Post Job Free
Sign in

I&E Project Manager, Designer and Field Service Tech - Commissioning

Location:
Maggie Valley, NC, 28751
Salary:
Open
Posted:
April 14, 2019

Contact this candidate

Resume:

John M. Sullivan

*** ****** ***** ****

Maggie Valley, NC 28751

Email: ac83cz@r.postjobfree.com Cell/Home: 828-***-****

QUALIFICATION SUMMARY

I am looking to join a company where I can utilize over twenty plus years of experience working within the Instrumentation / Electrical Industry, sixteen of which were spent in the capacities of System Design, Supervision and System Commissioning in various Industries.

I also have working knowledge of Spanish which I used on a 2-phase project in South America, while supervising local contractors and performing the Control System Commissioning / Start-up for a natural gas pipeline across Argentina and Chile.

COMPUTER SKILLS / EXPERIENCE

MS Word, Excel, Access, Power Point, Project 2012, AutoCAD 2010/12, Typing, Troubleshooting PLC Software: Concept, RS Logix 5000; 500; 5, GE Fanuc, Telepace, Modsoft;

Modification to HMI Software: Intellution (IFix), Wonderware and Factory Talk View; Communication Protocols: HART, Modbus, DH, and DeviceNet.

AREAS OF STRENGTH

Effective time management, organizational and problem-solving skills, accustomed to maximizing available resources, managing multiple projects and meeting deadlines. Self-motivated and dedicated individual who can work independently as well as promoting team efforts; with excellent communication skills to interact with a diverse group of clients, vendors, engineers, consultants and contractors.

EMPLOYMENT HISTORY

McDermott Jan 2019-Present

757 N. Eldridge Pkwy. Houston, TX 77079

Journeyman Electrician

Industrial Electrical Construction – Duke Energy Combined Cycle Project Asheville, NC.

Relocating Parents to new home and caring for them. Nov 2016-Sept 2017

Construct Corps

5820 W. Cypress St. Tampa, FL 33607

Journeyman Electrician May 2016-Nov 2016

Commercial Electrical Construction

Caring for Elderly parents and Aunt Sept 2014-Jan 2016

S&S Controls LLC – Contracted to: Omega Consultants

24160 S.R. 54, Unit 2 Lutz, FL 33559

Instrumentation and Electrical Consultant / Designer July 2014-Aug 2014

Mosaic Phosphate

Cooling Water Pump Station Project – Design of power, grounding, and underground conduit runs, motor controls and Control Panel. Software- AutoCad 2012.

DcR Engineering Services, Inc.

3110 Cherry Palm Dr. Ste. 290

Tampa, FL. 33619

Project Manager Jan 2013–June 2014

Systems Integrator – SCADA Wireless Division

Managing projects for various Contractors and/or Municipalities such as City of Tampa, Pinellas Co., Polk Co., City of Boynton Beach, West Palm Beach and Martin Co. including estimating new projects, writing new or updating existing proposals as per Contract Specs / Drawings; Overseeing project design, scheduling, material procurement, change orders, execution, budgeting, Storm Water, Water and Wastewater Treatment systems.

S&S Controls, LLC - Contracted to: Omega Consultants

24160 S.R. 54, Unit 2 Lutz, FL 33559

Instrumentation and Electrical Consultant / Designer Aug 2011–Nov 2012

Mosaic Phosphate

Researching and updating the Single Line Power Diagrams for an Electrical Arc Flash

Study and Instrumentation P&ID’s in various facilities for their Turbine Generators,

Sulfuric Acid, Phosphoric Acid, Ammonia and D.A.P. processes utilizing their DCS, PLC HMI’s, electrical schematics, loop drawings and walking down of the equipment and processes, then updating drawings via AutoCad 10, 12.

Baker Energy / Wood Group Oct 2006- June 2011

4201 Ambassador Caffery Parkway, Lafayette, LA. 70503

Instrument / Electrical Technician

Various Oil / Production Offshore Platforms – Gulf of Mexico / Israel

Normal Facility Production / SCADA & Platform Maintenance / MMS Compliance Testing / Fire and Gas Safety System Coast Guard Compliance Testing, Fire Team.

PLCs: RS Logix 5000 & 500.

Power Generation: Diesel and/or Turbine 480VAC, 4160VAC; Turbine Compressors, Fireman, Lifeboatman, Able Seaman.

Chevron - Blind Faith MC-650 - Aug 2007 to Apr 2009

Project Commissioning of Topside Production I & E Systems, SCADA, Power, Fire/Gas Systems, MMS and Coast Guard Compliance.

Hull integration at Kiewit Offshore Services facility in Ingleside, Texas and continuing offshore at Mississippi Canyon 650 to COI, 1st Oil Production. Normal facility Production / Maintenance. RS Logix 5000 PLC’s, 4160 / 480VAC Solar Turbine Power system.

CMC / Fluid-IQs

2650 Napa Valley Corporate Dr. Napa, CA. 94558 Feb 2003 – Aug 2005

Field Service Engineer

Systems Integrator

Responsible for Factory Acceptance Testing of Control Panels, Motor Control Centers, VFD setup, Radio Telemetry and I & C equipment

Verification of instrument installation, configuration and calibration.

Verify back-up power generation, safety systems and onsite Loop checks.

“ORT” and “As Built” documentation; Commissioning of the control systems with the appropriate contractors, Engineers and the owner’s personnel; Servicing of periodic maintenance / calibration contracts.

Cherne Construction Contractors, Inc. Nov 2001 – Feb 2003

9855 W 78th St # 400, Eden Prairie, MN 55344

Electrical Field Engineer

General Contractor, Ultramar / Tesoro Refinery, Martinez CA.

Responsible for cable tray runs, coordinate wire pulls, material takeoffs and procurement, scheduling, RFI’s

Quality control field tests and documentation

Commissioning of electrical equipment

Design change coordination, documentation and implementation

Interfacing with owner’s personnel, consulting Engineers, Electrical and other Craft Supervisory personnel.

Cherne Construction Contractors, Inc. Aug 2001 – Oct 2001

Journeyman Wireman

General Contractor, Martinez CA.

California Electric Company Jul 2001 – Aug 2001

Journeyman Wireman- Welder / Night Shift Foreman

Electrical Contractor, Point Richmond CA.

Kiewit Industrial Corporation Apr 2001 – June 2001

Journeyman Wireman

General Contractor, Pittsburg Power Plant - Pittsburg CA.

Curry Controls Co. Apr 1994 – Feb 2001

4245 S. Pipkin Rd. Lakeland, FL. 33811

Project Manager / Designer / Field Service Technician

Systems Integrator

Responsible for Control Panel design, CAD drawings, material procurement, fabrication and meeting Project Specification requirements.

Prepare Submittals and O&M’s.

Responsible for Factory Acceptance Testing of Control Panels, Motor Control Centers, VFD, Radio Telemetry and I&E equipment.

Field installation, Commissioning and Startup of electrical and programmed control systems Loop checks, instrument and VFD setup. Validate calibration, back-up power generation and safety systems.

Coordination of start-up activities with the appropriate contractor(s) and the owner’s personnel.

EDUCATION / TRAINING / CERTIFICATIONS

TWIC Card

2015

Florida Phosphate Producer’s Contractor Safety & Security Program

2012

MSHA Certificate of Safety Training

2012

DOT, I&E Tech Certification

Able Seaman / Proficiency in Survival Craft (Lifeboatman) w/ MMC

2011

-Quality Maritime Training, St. Pete, Fl.

2010

U.S. Passport

2010

Crane and Rigging Certification – Falck Alford, Houma, La.

2010

Sub-Part/O Prod. Safety Systems Level 4 – Baker Energy/Wood Group

2009

SEMP Check Administrator

2009

Hazwoper – Baker Energy Lafayette, LA.

2009

Fit Test – Occupational Safety Training, New Iberia, La.

2009

Fire Watch / Incipient Fire Fighting - OST, New Iberia, La.

2008

First Aid Certification – Occupational Safety Training, New Iberia, La.

2008

Advanced Firefighter Training – L.E. Fletcher T.C.C., Houma, La.

2007

Safe Gulf Certification 2007

Water Survival / HUET – Occupational Safety Training, New Iberia, La. 2006

Allen–Bradley VFD Training, Sacramento CA 2005

Spanish Language Tutoring:

•San Salvador de Ju Juy, Argentina; Santiago, Chile 1998-1999

•Tampa Language Institute, Tampa FL 1997-1998

Modicon Level II PLC Programmer Training Program, Lakeland FL

1998

Intellution MMI Programmer Training Program, Lakeland FL

1998

Instrumentation Technician Level I Program, Tampa FL

1996

Journeyman Electrician - NJATC, Tampa FL

1995

Electrical Journeyman License – Polk County

1994

Plant City High School, Plant City FL

1978



Contact this candidate