Mr. Fuenmayor is a dedicated and enthusiastic electrical engineer with a broad range of skills and abilities combined with a commitment to achieving high standards at all times. He possesses excellent interpersonal skills and the ability to communicate concisely at all levels. He is quick to grasp new ideas and concepts and to develop innovative solutions to electrical, instrumentation and telecommunications problems. He is a responsible and accountable team player who enjoys being part of, as well as leading, a successful and productive Electrical, Instrumentations and Telecom teams in new and sometimes challenging working environments.
PERSONAL INFORMATION
Name: Gustavo José Fuenmayor Angarita
ID: 9.700.701
Nationality: Venezuelan
Phone: +1+571-***-****
Address: 6560 South Goldenrod Rd, Unit A. Orlando, FL 32822
Email: ****************@*****.***
Work Authorization: Yes
EDUCATION
1991 P.Eng., Electrical Engineering, Universidad Rafael Urdaneta, Maracaibo, Venezuela
EXPERIENCE
2016-2017 SNC-LAVALIN INC., Vancouver, British Columbia, Canada
Electrical Construction Field Engineer
Preparation of Engineering Work Packages (around 160), including list of materials, details, sketches to be following by Construction Department.
Construction and Installation of equipment such as Transformers, MCC’s, switchgears, UPS, boards, fire detection system, transmitters, controllers, emergency generators, etc. Planning, scheduling, controlling and monitoring the advance of work, road crossings, duct banks and trenches, cable trays, cable installation and terminations, control of Electrical materials. Clearance of Construction of Electrical Punch List. Contract Administrator of construction of 3 Iso-Phase Bus units. Construction of the new Control Room (E&I).
Project: Prince George Keys Energy Project, MD, USA (725 MW Combine cycle)
2015-2016 SNC-LAVALIN INC., Vancouver, British Columbia, Canada
Electrical Construction Field Engineer
Preparation of Engineering Work Packages (+200), including list of materials, details, sketches to be following for Construction Department.
Construction and Installation of equipment such as Transformers, MCC’s, switchgears, UPS, boards, fire detection system, transmitters, controllers, emergency generators, etc. Planning, scheduling, controlling and monitoring the advance of the contractors’ work in 170 systems, road crossings, duct banks and trenches, cable trays, cable installation and terminations, control of Electrical materials. Clearance of Construction of Electrical Punch List (Engineering). Contract Administrator of construction of 3 Iso-Phase Bus units. Construction of the new Control Room (E&I).
Project: St Charles CPV POWER PLANT, MD, USA (725 MW Combine cycle)
2014-2015 SNC-LAVALIN INC., Vancouver, British Columbia, Canada
Electrical Construction Field Engineer
Solve of miss information on specs, drawings, termination points, size and type of E&I cables, etc.
Issuing specification & managing of quality and quantities on E&I materials.
Design of SCADA and Communication system to inside plant and next Distribution Substation.
Design and implementation of necessary equipment based on government’s requirements to meet commercial operations.
Develop of SOW for potential suppliers on Substation, Main and Aux. transformers, SGs, MCCs test (pre-commissioning step).
Design of 300+ Local Control Boxes due to lack of original engineering design.
Issuing New Electrical Construction Site Instructions according site situations standard/client`s requirements.
Providing assistance during start-up.
Issuing and Clearance of Construction of Punch List on 180+ systems & subsystems.
Project: JAGUAR ENERGY GUATEMALA (2X150 MW Coal Fired Plant), Escuintla, Guatemala
2013 INPROMACA, Curaçao
Electrical & Instrumentation Superintendent
Construction, supervision of electrical, instruments and telecommunication works of twelve (12) Residential Buildings with 1.200 mts2 each, plus four buildings Hotel type of 14.400 mts2 total of 2.800 mts2 and commercial buildings total of 8.600 mts2. Included a swimming pools and a harbor. Planning, scheduling, controlling and monitoring the advance of the contractors work in E&I disciplines, fire detection, electrical and instrumentation road crossings, duct banks and trenches, cable trays, cable installation and E&I terminations, control of E&I materials, Paging, LAN, etc.
Project: Puerto Oasis Hotel & Residential Complex, Curaçao.
2012-2013 SNC-LAVALIN INC., Vancouver, British Columbia, Canada
Electrical Superintendent
Construction and Installation of equipment such as Transformers, MCC`s, switchgears, UPS, boards, fire detection system, transmitters, controllers, transformers, emergency generators, etc. New Construction Site Instructions according site situations standard/client`s requirements related the construction of Planning, scheduling, controlling and monitoring the advance of the contractors work in E&I disciplines in 141 systems, pre-commissioning (+3000 loops handover and checked), road crossings, duct banks and trenches, cable trays, cable installation and E&I terminations, control of E&I materials. Clearance of Construction of Punch List
Construction of the new Control Room (E&I discipline). Electrical facilities of 5 buildings around the plant
Project: Fenix Power Project, Salinas, Peru.
2011-2012 FLUOR DANIEL INTERNATIONAL INC, Conakry, Guinea
Electrical Superintendent
Construction and Installation of Sub Station`s equipment such as Transformers, MCC`s, switchgears, UPS, boards, fire & gas detection system, CCTV, transmitters, controllers, transformers, emergency generators, etc. New Construction Site Instructions according site situations standard/client`s requirements related the construction of 12 camps for about 4000 workers to support rail work jobs.
Planning, scheduling, controlling and monitoring the advance of the contractors work in E&I disciplines, calibration of instruments, electrical and instrumentation road crossings, duct banks and trenches, cable trays, cable installation and E&I terminations, control of E&I materials.
Project: Simandou Iron Ore Project, Conakry, Guinea, Kissidougou, Area 3 local camps.
2011 INPROMACA, Maracaibo, Zulia, Venezuela
Construction Manager
Electric and power distribution system design.
Planning, controlling and monitoring the advance of all disciplines work for the construction of housing complex (16 houses), including material and budget administration, sub-contractors supervision.
Project: “Piedra Bella II" Housing Complex, Maracaibo, Zulia State, Venezuela (February 2011 – September 2011)
2010 SNC-LAVALIN INC., Toronto, Ontario, Canada
Instrumentation Superintendent
Planning, controlling and monitoring the advance of the instrumentation work, calibration of instruments, cable trays installation, cable pulling and E&I terminations, MCC`s and SG`s (power and control), CCTV, fire alarm system, interconnection and integration of three (3) turbines with DCS system. Instrumentation pre-commissioning (+4000 loops handover and checked), including pre-start continuity & meggering checks, functional checks. New Construction Site Instructions according site situations and standard/client`s requirements
Construction of the new Control Room (E&I discipline)
Installation of the new Burner Management System (BMS) according NFPA, IEC standard and client s requirements.
Project: Ambatovy Project Power Plant (3x135 MW Coal fired), Tamatave, Madagascar (March 2010 – December 2010)
2009 – 2010 INPROMACA, Maracaibo, Zulia, Venezuela
Construction Manager
Electric and power system design. Planning, controlling and monitoring the advance of all disciplines work for the construction of housing complex (12 houses), including material and budget administration, sub-contractors supervision.
Project: “Piedra Bella" Housing Complex, Maracaibo, Zulia State, Venezuela (July 2009 – March 2010)
2008 – 2009 SNC-LAVALIN INC., Calgary, Alberta, Canada
Telecom & Instrumentation Superintendent
Planning, controlling and monitoring the advance of the T&I work, calibration of instruments, duct banks and trenches, cable trays installation, cable pulling and Electrical, Instrumentation and control terminations, control of T&I materials, paging system, telephone, CCTV, siren system, field instruments, 7 subsystems associated to process control, connection, interconnection and integration of all of them, T&I pre commissioning (+7000 loops handover and checked) including pre-start continuity & meggering checks, functional checks. Issuing New Instrumentation Construction Site Instructions according site situations standard/client`s requirements.
Electrical Superintendent (in charge) during absent. Controlling and monitoring of Construction and test Sub Station S-40 (+15 MCC’s, SG’s) test and running of Transformers and motors, batteries bank, UPS devices, UPS boards, emergency generators, etc. Issuing New Electrical Construction Site Instructions according site situations standard/client`s requirements. Providing assistance during start-up.
Construction of the new Control Room (E&I discipline)
Electrical facilities of 14 buildings around the plant
Project: Saudi Arabian Oil Company (Saudi Aramco), Shaybah Central Processing Facilities, Shaybah CPF Complex, Eastern Province, Saudi Arabia (January 2008 – June 2009).
1999 – 2007 Various Employers
Project E&I Engineering Leader/Project Coordinator
Providing detailed in Electrical engineering development for construction of control rooms in electrical and instrumentation disciplines.
Coordinating of Electrical & Instrumentation with the other engineering disciplines.
Planning, scheduling, monitoring and control of E&I work advance.
Project: APV Alliance, Petróleos de Venezuela S.A. (PDVSA), Steam plants T6 and W6 control room construction, Ojeda City, Zulia State, Venezuela (February 2007 – December 2007).
Electrical & Instrumentation Superintendent
Construction and Installation of Sub Station`s equipment such as Transformers, MCC`s, switchgears, UPS, VFD`s, boards, fire & gas detection system, valves, transmitters, controllers, transformers, emergency generators, etc. New Construction Site Instructions according site situations standard/client`s requirements.
Planning, scheduling, controlling and monitoring the advance of the contractors work in E&I disciplines, calibration of instruments, electrical and instrumentation road crossings, duct banks and trenches, cable trays, cable installation and E&I terminations, control of E&I materials.
E&I pre-commissioning and commissioning, including pre-start, meggering and continuity checks, functional loop checks
Providing assistance during the start up of the plant.
Hipot, load and unload test and running of 5 Transformers. Running more than 60 motors in 480 VAC, 220 VAC, batteries bank, UPS devices, UPS boards, cathodic protection, etc. New Construction Site Instructions according site situations standard/client`s requirements.
Building of the new Control Room (E&I discipline)
In charged of Lockout & Tag out procedures before and during energizing and running of electrical equipment.
Project: Agents International, Petróleos de Venezuela S.A. (PDVSA), SAEM III Plant, Maturín, Monagas State, Venezuela (October 2003 – February 2006).
Electrical construction at 17 Clusters (3 MVA, of 34,5 Kv / 480 VAC each cluster) and instrumentation for over 200 wells and associated areas, including the 34 PLC`s logic for the start-up and stop control of equipment and transmission to the control room of the main station through fiber optic.
Planning, controlling and monitoring the advance of the E&I work, calibration of instruments, electrical and instrumentation road crossings, duct banks and trenches, cable trays, cable installation and terminations, control of E&I materials.
E&I pre-commissioning and commissioning (+2400 loops handover and checked), including pre-start meggering and continuity checks, functional loop checks.
Installation and test of 17 transformers (3 MVA each)
Providing assistance during the start up of the 17 Clusters.
Installation, termination and test of 51 power houses/switch gears/VFD`s houses.
Hipot, load and unload test and running of 17 Transformers. Running more than 200 motors in 480 VAC, 220 VAC, batteries bank, UPS devices, UPS boards, cathodic protection, etc. New Construction Site Instructions according site situations standard/client`s requirements.
Project: Consortium Petro Orinoco (C.P.O., a JV with SNC-Lavalin Inc.), Sincrudos de Oriente (Sincor), Upstream Surface Facilities Main Station and Cluster, San Diego de Cabrutica, Anzoátegui, Venezuela (September 2001 – September 2003).
Electrical Engineer / Inspector: Project E&I Automation & Integration
E&I planning and scheduling with the contractor. Monitoring and guiding the contractor’s workforce.
Installing valve actuators for the discharge operations of crude oil, fuel to the tankers, switches and level transmitters in tanks, pressure switches and transmitters, installing RTDs and elaboration of loops diagrams.
Integration and Automation of the system.
Installing and programming 6 PLCs and the SCADA system in the control room. Building of the new Control Room.
Performing meggering and continuity checks and functional loop tests.
Adecuation of the new power distribution system.
Building of the new Control Room (E&I disciplines).
Project: Tecnoconsult C.A., Petróleos de Venezuela C.A., Upgrade to La Salina Tank Farm Terminal and crude Oil export port, Cabimas, Zulia State, Venezuela (January 2001 – August 2001).
E&I Supervisor
Supervising the installation of the fiber optics systems for the CCTV system, access control, system of control of acquisition of data (SCADA) and the local net of calculation (LAN), besides the telephony systems, wired and connections of the data highway of the 3 PLCs (Train 1 and 2 process areas, ESD, and Fire & Gas) and controllers of discreet signs (GENIUS).
Handling the start-up the of UPS systems, electric facilities in control room and the fire and gas detection system in the control room building.
Installing and test 33 flood valves.
Pre-commissioning and commissioning of the fiber optic and telephony systems.
Building of the new Control Room (E&I disciplines)
Project: Consortium Petro Orinoco (C.P.O., a JV with SNC-Lavalin Inc.), Sincrudos de Oriente C.A (Sincor), Upstreams Surface Facilities Main Station, San Diego de Cabrutica, Anzoátegui, Venezuela (February 2000 – December 2000).
1994 – 1999 FUENMAYOR & MOLINA C.A
General Coordinator
Maraven S.A., various projects such as the construction of telecom racks, phone facilities, repair of telecom huts, supply of personnel to Maraven telecommunications department. Lagunillas, Zulia State, Venezuela.
General Coordinator for the maintenance of production generators in Guafita, Apure State, Venezuela, belonging to PDVSA (April 1998 - December 1998).
Project E&I Engineer
Designing of illumination circuits, power systems, telephony systems, fire and gas detection systems; design of power distribution systems, metric computations and specifications of construction to the amplification of the planning, scheduling, monitoring and control of the advance of the works.
Updating instrumentation and power drawings of the plants.
In charged of Lockout & Tag out procedures before and during energizing and running of electrical equipment.
Project: The Frontier Camp (OXI INC.), Alturitas 2, Alpuf, SJ 1 and Matapalo, San José del Zulia, Zulia State, Venezuela.
E.P.C. (Engineering, procurement and construction) for the project. Load and unload test and running of 6 Transformers. Running batteries bank, UPS devices, UPS boards, cathodic protection, etc. New Construction Site Instructions according site situations standard/client`s requirements.
Designing and generating drawings relating to illumination circuits, power distribution systems, telephony systems, fire and gas detection systems, preparation of cable schedule, metric computations and relating construction specifications.
In charged of Lockout & Tag out procedures before and during energizing and running of electrical equipment.
Project: Lagoven S.A, E&I Cabin on ships L-404 and L-405, Maracaibo, Zulia State, Venezuela.
1994 – 1995 Ediven C.A.
Project E&I Engineer
Designing and generating drawings relating to illumination circuits, telephony system, fire and gas detection system; design of the electric power distribution system of more than 1.8 MVA of connected load, preparation of cable schedule and metric computations relating construction specifications.
Performing check-up of quantity and quality of works carried out by a contractor.
Projects: Olive Mall Center, Ojeda city. Commercial Center Christopher Columbus, Ojeda city, and Hotel Maracaibo.
1993 – 1994 Contractor D.O.G. C.A.
Project E&I Engineer
Generating the necessary drawings for the execution of the project.
Performing check-up of quantity and quality of works carried out by a contractor.
Project: Management of Properties Banesco, Remodelling headquarters Banesco Main office, Maracaibo.
Designing and generating drawings relating to illumination circuits, telephony system, fire and gas detection system; design of the electric power distribution system, preparation of cable schedule, metric computations and relating construction specifications.
Load and unload test and running of 2 Transformers. Running batteries bank, UPS devices, UPS boards. New Construction Site Instructions according site situations standard/client`s requirements.
Project: Control Project, Autobanco Banesco.
1991 – 1993 Structural Projects C.A.
Revising the telephony, illumination and air conditioning systems. Upgrading the power distribution system to handle the new requirements.
Project: Obras Publicas del Estado Zulia, Dome of Cabimas.
Performing the quantity and quality check of illumination work carried out by contractors.
Project: Obras Públicas del Estado Zulia, Main Avenue Project of the Cañada Urdaneta".
Generating the drawings required for the execution of the project, including the electric metric computations.
Project: Obras Públicas del Estado Zulia, Construction Highway ‘L’ Project . Ojeda City.
Designing of the power distribution system.
Creating the metric computations for the project.
Checking quantity and quality of works carried by contractors for an installed load of 1 MVA.
Supervising 5 subcontractors (electricity, air conditioning, fire and gas detection system, pumping system and telephony)
Planning, scheduling and monitoring the advance of the works.
Project: Lagoven Corp., Funidez, Sports House Project.
Performing check-up of quantity and quality of work carried out by the contractors for a 225 KVA installed load. New Construction Site Instructions according site situations standard/client`s requirements.
Supervising 4 sub contractors (electricity, telephony, pumping system, fire and gas detection system).
Planning, scheduling and monitoring the advance of the work.
Project: Lagoven Corp., Funidez, Electrical System Revision.
Designing of the power distribution system. Developing the metric computations for the project.
Checking quantity and quality of works carried by contractors for an installed load of 15 MVA
Supervising 5 subcontractors (electricity, air conditioning, fire and gas detection system, pumping system and telephony).
Planning, scheduling and monitoring the advance of the works.
Project: Zulia University. “New headquarter and campus” Electrical System Revision.
E&I planning and scheduling with the contractor. Monitoring and guiding the contractor’s workforce.
Installing and programming 2 PLCs and the SCADA system in the control room.
Performing meggering and continuity checks and functional loop tests.
Hipot, load and unload test and running of 17 Transformers. Running around 20 motors, batteries bank, UPS devices, UPS boards. New Construction Site Instructions according site situations standard/client`s requirements.
Adecuation of the new power distribution system.
In charged of Lockout & Tag out procedures before and during energizing and running of electrical equipment.
Integration and Automation of the system.
Building of the new Control Room (E&I disciplines).
Project: Carbones del Guasare. Adecuation and automatization of Stackyard 1 y 2. Paso Diablo mines.
1991 OBRAS PUBLICAS DEL ESTADO ZULIA
Project E&I Engineer
Designing and generating the drawings relating to illumination circuits, telephony system, fire and gas detection system.
Designing the electric power distribution system.
Preparing of cable schedule, metric computations and relating construction specifications.
Project: New Headquarters of the prefecture of the district of Maracaibo.
1989 – 1990 POLIMEROS DEL LAGO C.A.
Project E&I Engineer
Performing metric computations of vibrations detection system for the compressors. Designing and installing instrumentation for S02 gas separator. Calibrating pressure and temperature measurement equipment of the levels of the reactor. Revising the tank level measurement system. Performing check-up and changes to the automatism of the PLC of sacking section. Installing the PLC system for sacking of polyethylene, the UPS in MCC-2 and 10 Taylor MOD-30 controllers of single loops type in the control room.
Providing technical support to the training section about the start-up sequences and ESD of the plant equipment.
Performing calibration of PLC in different levels of the reactor, new wired from the thermo coupling to the junction boxes for the reactor levels, connection of alarm signals to the new PLC of sacked section, to be carried out during the annual shutdown of the plant.
In charge of Lockout & Tag out procedures before and during energizing and running of electrical equipment during two planning shutdown of the plant.
PROFESSIONAL DEVELOPMENT
1989 Pascal I, UNIDATA C.A. Maracaibo, Zulia State, Venezuela
1990 Pascal II, UNIDATA C.A. Maracaibo, Zulia State, Venezuela
1990 Artificial Intelligence Seminar, Zulia University. Maracaibo, Zulia State, Venezuela
1990 Detectomatic (Fire and gas control system), Honeywell C.A. Maracaibo, Zulia State, Venezuela
1992 TIMELINE (Software for planning, scheduling and control of projects), UNIDATA C.A. Maracaibo, Zulia State, Venezuela
1996 Fiber Optics, ORT C.A. Maracaibo, Zulia State, Venezuela
1996 CCTV, ORT C.A. Maracaibo, Zulia State, Venezuela
1998 DIMS for Windows Security, M&M C.A. Maracaibo, Zulia State, Venezuela
2001 Health and Environment (PDVSA supervisory module), PDVSA. Maracaibo, Zulia State, Venezuela
2001 Work Permit Requirements, PDVSA. Maracaibo, Zulia State, Venezuela
2001 Instrumentation Maintenance, Multicontroles C.A. Maracaibo, Zulia State, Venezuela
2001 Basic Engineering for Instrumentation, Multicontroles C.A. Maracaibo, Zulia State, Venezuela
2001 First Aid Training, PDVSA. Maracaibo, Zulia State, Venezuela
2001 Fire Extinguishing Training, PDVSA. Maracaibo, Zulia State, Venezuela
2009 English level 13 out 19, Venezuelan/American Center
2011 French level 5 out 12, French Alliance
LANGUAGES
English, Spanish (mother tongue). Knowledge of French
ACADEMIC POSTS
1992-1993 Instructor position, Physics II (4th semester), Electronics I (5th semester), Electronics II (6th semester), Industrial Electronics (6th semester), Electrical Maintenance (5th semester), Electric Facilities II (6th semester), University Institute Antonio José de Sucre, Maracaibo, Zulia State, Venezuela
COMPUTER APPLICATIONS
MS Office, MS Project, Timeline, Primavera, Integral system of contracts, DIM for Windows, 3D Model Review
PROFESSIONAL ASSOCIATIONS