Post Job Free

Resume

Sign in

Engineer Power Plant-Instrumentation engineer

Location:
Tehran, Tehran Province, Iran
Posted:
December 06, 2018

Contact this candidate

Resume:

MS. AREZU MOHAMMAD HOSSEINI

Name : Arezu Mohammad Hosseini

Position : Head of Instrument & Control Department / I&C Expert Engineer

Nationality : Iranian-Turkish (Dual Nationality)

Languages : English- Turkish- Persian- basic knowledge of German

Date of Birth : 10 September 1973

Status : Single

Home address : 4th floor, No. 7, 222 Gharbi alley, Bagheri Highway, Tehran, Iran

Telephone : 0098-217-***-**** (Home)

: 0098-912-***-**** (Cell phone)

E-MAIL : ac7v06@r.postjobfree.com

Studies : YILDIZ TECHNIC UNIVERSITY OF ISTANBUL - TURKEY

Qualifications : Bachelor of Science, Electrical Engineering (1996-2000)

Memberships : Organisation for Engineering Order of Building – Tehran, Iran

Work experience

Company

:

BEHTA NDUSTRIAL GROUP

Position

:

Head of Electrical and Instrument Department

Date of Employment

:

2017 up to now

Company Activities

Pojects

:

:

Engineering Consultant in oil, gas and petrochemical projects

Flare Gas Recovery and Utilisation Project (consertium with SOFREGAS SAS France), South Pars Field development second gas refineries phase 2&3 Facilities

Company

:

SAZEH TADBIR MAROON

Position

:

Principal I&C Engineer

Date of Employment

:

2017 (Part time)

Company Activities

Projects

:

:

Engineering Consultant

Bitumen Storage and Transferíng Facilities (Client was Fuman Chemical Co.)

Company

:

IRANIAN OFFSHORE OIL COMPANY (IOOC)

Position

Date of Employment

Company Activities

Responsibilities

:

:

:

:

Principal I&C Engineer

2015 up to 2017

Owner

Scope of work evaluation for I&C Department, analysed and consideration the claims of EPC Contractors

Company

Position

:

:

ENERGY & INDUSTRIAL Consultant (EIC)

Tehran/IRAN

Head of I&C Department

Date of Employment

Company Activities

:

:

2011-2015

Consultant & Engineering Services of Oil, Gas and Petrochemical, Industrial Project

Projects

:

Light & Heavy Crude Oil Pump Station & 132 KV Power Transmission Line and Power Post,Approximately Total Qty. of I/O ‘s : 700,One Eng. Station and two Operator Station

ATK Unloading Arms and Inlet Filtration Phase II (Client was Imam Khomeini International Airport (IKIA)) Approximately Total Qty. of I/O ‘s : 345, One Eng. Station and One Operator Station

Khatoon Abad Smelter Expansion and Modernization Oxygen Plant (Client was National Iranian Copper Industries Company). Approximately Total Qty. of I/O‘s: 150, One Eng. Station and One Operator Station. Control system was included in Linde Control System

Engineering, Procurement and Installation of New Electrostatic Desalters of Ahwaz Asmari (1-4) Desalting Units (Client was N.I.S.O.C)

Approximately Total Qty. of I/O’s: 320, One Eng. Station and One Operator Station for each Asmari. The most I/O’s had been Petrotechna scope of works.

Management Contractors for New 48” Gas Transmission pipeline Branch of IGAT VI from Kouh-Dasht pressure control station to Naft-Shahr Metering station in IRAN-IRAQ boundary for export purpose.

Responsibilities

:

Head of Instrument & Control department.

Instrument engineering team consisted of 6 I&C engineers and I was managed 5 I&C Engineer.

Review and authorizing of PETROTECHNA Engineering Documents about Desalters

Review of P&ID and Instrument Documents of LINDE Company (Oxygen Plant) and Going to Germany for Factory Acceptance Test in Linde Company

Review and authorizing of (P&ID Preparation, Instrument Data sheet, Instrument Index, I/O List, Wiring diagram, Loop Diagram, f&g loop Diagram, Installation Details, Process Hook-up

Internal Discipline check of Mechanical, Process and Electrical Department

Detailed planning, coordination and interfacing of engineering activities.

Negotiation with client and cost control in all of detail design projects

Management of the department includes, personnel and salary management, budget control, performance management as well as a Technical and project execution support.

Company

:

SAZEHPARDAZI IRAN Consultant (SPI)

Tehran/IRAN

Position

:

Head of Instrument & Control Department

Date of Employment

:

2006- 2011

Company Activities

:

Consultant & Engineering Services of Oil, Gas and Petrochemical

Projects

:

Petrochemical zone phase II (asalouyeh) off site facilities (Client was N.I.O.C).

Phase-2 will produce various petrochemical products and intermediate cuts additional to those which would also be produced in the Phase-1 of this Petrochemical Zone. Also new products would be produced in the Extension Phase-2. Some of products being produced were for export and some would serve as an intermediate chemical to be processed in other Plants within the Assaluyeh petrochemical Zone. This project had been 13 ITR’s, DCS and SCADA Systems.

Natural Gas Reduction Station (Client was N.I.O.C)

It contained 23 subsystems, the control system for each gas station included monitoring system and I/O’s transferred via fiber optic to SCADA system.

Firefighting station (Client was N.I.O.C)

4 firefighting station linked via water ring and each station had been an un-manned control room. Each control system had been min. 150 I/O’s for control and monitoring.

100000 ton Silo of Garmsar

That project Qty. of about wheat silo’s, Qty. of I/O’s :450

Sirri island gas gathering & NGL recovery (Client was IOOC) (EPC)

The purpose of this project to cover the technical requirements for the design, supply, testing, vendor documentation of NGL recovery system. 4 pipe line including propane, butane, pentane and condensate, metering equipment, and associated control system Metering System and proving system had been for custody transfer of liquid propane, liquid butane, liquid pentane and condensate. Metering system included of multi-path ultrasonic flow meters and the corresponding Instrumentation, together with the associated control panel including the required hardware and software. One master meter prover was be provided, which could temporary be set in service of one of any 4 ultrasonic flow meters for proving purposes. Master Meter Prover was included one turbine type flow meter and the corresponding instrumentation. (Qty. of I/O’s :450)

Responsibilities

:

Head of Instrument & Control department.

Instrument engineering team consisted of 6 I&C engineers and I was managed 5 I&C Engineer.

Reviewed of basis design (Concept)

Reviewed and authorized of (P&ID Preparation, Hazop study, instrument Data sheet, Instrument Index, I/O List, Wiring diagram, Loop Diagram, Cause and effect Diagram, ESD Philosophy, Control system philosophy, Hazop Study, f&g Data sheet, f&g index, f&g loop Diagram, Installation Details, Process Hook-up, etc.

Calculation of Control Valve, PSV, Flow Element with In-tools and related software.

Internal Discipline check of Mechanical, Process and Electrical Department

Detailed planning, coordination and interfacing of engineering activities.

Negotiation with client and cost control in all of detail design projects

Management of the department includes, personnel and salary management, budget control, performance management as well as a Technical and project execution support.

Company

:

RASM ARA Co.

Tehran/IRAN

Position

:

Electrical and Instrument Engineer

Date of Employment

:

2004-2006

Company Activities

:

EPC Contractor of Oil, Gas and Petrochemical

Projects

:

Lavan Power System Improvement, Refurbishment And Renovation Project (Client was IOOC)

Power plant building civil and electrical works in order to construct a unit place for Gas turbine generators and the auxiliary systems and panels of electrical generators. Control & switchgear room building works in civil, electrical, instrumentation and control, mechanical and piping disciplines to provide a power distribution system for the modified loads of LAVAN Island. Design, procurement and construction of transferring gas oil from daily tank to skid.

Responsibilities

:

Electrical and Instrument Engineer

Designer of drawings and documents of (P&ID Preparation, Installation Detail, Hook up and instrument layout, Loop wiring, specifications, I/O List, Inst. List, Data Sheets, Cable Route, Cable Schedule, Single Line Diagram, Schematic Diagram, Ups Calculation, Load Calculation with E-tap, Earthing Diagram, Material Take off, Material Requisition).

Company

:

KHERAD WATER TREATMENT Co.

Tehran/IRAN

Position

:

Instrument and Control Designer (junior Engineer)

Date of Employment

:

2004-2005

Company Activities

:

EPC Contractor of Water treatment plant, Power Plant,

Projects

:

Damavand Gas Turbine Power Plant (Client was MAPNA)

South Isfahan Open Cycle Power Plant(Client was MAPNA)

Shirvan Gas Open Cycle Power Plant(Client was MAPNA)

Responsibilities

:

Instrument & Control Designer

Designer of drawings and documents of (P&ID Preparation, Installation Detail, Hook up and instrument layout, Loop wiring,, I/O List, Inst. List, Data Sheets, Cable Route, Cable Schedule, Material Take off

Company

:

INTELLIGENT SOLUTION Co .

Tehran/IRAN

Position

:

Instrument and Control Engineer

Date of Employment

:

2002-2004

Company Activities

:

EPC Contractor of Oil, Gas and Petrochemical, Water Treatment, SCADA and Telemetry.

Projects

:

Sattarkhan dam water distribution system, Design, Implement and Installation Automatic Control, Distributed Valve house of Sattarkhan dam

Responsibilities

:

Electrical and Instrument Engineer

Designer of drawings and documents of (Lighting system, Earthing System, Installation Detail, Hook up and instrument layout, Loop wiring,, I/O List, Inst. List, Data Sheets, Cable Route, Cable Schedule, Material Take off

Review of bid documents.

Vendor selection and optimizing project budgets.

Detailed planning, coordination and interfacing of approved vendors

Company

:

SHANLILAR LTD.

Istanbul/Turkey

Position

:

Electrical Engineer

Date of Employment

:

2000-2002

Company Activities

:

EPC Contractor for building.

Responsibilities

:

Electrical Designer/ Engineer

Designer of drawings and documents of (Lighting system, Installation Detail, Cable Schedule, Material Take off

Optimizing project budgets.

Computer Literacy : Conversant in INTOOLS, FLOWEL and INSTRUCALC for Calculation

Familiar with MS office (Excel, Word), Adobe reader & Autocad

Familiar with MS Project

Personal Profile

A successful and well qualified Instrument and Control Engineer with over 18 years’ experience within the Petroleum, Gas and Petrochemical industries that has included project managing up to a million dollar EPC projects. Possessing a thorough knowledge in all aspects of Control and Instrumentation engineering and the ability to develop and lead multi-national teams in remote locations and for complex operations.



Contact this candidate