Ayad Faris Najeeb [EC&I Engineer {Erection / Commissioning}]

Baghdad Iraq

Mobile No. : +964 -770-***-**** E mail: ac7y9h@r.postjobfree.com

+964 -781-***-**** ac7y9h@r.postjobfree.com

SUMMARY OF KEY QUALAFICATIONS

I have eighteen years of experience. I am able to recognize the requirements of the work, and plan for getting all assignments done successfully. Fast problems analyses and very good team player. Willing to improve my skills, and I believe that a good company offers the best engineering environment and by joining it I will meet many professionals those I can exchange my experience with them and gain more knowledge. Excellent experiences of Electrical engineering, low, medium and high voltage distribution systems, control and instrument facilities. Prepare all documents, single lines, schematic diagrams and project schedules for electrical works. Site experience and proven subcontractors and vendors’ management. With a great ability to provide construction and commissioning support, under international standards and codes.

MAJOR FUNCTIONS

1- Senior Commissioning I&C Engineer. – Atrush oil field (Taqa Atrush Production Facilities Phase 1A / Four Wellhead with TAQA, North region of Iraq / Oil & Gas sector. 2- Senior Electrical engineer (Erection Supervisor/Site Manager) - Al Ammara 400/132/11 kV S/s Extension with ABB Sweden, South region of Iraq / Energy sector. 3- Team Lead E&I engineers – Haditha diesel erection project / power station with Electronic Systems Company, West region of Iraq / Energy sector. 4- Electrical Field engineer – OGC second generation project with Bechtel Corporation, Tengiz / Kazakhstan / Oil & Gas sector.

5- Field Substation Automation and control engineer – Start up of the Siemens PLC system & TG5700 / RTU for 400/132/33 kV substations with Washington Corporation, Iraq / Energy sector. EUDUCATION

B.Sc. degree in Electrical Engineering/Baghdad University Year 1999. LUANGUAGE

Fluent in: English, Arabic (Written – Spoken).

KUEY COMPETENCIES

Interpersonal skills.

Leadership.

Managerial skills.

MUEMBERSHIP IN:U -

Iraqi engineers union.

Federation of Arab engineers.

Kurdistan engineers union.

PROFESSIONAL EXPERIENCE

From – To : Feb.-2018 – Dec. - 2018.

Location : Haditha oil refinery/Iraq.

Company : Electronic Systems Company /Oil & Gas sector. Position : Senior I&C Engineer (Team lead).

Work description: Engineering & coordination activities. The main responsibilities of the instrument & control systems included:

• Carry out the upgrade and the technical modifications of the new control system (Fully controlled by DCS).

• Put the rehabilitation plan regarding to the erection and commissioning activities.

• Confer with our client and engineers to assess equipment needs and to determine new system requirements.

From – To : Sep.-2016 – Nov.-2017.

Location : Atrush/Kurdistan region/Iraq.

Company : TAQA International Company/Oil & Gas sector. Position : Senior Commissioning I&C Engineer / O&M. Work description: Atrush Block Oilfield (Taqa Atrush Production Facilities Phase 1A / Four Wellhead

“Pre- commissioning, Commissioning & Troubleshooting”. The main equipment of the Instrument & control systems included:

• Carry out the test & commissioning activities of the Honeywell ICSS package.

• 2X Solar Gas Turbine generators, 5.4 MW.

• Test & commissioning the (11/0.4) kV transformers.

• Test & commissioning the (110V) D.C. system.

• Utility systems which included, Diesel storage tank, transfer pumps & filters, open drains sump & pumps, closed drains & pumps, foam system water tanks & pumps, chemical injection package for process system, Slug catcher, inlet separator, instrument air package, Nitrogen generation package & receiver, LP & ATM Flare system, hot oil fired heater burners, hot oil drain vessel, horizontal diesel vessel, utility water tank & pumps.

• Commissioning and startup the Fire and gas detection system.

• WHCP – Well head control panels.

• TDE – Crude stabilization package.

• Arrangement and follow up the required steps related to the start up the system to be ready for handover to the client.

From – To : Oct.-2015 – Aug.-2016.

Location : Nassiriyah/South region/Iraq.

Company : Masharq Baghdad Company/Energy sector.

Position : Site Manager / Senior Commissioning EC&I Engineer. Work description: Al Nassiriyah TPS (4X210 MW) “Survey & integrated study to submit the final proposal of the new control system with rehabilitation activities”.

• Prepare and submit an integrated study for whole control system within the requirements of upgrading and maintenance through improved and renewed the DCS.

• Install a new (400&132) Kv dis-connector with earth switch in the switchyard of the power plant.

• Install a new common-timing system for astronomical lock-on of archive data it is introduced of common-timing system into DCS & debugging the programs with the established equipment.

• Test, commissioning, function check & calibration different type of the instruments in the all facilities “smart control devices” related to the different brands.

• Install, wiring & configure the new turbine flow meters to calculate the amount of water and fuel disbursed for each unit.

• Rehabilitee the burner’s ignition system.

From – To : Oct.-2013 – Aug.-2015.

Location : Al Ammara/South region/Iraq.

Company : ABB Company-Sweden/Energy sector.

Position : Senior Electrical Engineer (Site Manager / Erection Supervisor). Work description: Al Ammara 400/132/11 kV S/s Extension “Installation, Calibration, Site management

& coordination”.

• Supervision on the all Installation, calibration activities for the extension of the substation of 6 no’s diameters air insulated 400 kV switchgear, 2 no’s 400 kV bus sections, 3 no’s 400 kV shunt reactors, 26 no’s bays 132 kV air insulated switchgear, 3 no’s 11 kV grounding reactors.

• Supervision on the installation for 2 no's 11 Kv Switchgear, 1 no’s emergency diesel generator.

• Supervision on the all installation activities for (110 V & 48 V) D.C. system including battery chargers and distribution systems.

• Carry out the calibration activities for (400&132) kV dis-connectors.

• Supervision on the installation activities for cable tray, arrange and follow up the schedule laid of the different cables (power, control & fiber optic).

• Supervision on the installation activities for PLC & protection relay control panels.

• Follow up the spare part materials and handover to the client.

• Support the commissioning team and complete final check out with the required erection documents of equipment's installation to ensure quality and conformance to specifications.

• Ensure all activities are conducted and managed in accordance with agreed Health, Safety and Environment practices and procedures.

From – To : Dec.-2012 – Sep.-2013.

Location : Baghdad/Middle region/Iraq.

Company : Electronic Systems Company/Energy sector. Position : Team Lead I&C Engineers.

Work description: Al QUDIS 3 – Gas turbine power plant (4X125 MW) "Installation, Calibration & Commissioning" / Site management & coordination

• Perform all commissioning activities for GT & BOP (GE-GT9e).

• Applying engineering technical expertise related to design, specification and operation of the GT systems to carry out root cause analysis and investigation into system problems and failures.

• Review vender drawings for high, medium &low voltage systems

• Provide technical support and supervision my crew (engineers & technicians) to complete the commissioning, operation procedure and troubleshooting of the GT systems to meet project schedules.

• Prepare system handover packages with correct documentation, including checklists, test lists and red lines drawing.

• Ensuring necessary HSE reviews are undertaken and identified action completed. From – To : Jan.-2009 – Nov.-2012.

Location : Haditha/West region/Iraq.

Company : Electronic Systems Company/Energy sector. Position : Team Lead E&I Engineers.

Work description: Power plant – Diesel project (10X23 MW) –"Installation, Calibration & Commissioning” (Erection & Commissioning / Site management & coordination).

• Installation, test & commissioning for (13/0.4) kV Alstom switchgear.

• Installation, test & commissioning for (13/132) kV Alstom power transformers.

• Installation, test & commissioning for (13/0.4) kV Alstom auxiliary transformers.

• Perform inspections and did it all installation for (control equipment, control cable & control panels) and calibration, functional check activities for different instruments type in the power house (10X23 MW) and auxiliary units (Common production compressed air, Heavy fuel treatment unit, Power plant lub oil, Common diesel oil, cooling tower, Firefighting, Water intake, Water treatment units, Steam distribution unit).

• Ensure all activities are conducted and managed in accordance with agreed Health, Safety and Environment practices and procedures.

From – To : May-2007 – Oct.-2008.

Location : Tengiz/Kazakhstan.

Company : Bechtel International Inc., /Oil & Gas sector. Position : Senior E&I Field Engineer (Supervisor). Work description: (Pre - commissioning, commissioning and troubleshooting / “Site management & Supervision”).

• Perform the installation activities for (132 /33/11) Kv switchgear and the local LV distribution boards in the field.

• Perform the installation & commissioning activities for the local control panel and different instrument equipment's related to the various systems in the crude, gas & sulphur areas.

• Perform inspections of all heat trace installation & testing activities in progress on a continual basis and complete final check out of heating equipment’s installations to ensure quality and conformance to specifications and codes prior to turnover to client for system start up.

• Provide the engineering support for the client by working with SGP / CCST related to the different electrical & control commissioning activities.

• Maintain a safe work ethic and environment.

From – To : Sep.-2006 – Apr.-2007.

Location : Middle & South region/Iraq.

Company : Washington International Inc., (WII) /Energy sector. Position : Substation Automation and Control Engineer. Work description: (Power substation - 400/132/11 kV - SCADA project / Site management & Supervision “Erection & Commissioning”) / More than 15 power substations.

• Test & commissioning the PLC system for power substations (Off line test & on line test).

• Test & commissioning the RTU system for power substations Test 1(HMI to RTU), Test 2 (HMI to Field), Test 3(SCADA Master to RTU) & Test 4 (SCADA Master to Field)”.

• Use (ASE 2000) software of SCADA system to locate the problem (type & place). From – To : May-2005 – Sep.-2006.

Location : Middle & North region/Iraq.

Company : Technical Diagnostic services Inc., (TDS) /Energy sector. Position : Team Lead Electrical Commissioning Engineers. Work description : (Power substation – 132/33/11 kV / Site management, Supervision for Construction / Commissioning”).

Middle region:

• Test & commissioning for VATECH (132/33 kV) / switchgear.

• Test & commissioning for ALSTOM (33/11 kV) / switchgear. North region: (More than 25 power Substations).

• Test & commissioning for ABB (33/11 kV) / switchgear.

• Setting & testing ABB protection relay (542 +) & differential relay (SPAD).

• Power transformer tests.

• Auxiliary transformer tests.

• Test & commissioning the 110V DC system including (Chargers & Batteries).

• Loop check for RTU marshaling cabinet (All signals). From – To : March-2004 – March-2005.

Location : Al Nassiriyah /South region/Iraq.

Company : Electronic Systems Company /Oil & Gas sector. Position : Field E&I Engineer.

Work description : Oil refinery/10000 barrel/(Erection & Commissioning).

• Carry out the test & commissioning activities of the Honeywell ICS cabinet.

• Installation, Testing & commissioning including, loop test, calibration & function check for smart instrument control devices related to the different industrial utilities.

• Install a new UPS instead of the old one for the distribution control panel. From – To : June-2003 – Feb.-2004.

Location : Al Mussaib /South region/Iraq.

Company : Electronic Systems Company /Energy sector. Position : Field E&I Engineer.

Work description: Al Mussaib thermal Power station (4 x 320) MW

• Perform the maintenance procedure & calibration activities for generator cooling control cubicle.

• Perform the maintenance procedure for Hydrogen plant.

• Perform the maintenance procedure & calibration activities for the different field control devices.

• Check & test the electrical and control loop for the alarm system & repair the electronic cards. From – To : March-2000 - May-2003.

Location : Middle & South region/Iraq.

Company : Electronic Systems Company /Industrial sector. Position : Field E&I Engineer

Work description : Different utilities projects.

• Rehabilitate & maintenance the main control panel with the mimic of the monitoring control system & re- load the user program instructions software of the PLC for Harding and thermal treatment furnace.

• Design, implement & install control board for hydraulic press system (1000 ton) & rehabilitate the main control room.

• Cause & effect analysis for chemical injection units for closed control system. TRAINING COURSES

1- Training course (Test & commissioning for 33/11 Kv switchgear, power transformers, Tapcon 230 & ABB REF & SPAD) with duration one month by Technical Diagnostic Services Inc.

(TDS).

2- Training course (SCADA system – PLC & RTU) with duration two weeks by Washington International Inc. (WII).

3- Training course (Safety Refresher course) by Washington International Inc. (WII). 4- Training course (Safety leader ship) by Bechtel International Inc. 5- Training course (C.R.A.F.T.) by TCO – PFD.

6- Project Execution Plan (G01GAM00001).

7- Project Procedures (GPPGAM-00004).

8- As-Built/Redline Drawing Procedure (GPPGEX00001). 9- Construction Environmental Control Plan (H01G00001-0). 10- Construction Commissioning and Operations Interface (STCP20202). 11- Startup Standards and Guidelines - General Information, Startup Manager Project Assessment / Readiness Review Procedure (SU102).

12- Startup Standards Guidelines - General Information, Startup Terms & Definitions (SU101). 13- Construction Environmental Control Plan (CECP) Development and Implementation (CON1105). 14- System Completion and Turnover (CON1601).

15- Project safety management by ABB.

16- Stop take 5 by ABB.

17- Driving safety by ABB.

18- WAH by ABB.

19- SOT by ABB.

PROFESSIONAL DEVELOPMENT

Technology skills: Windows, MS office, Computer Arch., Assembly language, Electronic work bench, Microsoft Visio, H/W Installation & Internet.

Skills

• High engineering performances.

• Ability to be good support for team work.

• Work with multi nationalities team.

• Put the estimated work plans; regarding the site conditions and other disciplines activates.

• Find the optimal solutions for any problem in the work.

• High communication skills (Oral/Written).

• Ability to cope with a variety of issues and situations.

• Supervising engineering and technical staff.

• Creating and carrying out test procedures.

• Prepare all system handover packages with correct documentation, including checklists, test documents, as built drawings, etc.

• Technical competence in reading and interpreting electrical/mechanical flow and instrument diagrams.

REFRENCES

1- Mr. Mark McCann (Instrument and Control commissioning lead engineer / Atrush oil field (Taqa Atrush Production Facilities Phase 1A / Atrush Block – Iraq – TAQA GLOBAL / ac7y9h@r.postjobfree.com).

2- Mr. Harry Berg (E&I and field engineering manager / SGP project / Tengiz - Kazakhstan - Bechtel International Inc. / ac7y9h@r.postjobfree.com & ac7y9h@r.postjobfree.com). 3- Mr. Alaa Ali (Senior Electrical Engineer / Gabon - Bechtel International Inc. / ac7y9h@r.postjobfree.com). 4- Mr. Mohammed Hadad (ABB commissioning manager / Al Ammara 400/132/11 Kv S/s project – Ammara – Iraq – ABB Sweden / ac7y9h@r.postjobfree.com). 5- Mr. Omar Al Safi (Project manager / ABB Sweden / ac7y9h@r.postjobfree.com). 6- Mr. Lars Goran ( ABB Site coordinator manager / Al Ammara 400/132/11 Kv S/s project – Ammara – Iraq – ABB Sweden / ac7y9h@r.postjobfree.com). 7- Mr. Qais Al Sareeah (GE / TA Control Engineer / Gas Turbine Power Plant – Iraq – GE Iraq / ac7y9h@r.postjobfree.com).

8- Mr. Joe Zahora (SCADA project manager / Iraq - Washington International Inc. / ac7y9h@r.postjobfree.com).

9- Mr. Elibert Pascual (Commissioning SCADA project manager / Iraq - Washington International Inc. / ac7y9h@r.postjobfree.com).

10- Mr. Shriram Waghmode (Lead electrical field engineers / SGP project / Tengiz - Kazakhstan - Bechtel International Inc. / ac7y9h@r.postjobfree.com). 11- Mr. Jim Nesbit (Technical Diagnostic Services Inc. & Bechtel International Inc. / ac7y9h@r.postjobfree.com).

12- Mr. Dick Sanders (E&I and field engineering manager / SGP project / Tengiz - Kazakhstan - Bechtel International Inc. / ac7y9h@r.postjobfree.com).

13- Mr. William Collins (Electrical superintendent / SGP project / Tengiz – Kazakhstan - Bechtel International Inc.)/ac7y9h@r.postjobfree.com).

14- Ms. Joanne White (Project manager / SGP project / Tengiz - Kazakhstan - Bechtel International Inc. / ac7y9h@r.postjobfree.com).

Signature: Date:

Ayad F. Najeeb 13/12/ 2018



Contact this candidate