Resume

Sign in

Power Plant Electrical Engineer

Location:
Jeddah, Makkah Region, Saudi Arabia
Salary:
20 000 Ryal Saudit
Posted:
December 05, 2018

Contact this candidate

Resume:

MOHAMMED AL-AMINE DAASSI Mars, ****

Tunisia Mobile: 002**-**-***-***

ac7vmm@r.postjobfree.com

Dear, Sir

I am writing to express my interest in applying for vacancies; I am currently employed at Tunisia Electricity & Gas Company as Interne Auditor at Electricity Technical Audit Department, Power Plant operation Supervisor Coordinator, Power Plant Commissioning, Planning Maintenance & Procurement Material Department and Technical Support.

I have a total of 28 years of full-time work experience supervising the cogeneration POWER PLANT steam turbine, and I’m graduated in electrical engineering from USA university, Electronic Domain (ISET Tunisia) and hold a Professional Diploma Degree of assembly Aerospace structures (skins airplane) from Montreal Aerospace School, Quebec, Canada. I believe that the skills I have acquired through my professional and educational experiences will be valuable assets for your organization and / or clients.

Attached are my contact details and detailed CV for your review. I would appreciate the opportunity to speak with a member of your recruiting team.

Thank you very much for your consideration.

Sincerely,

Engr. Mohammed Al-AmineDaassi

MOHAMMED AL-AMINE DAASSI

Saudi Arabia Mobile: 966-0501887592

ac7vmm@r.postjobfree.com

Rābigh, Saudi Arabia

SUMMARY

Profile : Male, 49, Married

Nationality:Canada, Tunisia

Current Location:Saudi Arabia

Current position: Supervisorcoordinator planner

Company:SEC, RAWEC,STEG

Preferred location: Saudi Arabia

WORK EXPERIENCE

Supervisor and Operator

I am currently working for Saudi Electricity Company, as Coordinator Power Plant MaterialDepartment. In my position I am responsible for supervision of Co-generation Power Plant assteam turbine operation department and experienced at Technical Support, Planning Maintenance & Material, having a Professional skills in FGD and DM plant.

Main challenges:

To adjust operating parameters as instructed to sustain continuous production whilst maintaining a high degree of HSE awareness.

EDUCATION

Sep 2000 – Jun 2002 Electrical Bachelor EngineerUSA, California

Jan 2000- Aug 2000 Certified Bombardier Aerospace CompanyCANADA, Montreal

Sep 1995 - Jun 1999 ISET TUNISIA, Tunisia

Application Electrical Engineer, Bachelor

Sep 1981 - Sep 1987 Secondary school TUNISIA, Tunisia

Metallurgic, TECH Diploma

Sep 1974 - Jun 1980 Primary school TUNISIA, Tunisia

Access secondaryschool,

OTHER CERTIFICATES

2014-2017Safety Training (safety driving, fire fitting system, etc…) Saudi Arabia

2007-2014 SAFETY Training and Maintenance Training Saudi Arabia

MISTSHIBISHI, MELCO, Training

LANGUAGES

Arabic: Native

French:Native

English: Working knowledge

COMMENTS

December 2014 –2017Saudi Electricity Company Saudi Arabia

Missions released :( PowerPlant Planning Maintenance & Material Coordinator)

Coordinates with planners, maintenance coordinators, operations and maintenance supervisors for the efficient job executionto line manager.

Coordinate the acquisition and flow off production materials

Review production schedules and ensure all materials are available at all times

Examine materials to ensure that they conform to quality standards

Arrange transfer of materials within the organization Compile and maintain records of materials purchased

Ensures the timely delivery of quality SEC products at the lowest possible cost

Participates in the selection of suppliers based on a criteria

Complies with the SAP SEC procedures and regulations: PR, EMS, PRINS and

Conducts a comparative analysis on supplier prices

Reviews and evaluates the performance of the suppliers

Processes the necessary clearance documents

Closely liaising with the clearing agents

Carries out all necessary procurement activities

Ensures the proper processing of assigned customer orders

Coordinates the Sales and Dispatch officers when processing the orders

Submits final invoices to the Finance and Accounts Department

July 2007 – December 2014 RAWEC Saudi Arabia

Missions released :( Power Plant Operation Coordinator)

Having and relevant experience in industrial steam power plant, (boilers, turbines, and auxiliary equipment)

Commissioning of 5 nos. steam turbine, with a total 600MW, MITSUBISHI

Commissioning of 4 nos. steam turbine, with a total 2800MW, DOOSAN

Experienced in steam power plant operations, duly trained by MITSUBISHI Heavy Industries Inc., and DOOSAN Heavy Industries.

Carry out shift plant operation/ production activity

Generate details troubleshooting and improve work procedure

Control and maintain auxiliary plant equipment from DCS and local, such fans, compressor, pumps, Boiler, turbine, DM plant and FGD

Monitor the plant equipment reading and detect evidence of operating problems

(Temperature, pressure, flow, level, PH, conductivity and leakage)

Ensures lockout and tag out procedures are accomplished prior to performing equipment maintenance.

Perform the plant startup and shutdown and quickly emergency restore the plant and equipment against any abnormality condition.

Insulate and restore the plant equipment after maintenance

Review the PI&D of the plant

Perform the plant equipment routine change over and maintenance

Present technical training equipment operators with emphasis on safety, quality and regulatory compliance (presentation).

Ensure that Health and Safety rules policies and procedure

planned maintenance schedule

Dec 2001- July 2007 LUTREX Canada

Missions released :( Control Quality and assembly skin airplane Components).

Assembles structural parts and components to meet requirements for preserving structural integrity and low observable qualities. Assesses damage to aircraft structural components and low observable coatings.

Development of the normalized procedures: Rules, Responsibilities and methods guaranteeing the quality of the benefits Maintenance.

Manufactures, assembles, installs, inspects and repairs several essential components of skin airplane.

Ensures the quality of the assembly and makes the necessary adjustments.

Manufactures, assembles, adjusts and installs the parts that make up the structure of an airplane.

Performs machining and riveting operations on composite materials

1989-2001 STEG (TUNISIANELECTRICITY AND GAS COMPANY)

Missions released:(Technical Support)

Evaluation of vendors and suppliers

Material reception complying with request specification and the regulation.

Contributes suggestions in analysis of failures and the reforms necessary to avoid them commissioning activities

Commissioning for 2 turbines and 2 boilers steam turbine, including all auxiliaries’equipment with a total 340 MW both.

Monitoring and inspection of effected activities on production quality (productions are maintenance services.

Assessment for external quality audit and or qualification of manufacturer/contractor/vendors requisition basis

Final authorization for incoming material inspection and following the traceability procedure

Authorized for final inspection of, for repairs / work orders which required quality release

CHARACTERISTICS PERSONNEL

Fast and easy adaptation with team spirit

Good MS officeskills



Contact this candidate