Highest degree
Bachelor’s degree in Mechanical engineering
Last Employer
Siemens Healthineers thru HCL Technologies thru recruiter (from Oct 2017 to July 2018
Last to Last Employer
Larsen & Toubro Limited, Mumbai
From August 2003 to Nov 2012
Last Job Profile
Project Engineer for NX-11 CAD modeling, drawing and initiate for SAP release
Work Experience
5 years of experience as a Project Engineer in Product Development of electromechanical system
Technical Skills
Basic computer skills: MS office, MS excel, MS powerpoint, MS Project
4-5 years exp. In NX Modelling (NX11 version) and Drafting & Basic Autodesk Inventor 3D modelling, Autocad Drafting
Basic Mechanical drawing principles and GD&T
Exp in Teamcenter implemented as ERP tool. (for maintaining workflow eg preparation, release & approval of models and drawings)
ERP tool: At L&T used Baan as ERP tool (project managers role to create part ID with proper specification to enable purchase request creation, store release of items for assembly and closing the project after final assembly)
SAP: At Siemens used SAP tool to search for part IDs and specification for creating purchase requests, studying the old orders/specification for details of parts and assemblies for reference.
Project planning and monitoring on CCPM
Summary of work at Siemens Flanders, New Jersey, USA
I worked at Siemens METS(Mecahnical engineering Testing Solutions) group from Nov 27th 2017 to Jul 30th 2018. At Siemens my role was to use NX11 and Teamcenter to prepare 3-D models and ASME Y14.5 2009 standard based drawing using NX11 and Teamcenter.
The manufactured components, in-sep assemblies and Assemblies were released to status 60 after completing the Teamcenter release process. This includes steps like initiating the release task by creating the EC folder and populating it with all models and drawings ready for release. Thereafter steps like vendor approval and approval by project engineer are completed. If approved the item (part, assembly, drawing) comes to Status 60.
Coordinated with FDM (Fusion Deposition molding) team to produce prototype parts using NX and FDM facility at Siemens Flanders for improving the assembly. The prototype was checked against the EP build of decapper module that was available within the site. The exercise helped to improve the design.
Prepared checklists to facilitate procurement initiation and also maintained supplier communication for resolving any issues.
Summary of work at L&T Mumbai India
Role : Project engineer.
Job objectives were achieved partly by being in charge of the kickoff meeting (identify the resources and scope) and uploading the project plan on CCPM (identifying critical chain and project monitoring using buffer management)
The CCPM monitoring always pointed out the task at hand. The PM keeps a close watch on the tasks and pitches in where needed to achieve the deadlines. The approach is more inclusive than exclusive.
Used NX and AutoCAD for design, engineering,BaaN for purchase, stores to drive the assembly, testing and trials phase. For parts and assemblies purchase requests were generated from the BaaN ERP system. Also BaaN activities for releasing the parts after store receipt for assembly until the final assembly is released to the customer.
Basic solid model was developed to include fabricated and machined structures (stationary base frame, rotating frame, positioning platform, detailed subassembly placement,OEM parts ex. Outriggers, actuators, gearboxes, standard parts like bearings, seals, ball screws, slewing bearing, dampers, interface for electronic devices, resolvers, sensors and its mountings. Thus the final BOM was prepared.
The models thus evolved represent to a reasonable extent what the final product will be like.
The BaaN ERP was used for Procurement planning and assembly release.
As soon as the Drawing and BOM was released by the engineering and PMG group, the project engineer creates item ID in BaaN and generated its purchase request. Due to customized nature of parts and subassemblies the project engineer was involved by purchase and store office.
Followup with vendors and involvement thru in-process inspection of manufactured parts and quality conformance from vendors of standard parts and OEM parts was a part of project engineers task.
Once the items are delivered in store,If found OK a GRN (goods receipt note) is issued and item entered in BaaN system for Project engineer to view its availability in store along with its specific location in the store. When required the items are withdrawn from the store using BaaN ERP.
The Project managers get items released from store to the assembly workshop on BaaN ERP. The assembly was completed according to the approved assembly procedures and then Customer or internal inspection was carried out.
Education
Degree
Board
Year
Institute
%age marks
B.Tech,
Mechanical
NIT, Allahabad (MNREC)
2003
NIT, Allahabad (MNREC)
82%
GPA 4*
Std Xth
ICSE
1996
St. Mary’s Convent Inter College
92.2%
Std XII
ISC
1998
St. Mary’s Convent Inter College
87%
Course by course evaluation of Bachelors degree and Highschool degree evaluation carried out by A2Z Evaluation*
*A2Z Evaluations, LLC is an independent evaluation service, which provides evaluations of international educational credentials to determine the U.S. equivalency for purposes such as high school placement, undergraduate admission, graduate admission, employment, immigration, and professional licensure in the United States.