDES OVERSEAS LTD. 1979 – 1981

DUBAI, UNITED ARAB EMIRATES

MAINTENANCE SUPERVISOR



Contact this candidate