PROJECT MANAGER AND ESTIMATING ENGINEER

+17 years of experience in Project Management having executed international and domestic capital projects in multi-discipline environments from conceptual engineering through detailed design, construction and start-up. Working in both clients and contractor roles on projects that included high rise building, oil and gas companies, steel companies, cement factories, towers Airports and power supply. successfully managed projects in a cost control, earning value, expanses as well as lump sum expanses and scheduling. Possessing excellent leadership, communication, relationship skills and a proven ability to effectively manage budgets and schedules using primavera P6 and Excel import and export data. Building estimate for contract sales and house design team utilizing quotes communicating with subcontractors, vendors and manufacturers during the estimating process CORE COMPETENCIES:

PROJECT MANAGEMENT

CUSTOMER MANAGEMENT

SCHEDULING PRIMAVERA P6

ESTIMATING & COST CONTROL

SITE & CONSTRUCTION

MANAGEMENT

TEAM MANAGEMENT

AACE MEMBER FOR PSP

QC &QA

Primavera P6 & MS project Skills

Developing detailed schedules by WBS, cost loading- labor, materials and equipment to each activity to determine progress requirements to meet the project baseline consider CPM and earning value technique. WBS codes, activities codes WBS summary, Milestones, level of effort and resources leveling. What if, Subcontractor updates using Reflections, Claim Digger. Daily Progress update/ monitor, look ahead reports, crashing and fast tracking technique Cash flow, expanses reports and spreadsheet by primavera and Excel sheets Excel Skills

SUM, SUMIF, VLOOKUP, IF & Pivot Table.

Very detailed reports and schedules performing strong formula Auto Cad Skills

2D & 3D detailing, shop drawing and site drawing for all drawing sizes A4, A3, A2 & A1(blue print) Educational

Bachelor's degree in Civil Engineering

Must University certificate from USA/ Australia 2012 RAMY JAIN PAGE 2

ac823s@r.postjobfree.com 561-***-****

PROFESSIONAL EXPERIENCE

Palm beach school district ( palm beach county Florida, USA) Nov 2015 – till date Substitute teacher covering schools in Palm Beach County Shell Gas Station (Jupiter Florida, USA) Mar 2015 – Oct 2015 Store manager responsible for inventory in & out and casher register AL REYAMI STEEL INDUSTRIES (ABU DHABI, UAE) Dec 2012 – Dec 2014 ASSENT (AL SHAFAR STEEL INDUSTRIES) (ABU DHABI, UAE) Mar 2012 – Dec 2012 Project Manager & cost control

Focusing on the project management, to deal with all internal and external business partners, acting as a subject matter expert and decision making for planning for resources, documentations, contract management, also working closely with the client, understanding what their requests are and developing a suitable solution Key Contributions:

Manage weekly and monthly progress meeting.

Assisting with project costing and budgeting which includes proper tendering, Estimating and appointing of Contractors and Project Management firms as deemed necessary

Clarifying all invoicing with proper documentation for finance department and auditors

Managing the in house production facilities and shop fit out

Planning for material resources to maintain sufficient stock used as input for manufacturing

Establishing and maintaining internal departmental coordination including all external business associates such as suppliers, contractors and projects consultants having constant communication with clients.

Preparing programs schedule for each project

Primavera P6 schedule, Provide 3 weeks ahead and monthly reports.

Produce method of statement and risk assessment

ITP consultant and coordinate with quality assurance measurement Projects in this job includes the following

SR. YEARS PROJECTS CLIENTS SCOPE OF WORK

1

2013-2014

Abu Dhabi AIRPORT_Midfield Terminal

Building-General Contractor Roof package

Wrapper & Façade Mullion

CHINA STAT

Steel fabrication and delivery to site 25000 M

2 2012-2013 Saudi Qurayyah IPP / Plant Business Unit SAMSUNG C&T Steel fabrication and delivery to site 6500 MT 3 2012-2013 Rumalia Site At Iraq Worley Person Steel fabrication and delivery EX Work 500 MT 4 2012 Emal Phase II Site at altwaila Outotec Steel fabrication and Erection 4000 MT 5 2012 Afcon Site at Laibria Afcon Steel fabrication and delivery to site 2500 MT 6 2012 Borgoue 3 Site at El Rawise Hyuandai Steel fabrication and delivery to site 7500 MT RAMY JAIN PAGE 3

ac823s@r.postjobfree.com 561-***-****

WILLIAM HARE (WHL), UAE Nov 2005 – Mar 2012

Senior Project Engineer

Key Contributions:

Producing and issuing drawing No. 1 with all relevant contract information

Drawings receipt of clients, designing information, scheduling and advising project manager to reduce delays

Issuing drawings to clients, drawing ranges, informing to engineers to confirm any breakdown of structure and relevant contract numbers

Getting material prelims from engineers and issuing production and planning

Receiving approvals and calculation from engineers and issuing to clients

Receiving client’s approvals comments and issuing to engineers

Contacting and discussing with clients if approvals are not received within agreed contract period

Attending and arranging engineers meetings, teleconference calls with engineering and client as necessary

Receiving detail drawings from engineers and issuing for fabrication

Contacting engineers to ensure whether issuing dates are achieved or not and advising project manager if any delays are occurring

Issuing bolts requisition to purchasing department

Producing bought out material lists and issuing to purchasing

Liaising with engineers, grating, cladding supplier’s regarding drawing reviews, approvals to ensure no delays to procurement cycle

Controlling changes and reassuring from clients

Advising Project manager if any engineering schedule changes or get delayed

Co-coordinating the issue of site packages to clients

Contacting with client for TQ, revision notice, client drawings, standard drawings, site queries, and shop queries

Projects in this job includes the following

SR. YEARS PROJECTS CLIENTS

1 2012 Flour - Jetty Boil Of Gas Recovery Project FLUOR 2 2012 Shah Gas Development Package 4 SAMSUNG

3 2011 – 2011 Shah Gas Development Package 3 SAMSUNG 4 2010 – 2011 ADIC Towers Project Al Futtaim Carillion L.L.C 5 2010 – 2011 Sohar Bulk Jett Project SAIPEM France 6 2008 – 2009 Neste Oil Singapore Pte.Ltd Project Technip Italy 7 2007 Shell Global Solutions International Pearl GTL JGC 8 2006 Qatar Liquefied Gas Company Limited Qcs Line 2&3

CTJV

9 2005 Qatar Liquefied Gas Company Limited Qcs Line 1 CTJV RAMY JAIN PAGE 4

ac823s@r.postjobfree.com 561-***-****

Design Office Section Leader Sep 2006 – May 2007

Key Contributions:

Planning all engineering activities and resources

Arranging programs and scheduling for each project

Checking for strucad details

Acting as team leader for strucad group

Site Engineer

Working on QGXII (Qatar gas line 2), for the project: Ras Lafan Jan 2006 – Sep 2006 Key Contributions:

Site representative at Ras Lafan for solving site problems in erecting and guiding site engineers

Clarifying erectors queries and identifying required details for field modification Team Leader Nov 2005 – Jan 2006

Key Contributions:

Checking for Strucad detailer

Working as a team leader for strucad to guide for daily activities NSF (NATIONAL STEEL FABRICATION COMPANY) June 1997 – Nov 2005 CNC Programmer & Work Shop Engineer

Key Contributions:

Conducting CNC Programming, including CNC flame cutting M/C, Germany

Making Nesting for each item in plates to save plates and making shop weld according to plate size and client specifications

Supervising for Auto-CAD drawings, shop details and bill of materials

Developing Auto-cad 2d and 3d

Knowledgeable about Pipelines Pressure, Vessel Tanks, Towers and Plate works

Drawings 3d, Auto-Cad Isometric, Strocad modeling for steel structure

Preparing Engineering department and director for effective working on site

Organizing and preparing orders for machines

Optimizing the work group materials

Following up machine operators

RAMY JAIN PAGE 5

ac823s@r.postjobfree.com 561-***-****

Projects in this job includes the following

SR. YEARS PROJECTS CLIENTS

1 2005 Limstone Orascom

2 2005 Nem Steel Orascom

3 2004 William Here Steel C.C.C Consolidated Construction 4 2004 Tunis Steel C.C.C Consolidated Construction 5 2004 Alstom USA Steel-Power Planet Alstom Usa

6 2004 CTG Bridge Crane Support Structure Steel Techint Cimimontubi 7 2003 Nigeria Cement Co Orascom

8 2003 Libya Cement Co Orascom

9 2003 OGD Orascom

10 2002 Golden Pyramids Orascom

11 2002 Piles Orascom

12 2001 Egyptian Cement Factory Iv Orascom

13 2001 Rolle (Pressure Vassel) Rolle Co

14 2001 Amreya Cement Line V Orascom

15 2001 Edf Suez Gulf –Gas Fue, Fired Power Plants Orascom 16 2001 Algry Cement Co. Orascom

17 2000 Kvaerner(Mubarak T.V Studio) Orascom

18 1999 – 2000 Fan Tower(Nordex) C.C.C Consolidated Construction 19 1997 – 2000 Egyptian Cement Factory Linei&Ii&Iii Steel Equpment & Prihiter Tower Orascom

20 1999 Ennpy-Pipe Line C.C.C Consolidated Construction 21 1998 Pressure Vessel Egyptian Electricity Authority (Nuova Cimimontubi)

22 1998 El Ferdan Bridge Ministry Of Transport Egyptian National Railways (Orascom)

23 1998 Aden Refinery Tanks C.C.C Consolidated Construction 24 1998 Suez Ducts Orascom

25 1998 Shinco Pantic Orascom

26 1998 Suez Fertilizer Orascom

27 1997 Suez Cement Factory Steel Equipment & Pri- hiter Tower Orascom



Contact this candidate