Strength

In-depth Knowledge of Environmental, Health and Safety Policies of World Bank,

Asian Development Bank, European Investment Bank and Japan

International Cooperation Agency;

Ability to Provide Policy Advice.

Well versed with Environmental, Health, Safety, Forestry Regulations and Land

Acquisition and Forest Land Diversion requirements of Govt. of India;

Environmental and Social Compliance Requirements;

In-depth Knowledge on Project Development;

Climate Change, SIA, R&R, Land Acquisition and Diversion(Forest) Proposals,

IEE, EDD,EIA, EMP, CSR and Risk Analysis Reports Preparation;

High Interpersonal and Sound Communication Skills;

Accredited by Quality Council of India

Environmental Coordinator: Mining, Highways, Thermal Power, Townships and Area

Development, Building & Construction

Functional Area Expert: 1.Meteorology, Air Pollution Modeling and Prediction

2. Air Pollution Monitoring, Prevention & Control

3. Noise & Vibration

4. Solid & Hazardous Waste Management

Education

Executive Post Graduate Diploma in International Business from School of International Business, Indian Institute of Foreign Trade (IIFT), New Delhi, 2009 – 2011;

Doctor of Philosophy (Ph. D.) in Environmental Science from School of Environmental Sciences, Jawaharlal Nehru University, New Delhi, 1997;

Master of Philosophy (M. Phil.) in Environmental Science from School of Environmental Sciences, Jawaharlal Nehru University, New Delhi, 1992;

Master of Science (M. Sc.) in Environmental Science from School of Environmental Sciences, Jawaharlal Nehru University, New Delhi, 1990.

Software Skills

Platforms Worked on : MS DOS, Windows

Application Familiar with : MS Office, AutoCAD MAP, MapInfo,

PSI Plot, Statgraf, Page Maker,

Mathcad,

Models : ALOHA,HAZOP-Pro, ProForm v 3.0,

CHAMEO, Screen3, Calpuff and

Aermod

Professional/Research Experience

Duration Designation University/Consultancy

Professional

30 Mar 2017 to Environmental Specialist Aakhivi Consulatnts

Till Date Shatabdi Vihar, Sec 52, Noida

Indian Technocrat Ltd

01 Apr,16 to 28 Mar17 Environmental Specialist Abhiruchi Parisar, Old Subhash Nagar, Bhopal-462 023

Arkitechno, Bhubneshwar.

18 Nov, 2013 to Environmental Safeguard Specialist India Infrastructure Finance Co 31 Mar, 2016 Ltd (IIFCL), 8th Floor, HT Building

KG Road, N Delhi 110 001

22 Feb, 2013 to General Manager Chilworth Technology Pvt Ltd

17 Nov, 2013 Muskaan Complex, Plot 3, B-2

Vasant Kunj, N Delhi-110 070

Mar1998 to General Manager Desein Pvt. Ltd.

21 Feb, 2013 Desein House, G.K.-II

New Delhi - 110 048

Jan 1997 to Environmental Consultant Nuchem Limited

Feb, 1998 20/6, Mathura Road

Faridabad - 121 006

Research (Seven Years)

July, 1992 to Senior Research Fellow SES, JNU

May. 1997 New Delhi - 110 067

July, 1990 to Junior Research Fellow SES, JNU

June. 1992 New Delhi - 110 067

Job (Present) Profile

Ensure that Project complies (R & R plan, Forest Land Diversion, Environment, Health and Safety) with ADB's SPS and Govt. of India’s laws and regulations;

Ensure that the project complies with all environment (including health and safety) safeguard requirements as given in this EARF;

Provide necessary technical advice and support to the Project Implementation Unit (PIU) and/or contractor to obtain consents or permissions (e.g. forest clearance, no objection certificate) from relevant Government Agencies. Also ensure that all necessary regulatory clearances are obtained prior to commencing any civil work of the subproject;

Ensure that contractors have access to the Initial Environmental Examination (IEE) report including Environmental Management Plan (EMP) of the subprojects;

Ensure that contractors understand their responsibilities to mitigate environmental, health and safety problems associated with their construction activities;

Closely coordinate and communicate with the contractor to facilitate implementation of all mitigation measures identified in EMP;

Conduct training and awareness programs on implementation of environment safeguards for MPRDC, PIU and the contractors during the pre-construction stage and further organize on the job or subject specific training for the contractor during project implementation as necessary;

Conduct regular on site monitoring to ensure proper implementation of the EMP including R & R and Environmental Monitoring Plan;

Prepare monitoring checklists and/or reports based on the site monitoring and submit them to the PIU for approval;

Ensure that construction workers work under safe and healthy working environment;

Facilitate effective implementation of the Grievance Redress;

Prepare semi-annual monitoring reports for sub-projects on the implementation of EMPs for submission to PIU and MPRDC and further submission to ADB for disclosure on the ADB website.

Packages Handled

Site Selection, Land Acquisition Proposal, Forest Land Diversion Proposal, Environmental Impact Assessment Report, Preparation of Environmental, Health, Safety and Social Due Diligence Report, Risk Analysis, Disaster Management Plan, Forest Clearance, Site Clearances, R & R Plan including CSR, Wild Life Conservation Plan, Area Drainage Study, Soil and Geotechnical Study.

Other Achievements

•Lead Auditor ISO 14001

•Fellowships

J.R.F. (July, 1990 - July, 1992) and S.R.F. (July, 1992 - July, 1997) Awarded by University Grants Commission.

Graduate Aptitude Test in Engineering (GATE 1991) Qualified.

Publications

•Singh, Bhavesh K., Jain, V.K. and Attri, Arun K.,"Estimates of Tropospheric Ozone Column Over Delhi." Atmospheric Environment (Communicated);

•Singh, Bhavesh K., Jain, V.K. and Attri, Arun K., "Spatial Distribution of Noise Around Residential Areas in the Vicinity of High Traffic Zones in Delhi." Journal of Acoustical Society of India, xx (1-4), 25 - 28, 1992.

Papers Presented

•Singh, Bhavesh K., Attri, Arun K and Jain, V.K., "Measurements of UV Levels and Estimation of Aerosols Optical Depth in Delhi," at International Conference on Plants and Environmental Pollution, Lucknow, 26 to 30 November, 1996;

•Singh, Bhavesh K., Jain, V.K. and Attri, Arun K, "Distribution of UV-A, UV-B and UV-C During Winter Months of Delhi," at 10th Annual Congress on Man and Environment, 8 to 10 March, 1995, National Institute of Oceanography, Goa.

Workshops Participated

•“CALPUFF Air Dispersion Modeling” Course Organized by Lakes Environmental Software, Canada and LaGa Systems, India at Hyderabad, 14-16 December, 2011;

•“AERMOD Air Dispersion Modeling” Course Organized by Lakes Environmental Software, Canada and LaGa Systems, India at Hyderabad, 12-13 December, 2011;

•“AERMOD Air Dispersion Modeling” Course Organized by Lakes Environmental Software, Canada and LaGa Systems, India at Hyderabad, March, 2011;

•“Workshop on Re-Engineered Process of Environmental Clearance” organized by Confederation of Indian Industry at Ranchi, Jharkhand on 28 May, 2007;

•“Workshop on Occupational Health and Safety: Workplace Risk Assessment & Management", held at PHD House, New Delhi on 15 January, 2004;

•"IEMA Approved Advanced EMS Auditor Course for both Quality and Environmental Professionals" delivered by BSI Business Solutions Ltd., London (June 2003);

•"Programme on Managing Hazards in Chemical & Allied Industries" Sponsored by Ministry of Environment & Forests, Govt. of India, Organized by The Associated Chambers of Commerce and Industry of India, New Delhi, 27-28 December, 2002;

•"Programme on Environmental Impact Assessment" Organised by Wildlife Institute of India, Dehradun, 9 - 14, December, 2002;

•"Programme on Hazard and Operability Study (HAZOP)" Organised by National Productivity Council, New Delhi, 21 - 22 November, 2002;

•"National Conclave on Small Hydro Power" Organised by PHD Chamber of Commerce and Industry and Associated Chambers of Commerce and Industry, New Delhi, 18 - 19 July, 2002;

•"Short Course on Air Quality Monitoring, Modeling and Management" held at National Environmental Engineering Research Institute, Nagpur, 17-19 April, 2002;

•"Programme on AutoCAD MAP and MapInfo" held at ER & DCI (Ministry of Information Technology, Govt. of India) Noida, 2-6 July, 2001;

•"Environmental Risk Analysis due to Storage and Handling of Chemicals," Organised by EMRTC, New Delhi, 21-22 September, 2000;

•"Workshops on Approaching Zero Discharge Technologies,"PHD Chamber of Commerce and Industry, New Delhi, 10 March, 2000;

•"Training Course on Stack Emission Dispersion Modelling," Organised by EMRTC, New Delhi, 21-22 September, 1998;

•"Fundamentals of Boundary Layer Physics and its Applications," Sponsored by Department of Science and Technology, Government of India, at School of Environmental Sciences, Jawaharlal Nehru University, New Delhi, 9 - 28 December, 1996.

Building and Construction Projects

i)Environmental Clearance for Vidhya Gayan School, Sitapur, UP

ii)Environmental Clearance for Hamilton Residential

iii)Residential Quarters for NSG Personnel at NSG Camp, Manasar Gurgoan, Haryana by Ministry of Home Affairs, Govt. of India

Other Projects

S. No. Project Description of Duties Present Status

1.Construction of ADB Environmental, Health & Safety Compliance In Progress

Assisted MP District Status of the project during construction

Connectivity Sector Projects & Operation Training, Public Consultations

Package-3, Bhopal-2

2.Yamuna Expressway Environmental & Social Due Diligence Approved by ADB

Greater Noida to Agra Report preparation of Expressway

M/s Jaypee Associate Ltd. During O & M Phase, impact assessment

(including township) of five township being developed and

Ribbon Development. Health and Safety

Issues were also covered.

3.2 x 765 kV Single Circuit Carried out Environmental & Social Approved by ADB

Tiroda-Koradi-Akola- (Health & Safety) Audit to meet the ADB’s

Aurangabad Transmission requirements

Lines along with associated

Sub-stations & Bay in North

East Maharashtra

4.Kiratpur Ner Chowk Expre- Environmental & Social Due Diligence Approved by ADB

ssway Ltd. Report was prepared, carried out consu-

ltation with affected persons and concer-

ned stockholders, site was visited to see

EMP compliance status during construction,

compliance issues & corrective actions.

Calculation of greenhouse gas emission

from vehicles as per ADB guidelines.

5.Sai Maa Tarini Tollways Preparation of Environmental & Approved by ADB

Odisha Social Due Diligence Report,

reviewed Documents/Approvals/

Permissions/NOCs/Clearances. Site

Visit and discussions with local

People, developer & contractors.

Calculation of greenhouse gas emission

from vehicles as per ADB guidelines.

6.Environmental & Social Reviewed documents/data Approved by ADB

Due Diligence Report for Site visit, discussions with site

Etawah – Chakeri (Kanpur) local people, project officials

of NH-2. Utter Pradesh & ADB Officials, preparation of

Report. Calculation of greenhouse gas

Emission from vehicles as per ADB

guidelines.

7.Environmental & Social Review of the documents/data Approved by ADB

Due Diligence Report for Site visit, discussions with site

Chittorgarh-Neemach local people, project officials & calculation

of NH 79 & Nibahera - of greenhouse gas from vehicles as per

Pratapgarh Section of ADB guidelines and preparation of

NH-113 Rajasthan Due Diligence report.

8.Environmental & Social Review of the documents/data Approved by World Bank

Due Diligence Report for Site visit, discussions with site

Concast Dhaneta local people, project officials

Packages for MD Roads, & World Bank Officials

Madhya Pradesh (2 Projects)

9.Environmental & Social Review of the documents/data Approved by World Bank

Due Diligence Report for Site visit, discussions with site

D P Jain Ujjain & Dariyapur local people, project officials

Packages for MD Roads & World Bank Officials

Madhya Pradesh (2 Projects)

10.Environmental & Social Review of the documents/data Approved by World Bank

Due Diligence Report for Site visit, discussions with site

Kakinada Deep Water Port local people, project officials

Kakinada, Andhra Pradesh & World Bank Officials

11.Environmental & Social Review of the documents/data Approved by World Bank

Due Diligence Report for Site visit, discussions with site

Krishnapattam Port local people, project officials

Terminal Project, Nellore, & World Bank Officials

Andhra Pradesh

12.Environmental & Social Review of the documents/data Approved by World Bank

Due Diligence Report for Site visit, discussions with site

Indira Container Terminal local people, project officials

Ltd. Mumbai, Maharashtra & World Bank Officials

13.Feasibility study of Rail/road Sites visits were carried out. Report Submitted

transportation of Product Access to rail and road network

from Barauni Refinery, Bihar for the transportation of Petroleum

to Gujarat Refinery, Vododara were carried out. Regulatory

Mitsubishi Heavy Industries were requirements also considered

India P Limited, Gurgoan.

14.Possibility of Effluent Quality, quantity of effluent,

Discharge into the Effluent Carrying capacity of the Conveyance.

Conveyance Channel Channel were analyzed. Effluent

Mitsubishi Heavy Industries discharge recommendations were made

India P Limited, Gurgoan

15.The Proposed Construction Preparation of Application for Env. Clearance Awarded

of Residential Quarters for Clearance including prefeasibility

NSG Personnel at NSG report. Site visit and environmental

Camp,Manasar Gurgoan, parameters monitoring were also carried

Haryana by Ministry of out.

Home Affairs, Govt. of India

16.Existing TPS Air Pollution study for existing Report Submitted

Expansion, Koradi as well as proposed plants, Project

Nagpur, Maharastra Coordinator

17.5 x 660 MW Dondaicha, Project Coordinator, Data Generation, Report Submitted

Bhusawal, Maharastra Preparation of Environmental Impact

Assessment Report, Environment &

Disaster Management Report including

Risk Analysis and R & R plan.

18.4000 MW Coal Fired Project Coordinator, Data Generation, Clearance Awarded

Orissa Ultra Mega Preparation of Environmental Impact

Power Project, Assessment Report comprising greenhouse

Sundargarh, Orissa. Gas emission & its impact, Environment

& Disaster Management Report including

Risk Analysis, Preparation of R & R Plan,

Preparation of Land Acquisition Proposal,

Forest Land Diversion Proposal, Soil and

Geotechnical Investigation Reports.

Preparation of Wild Life Conservation Plan

and CSR Reports.

19.4000 MW Coal Fired Data Generation, Preparation of Report Submitted

Akaltara Ultra Mega Environmental Impact Assessment

Power Project, Report including Greenhouse gas emission

Surguja, impacts on Environment & Disaster Management

Chhattisgarh. Report including Risk Analysis, Preparation of

R & R Plan Land Acquisition Proposal

Preparation, Forest Clearance, Soil and

Geotechnical Investigation Reports.

20. 2640 MW Coal Fired Project Coordinator, Data Generation, Report Submitted

Gidderbaha Power Preparation of Environmental Impact

Project Muktsar District, Assessment Report, Environment &

Punjab Disaster Management Report including

Risk Analysis, Preparation of R & R Plan.

Soil and Geotechnical Investigation

Reports.

21. Conversion of 4 x 30 Environmental Issues Related to Report Submitted

MW Gas Turbine Conversion, Data Generation,

Power Station Bridge Preparation of Environmental

into Combined Cycle Impact Report, Environment

Mode, TNEB, Basin & Disaster Management Report

Bridge, Chennai including Risk Analysis.

22. Environmental Feasibility Preparation of Environmental Completed

Report on Bithnok Lignite Feasibility Report

Mines, Bikaner, Rajasthan

23. EIA/EMP Study of Tasra Preparation of Air Quality Modeling Completed

Coal Mine Project, Jharia, Chapter

Dhanbad, Jharkhand

24. EIA/EMP Study of Korea Preparation of Air Quality Modeling Completed

OCP, Chhattisgarh Chapter

25. EIA/EMP Study of Begunia Preparation of Air Quality Modeling Completed

U/G Coal Mine Project, Chapter

Raniganj, West Bengal

26. EIA/EMP Study of Diguadih Preparation of Air Quality Modeling Completed

U/G Coal Mine Area, Jharia, Chapter

Dhanbad, Jharkhand

27. EIA/EMP Study of Tasra Preparation of Air Quality Modeling Completed

Coal Washery, Jharia, Chapter

Dhanbad, Jharkhand

28. 1320 MW Coal Fired Data Generation, Preparation of Clearance Awarded

Rajpura Power Project, Environmental Impact Assessment

Rajpura, Patiala, Report, Environment & Disaster

Punjab Management Report including Risk

Analysis, Preparation of R & R Plan.

Soil and Geotechnical Investigation

Reports.

29. 1800 MW Coal Fired Data Generation, Preparation of Clearance Awarded

Talwandi Sabo Environmental Impact Assessment

Power Project, Report, Environment & Disaster

Talwandi Sabo, Management Report including Risk

Mansa, Punjab Analysis, Preparation of R & R Plan,

30. 4000 MW Coal Fired Data Generation, Preparation of Clearance Awarded

Tilaiya Ultra Mega Environmental Impact Assessment

Power Project, Report, Environment & Disaster

Hazaribagh, Management Report including Risk

Jharkhand. Analysis, Preparation of R & R Plan,

Health and Safety Plan Preparation,

and Forest Clearance

31. 4000 MW Coal Fired Data Generation, Preparation of Clearance Awarded

Sasan Ultra Mega Environmental Impact Assessment

Power Project, Report, Environment & Disaster

Sidhi, M.P. Management Report including Risk

Analysis, Preparation of R & R Plan,

Health and Safety Plan and Forest

Clearance

32. Coal Based Integrated Collection of Data, Impact Preparation Completed

Gasification Combined Assessment Report, Review of Feasibility

Cycle Power Plant, Dadri, of IGCC Plant in India

Gautambudh Nagar, U.P.

33. 350 MW Gas Based Environmental Data Generation, Report Submitted Combined Cycle Power Preparation of Environmental Impact

Project at Dhuvaran, Assessment Report, Environment &

Anand, Gujarat. Risk Analysis & Disaster Management Report

34. 1000 MW CCPP Environmental Data Generation Report Submitted

of The Tata Power Preparation of Environmental

Ltd, Dhaulpur, Raj. Impact Assessment Report,

Environment & Disaster

Management Report

35. 1X210 MW ATPS Environmental Data Generation Clearance Awarded

of MPSEB, M. P. Preparation of Environmental

Impact Assessment Report, Environment

& Disaster Management Report

36. 1X210 MW Raichur Environmental Data Generation Clearance Awarded

TPS of KPCL Preparation of Environmental

Karnataka Impact Assessment Report,

Environment & Disaster, Management Report

37. 2x500 MW Left Data Generation, Preparation of Report Submitted

Bank TPP, Environmental Impact Assessment

Maithon, Report, Environment & Disaster

West Bengal Management Report including Risk

Analysis, Preparation of R & R Plan

38. 2x500 MW TPP Data Generation, Preparation of Clearance Awarded

Kodarma, Environmental Impact Assessment

Jharkhand Report, Environment & Disaster

Management Report including Risk

Analysis, Preparation of R & R Plan

39. Kota Thermal Power Study to the performance Problems Completed

Rajasthan of ESPs and Effluent Treatment Plant

and to suggest solutions, Preparation

of Greenbelt Development Plan, Study

to Noise Pollution Problems and to

Suggest Solutions

40. 200 MW Gas Based Environmental Data Generation Clearance Awarded

CCPP of GSEG at Preparation of Environmental

Hazira, Gujarat Impact Assessment Report,

Environment & Disaster

Management Report

41. MW Gas Based Environmental Data Generation, Clearance Awarded

Kuttalam CCPP of Impact Assessment, Preparation

TNEB,Tamil Nadu of Environmental & Disaster

Management Plan. Presentation

to Public Hearing Committee.

42. 1x250 MW Kandla Environmental Assessment of Site, Report Submitted

Coal Fired TPP Review of Plot Plan, Baseline Data

Gujarat Generation, Impact Assessment,

Environmental & Disaster Management Plan

43. 1x75 MW Lignite Environmental Studies of Existing Clearance Awarded

Fired TPP at Bhuj Units, Environmental Data Generation,

Gujarat Preparation of Environmental Impact

Assessment Report, Environmental

Management Plan

44. 42 MW DG Preparation of Environmental Study Clearance Awarded

Power Project and Risk Analysis Report, Environmental

Gold Crest, A.P. Compliance and Clearance

45. 1x500MW Coal Environmental Data Review, Generation Clearance Awarded

Fired Sanjay of Balance Data and Assessment for

Gandhi TPP Expansion Unit, Watershed Management,

M.P. Presentation to Public Hearing Committee.

46. 2x250 MW Coal Environmental Data Generation, Site Clearance Awarded

Fired Sikka TPP Evaluation, Impact Prediction and

Gujarat Assessment for Expansion Units

47. 100 MW Gas Environmental Studies of Existing, Clearance Awarded

Based Dhruvaran Capacity, Impact Evaluation of

CCPP of GEB Expansion Units Management Plan

Gujarat

48. 156.1 MW Gas Environmental Planning of Site, Clearance awarded

Based Hazira Baseline Data Generation and Impact

CCPP of GSPC Assessment.

Gujarat

49. 2x210 MW Environmental Studies of Existing, Clearance Awarded

Coal Fired Capacity, Impact Evaluation of

Parichha TPP Expansion Units Management Plan

of UPSEB, U.P.

50. 24MW Bagasse Environmental Study Report Preparation Clearance Awarded

Based Cogeneration Including Baseline Data Generation and

Plant at Sameerwadi, Impact Assessment

Karnatka

51. 2x260 MW Coal Environmental Planning of Site Baseline Clearance Awarded

Based TPP of BBI Data Generation and Impact Assessment

at Nellore, A.P.

52. Coal Jetty KTPP Environmental Planning of Site, Baseline Clearance Awarded

of BBI at Krishnap- Data Generation Impact Assessment,

atanum, A.P. Environmental & Disaster Management

Plan

53. Tanvir Bavi power Preparation of Comprehensive Environme- Clearance Awarded

Projects (160 MW ntal impact assessment report

Barge mounted) at

Mangalore, Karnatka

54. Paper Mill of Environmental Study Report Preparation Clearance Awarded

Rollatainers Ltd. and Impact Assessment

Kundali,Haryana

55. Passenger Port at Review of Environmental Data and Clearance Awarded

Nana Laija, Mandvi, Preparation of Environmental Impact

Gujarat Assessment Report

56. Auto9 Wheel of Hero Environmental Data Collection Clearance Awarded

Cycle at Ludhiana, and Preparation of Environmental

Punjab Impact Assessment Report

Membership

Life member

•Indian Aerosol Science and technology association (IASTA), EAD, BARC, Mumbai - 400 085.

•Indian Association for Air Pollution Control, Department of Botany, M. S. University of Baroda, Vadodara - 390 002

Extra-Curricular Activities

•Convener : Chess Club, J.N.U., N. Delhi (1996-1997).

•Active Member : Wildlife club, J.N.U., N. Delhi (1989-1997).

•Represented University Chess Teams in Inter University Chess Tournament

in 1984,1986 and 1987 at Hyderabad, Jabalpur and Calcutta, respectively.

•Adjudged winner in J.N.U. Open Chess Tournament in the years 1989, 1996 and 1997.

I, hereby, declare that the information is true and correct to the best of my knowledge.

Date: 15/04/2019 (Bhavesh K. Singh)



Contact this candidate