MYRON REY SALCEDO YAÑEZ
E-Mail Add : ***********@*****.***
Mobile no.: +971*********
Present Address;
Plot 24, 71st Street,Al Khrair District, Al Ain,UAE
Home Address;
Purok Rosal-A, Villa Verde, Iligan City,
Lanao del Norte
9200 Phlippines
Objective
A position that requires innovation and can fully utilize my education, experience, skills and capabilities in my field of interest.
Personal Details
Sex : Male
Height : 5’ 4”
Citizenship : Filipino
Civil Status : Married
Age: 38 yrs.
Weight: 120 lbs.
Date of Birth : October 23, 1980
Place of Birth : Iligan City
Language/dialect : English, Tagalog, Cebuano, crash arabic
Educational Attainment
College:
High School:
Elementary:
Mindanao State University – IIT
Iligan City
School of Engineering Technology
Electrical Engineering Technology Specialized in Electrical Machinery
Graduated S. Y. 2000 – 2001
Licensed Registered Masters Electrician
Reg. no.: 0039748
Lugait National High School
Lugait Misamis Oriental
Graduated S. Y. 1997 – 1998
I C E CS
Iligan City
Graduated S. Y. 1992 – 1993
POSITION
COMPANY
FROM-TO
Electrical Technician- Installation and Testing
Electrical Technician/ Corn Conveyor Operator
Commissioning Electrical Technician
Pre-Commissioning
Electrical Technician
Maintenance
Electrical/ Cadet Operator
Al Ain Distribution Company- Al Ain, UAE
GHANTOOT Transport and Gen. Cont. L.L.C.- Electrical Projects Division, P.O. Box-129170, Abu Dhabi, UAE
●Responsible for Limited Access Permit document for site surveying and ocular inspection of existing aging, old and unreliable LV Panel and 11kV Package Unit
●Responsible in installation of LV Switchboard, 1.5 MVA Package Unit Distribution substation, 1 MVA upto 15 MVA Transformer and 11kV Switchgear and Testing and Commissioning.
●Responsible of testing and pre-commissioning of 1,800 nos. new installed and existing Earth Fault Indicator(EFI) devices in AADC network e.i. city center, northern region( al Hayer area), western region( al Yahar area) and southern region (al Wagan area)
●Responsible for permit to work document related to de-energization in lieu with Pre Start Safety Review
●Installation of new EFI system e.i. cable containment and devices
•le from Switchboard, MCC, Switchgear, Controller to Load or Motor and MV/LV Transformer
•Continuity and loop checking of control and protection circuit of 11kV, 3.3kV and 415V Switchgears, MCC, Controller and MV/LV Transformer
•Insulation Resistance Testing
•Insulation Resistance Testing of Power and Control Cable at specific voltage applied rating
•VT, PT, CT resistance test
•Motor winding
•Low Resistance (Ductor)Testing
•Contact resistance testing of bus bar coupler at Switchgear, MCC, and Switchboard
•Motor Winding resistance testing
•VT, PT, CT resistance test
•Earth Pit resistance testing
•Motor winding
•Functional Testing
• Switchgear, Switchboard,Motor control, circuit breaker functional test
•Torque Testing
•Bolt and Nut torqueing at applicable size and rating of bolts and nuts
•Relay Testing
•CT Ratio
•CT burden
•CT resistance efficiency
•Energization
•As per as vendors specifications for motor solo run test
•As per as client and vendors specifications for energization
•As-built Electrical drawings
•Red marking actual and as-built electrical wiring circuit and electrical equipments
Consolidated Contractor’s Company-W.L.L.Khursaniyah Producing Facilities-Project A Saudi Aramco Oil and Gas Productions Khursaniyah,Kingdom of Saudi Arabia
•Loop Checking
•Point to point check of control and protection circuit with 13.8kv,4.16kv and 480v switchgears.
•MV,LV motor control circuit
•Testing and pre commissioning
•Motor control center, control gear and switchgear
•Motor winding, control and power cable insulation resistance testing
•Motor bearing insulation resistance testing (ei. MV motor)
•CT,PT,VT testing
•Functional testing
•Simulation of motor control circuit for functional testing at feeder in test mode at MCC, control gear and switchgear
•Motor solo run testing
•Motor current, voltage, power data recording
•Motor vibration testing
•Motor RTD’s, synchronizing power data recording ( i.e. Synchronous motor)
•Pre-commissioning Diesel-Engine Generator
•Generator winding and power cable megger testing
•EDG solo run test
•EDG synchronization to switchgear
•As-Built
•Wiring modification in switchgears, MCC and LCP
•Red marking working drawing and final
as-built field drawing
General Chemicals & Resins Consortium, Inc.
General Trias Drive, Rosario, Cavite
•Preventive and Predictive Maintenance
•Check/Inspect running and stand-by motors; megger testing, amperage, temperature, bearing conditions
•Check/Inspect Generator Set
•Check/Inspect Substation; transformers condition and Plant’s Power Consumption
•Check/Drain Steam and/or Pneumatic Control Valves
•Check/Repair/Install Jet Pump Motors, Boiler Draft Fan Motor, Newlong Machine Motor, Submersible Pump Motor, FVCM Motor
•Check/Repair/Install Nash Vacuum Pump and Nash Compressor Motor
•Repair/Install lightings at Polymerization Area, Boiler Area, DM Area, Dryer Area, and Perimeter lightings
•Check/Inspect reactor agitator motor
•Check/Inspect chiller paump and motor
•Check/Inspect compressor and pneumatic lines
•Special Jobs
• Valve Reconditioning ranging 1” to 6”; Ball Valves, Gate Valves, Globe Valves, Check Valves, Relief Valves, etc.
•Reconditioning Pneumatic Actuator
•Repair/Servicing Air-conditioning Unit
•Assist pipeline fabrication
•Vinyl Chloride Monomer Receiving Team
•Assign Installing/Disconnecting Submersible Hose from Tanker Ship to Underwater VCM Pipeline
•Check/Inspect Land VCM Pipeline Pressure during pumping of VCM
•Monitor possible leaks of VCM and Pipeline
October 6, 2016 to present
August 1, 2013 to December 23, 2013
September 15, 2010 to September 15, 2012
February 27, 2007 to October 28, 2008
April to August 2006
Maintenance Technical Crew
Monde Nissin Corp. Biscuit Section
Casuntingan, Mandaue City
August 2005 – February 2006
•Operates the hi Wrap Packing Machine
- Responsible in packaging the individual biscuits.
• Trouble shoots the machines technical error.
Mechanical/
Electrical
Maintenance
Alson Cement Corp - Union Cement Corp/HOLICIM Group 0f Co. Inc.
Lugait, Misamis Oriental
Under supervision of VEDALI Construction and General Services.
40 Lasmarias Compound, Tibanga, Iligan City
November 2002 - December 2004
•Repair of Timble on pre-heater area
•Install and aligning 3 phase, 750kva Buss Bars
of the Bridge crane
•Assist in fabrication and repair of Kiln
entrance – drawing materials
•Fabricate 12’ x 15’ Billboards
Mech’l/Masonry
•Assist in installation and casting of Bricks in the kiln and cooler area
•Install Y-shape dowels for casting.
•Repair and install plate in wellabelator area.
Electrical Technician
Zodiac Electrical and Industrial Services.
Tibanga, Iligan City
August – October 2000
•Repair and Rewind electrical Motors ratings
50kw, 75kw, 5hp, hp
•Inspection of Air-conditioning unit in a
Department Store. Split and Window type.
•Trouble Shooting
•Repair
•Cleaning
O.J.T.
Semirara Coal Corp-DMCI
Semirara, Mindoro
November 2000 - February 2001
•Assign in Repairing Hi-Power Breaker
•Assign as Boiler operator
•Assign as Turbine – Generator Operator
•Assign Electrician in doing Electrical Works
- Installation of machinery wires
- Installation and termination of 500mcm Cable Wire from
Substation to Control Room
•Assign in Rewinding 500 hp motor and above
•Assign in Calibration of Boilers and Hydraulic Weighing Machines
•Assign in loading of coal-to-coal bin for fueling/firing the boiler.
•Assign in checking/inspecting the 12 – 120Vdc Battery Storage.
•Assign in checking of Electric Motor bearings during operation using vibration tester.
Work Experience
Seminars and Training
INSTITUTE of INTEGRATED ELECTRICAL ENGINEERS of the Philippines, Incorporated
State of Qatar chapter
SCC-DMCI,Inc.
Loss Prevention Department-SAUDI ARAMCO
•Civil Defence Requirements and Basic Fire Alarm System Design,
IP CCTV Surveillance System (more focus on MOI Regulations)
Structured Cabling System (Fiber & Copper with more focus on ICT Regulations),
Fire Alarm System (more focus on Civil Defense Regulations)
•Fire Fighting Conducted by SCC-DMCI, Inc.
•Satisfactorily completed the Work Permit Reciever’s Course within area responsibility work permits Hot, Cold, Confined Space Entry and Gas Releases. ID# 127628 Cert. #36446
Other Skills
•Professional Driver Code 2 3
- Vehicle up to 4500 KGS G V W
- Vehicle Above 4500 KGS G V W
•Automotive Mechanic (Experience)
- Overhauling Diesel Engines
- Trouble shooting Diesel Engine
- Under chases repair
- Brake System repair
•SMAW and Oxy-Acetylene Welding
Character References
Engr. Epifanio T. Destura
Faculty
Engineering Technology
Proprietor
MSU-IIT
Tibanga,Iligan City
Zodiac Elect’l And Industrial Services
Iligan City
Engr. Rogelio Lopez
Supervisor
Biscuit-Section
Monde Nissin Corp. Biscuit Section
Casuntingan, Mandaue City
Engr. VedastoVedali
Engr. AndressReodica
Electrical Engineer
Hassan Mogrhabi
Abdulraouf A. Al-Ghazwi
Paul Lieth
Alden Go
John Corbet
ME/Proprietor
Maintenance Manager
Project Manager
Project Engineer
E & I
Senior Construction Manager
Operations Manager
Director
VEDALI Construction And General Services.
Tibanga, Iligan City
General Chemicals & Resins Consortium, Inc.
General Trias Drive, Rosario, Cavite
Consolidated Contractor’s Co., W.L.L.
KPF- Projects Khursaniya, KSA
Saudi ARAMCO
Project Management Team
Khursaniyah Producing Facilities and Utilities Division
Qatar KENTZ-W.L.L.
Sidra Medical and Research Centre
Cagayan Corn Products Corporation, Inc.
Viola Highway, Coral na Bato, San Rafael, Bulacan
S.A. Kentz CO. LTD- member of SNC-Lavalin group of Co.
Al Khobar, KSA