SAHAYA JOHNSON
Email: ac7svp@r.postjobfree.com
Mobile No: +91-897*******
Present Address
*/***, ****** ***** ******, Kurumpanai post, Kanyakumari dist, Tamil Nadu, India. Pin – 629251
Mobile No: +91-897*******
Permanent Address
1/122, Sahaya Matha Street, Kurumpanai post, Kanyakumari dist, Tamil Nadu, India. Pin – 629251
Mobile No: +91-897*******
Personal Data
DOB : 25-11-1990
Nationality : Indian
Passport No : K8995963
Expiry Date : 05/02/2023
Languages Known
Speak: English, Tamil, Malayalam
Read : English, Tamil
Write: English, Tamil
SKILLS
Fire & Safety
MEP/HVAC
Auto CAD (Mechanical)
Career Objective
To have a growth oriented and challenging career, where I can contribute my knowledge and skills to the organization and enhance my experience through continuous learning and teamwork.
Academic Details
Bachelor of Engineering in Mechanical Engineering (2010 – 2014) from DMI Engineering College, Aralvoimozhi, India.
With 6.87 CGPA.
Diploma in Fire and safety Engineering (2009-2010) from NIFE, Nagercoil, India.
With Grade B
NEBOSH, IOSH From Arbrit Safety & Engineering Pvt Ltd Trichi, India. (International certificate)
HVAC From Creation Engineering Academy (Aug, 2015), Chennai, India.
HSC (+2) (MAR, 2008) St. Ignatius Hr Sec School, from State Board of Tamilnadu, India.
With 62% aggregate.
SSLC (10th Std.) (MAR, 2006) St. Ignatius Hr Sec School, from State Board of Tamilnadu, India. With 69% aggregate.
Summary of Experience
Previous Employment
Organization : V.R.G Construction Pvt Ltd,
India.
Designation : HVAC Engineer
Experience : MAY 2014- April 2018
COMPREHENSIVE EXPERIENCE
Execution, Monitoring, Report to Higher Officials.
Planning, Installation, Testing & Commissioning.
Job Responsibilities on Mechanical Installations:
Get approved HVAC Shop Drawings, MEP- Coordination Drawings, Work method statement and Project Specification from Project Engineer.
Ensure the HVAC Ducts, Fittings, accessories and Child water pipes, fittings, accessories are available and approved by Inspection department prior to installation
Ensure sufficient hand tools, power tools, ladder and scaffolding are available for installation
Coordinate with other discipline and ensure site clearance is available to start the HVAC Activities
Arrange the sufficient manpower such as Supervisor, Foreman, Duct fitter, pipe fitter, Assistant duct and pipe fitter etc.., and ensure all of them attended safety orientation and having proper PPE’s prior start installation activities at site
Provide approved HVAC Shop drawing, MEP Co-ordination Drawing to site supervisor (or) Foreman and inform them to shift the required ducting and piping approved material from warehouse to site and arrange required material to avoid progress delay.
Prior to start HVAC activities notify to QC Personal for surveillance to ensure the quality work
To maintain safe all construction HVAC and Chilled water piping activities are carried out in accordance with the Company’s safety policies and procedures; ensure that appropriate safety and protective equipment is used by Company & Contractor staff.
Closely monitor site activities to ensure quality of work is in compliance with approved shop drawing and Specification and get daily progress report from site supervisor (or) foreman and update to project Engineer (or) Manager
Preparing relevant documents to conduct inspection for completed installation activities and raise RFI to QC-Inspector (To ensure that any activity offered for inspection has an attachment of IFC drawing, method statement (if required), Inspection & Test Plan (ITP) followed by check list)
Carry out all planned site inspections as per the intervention points marked in the relevant drawing and standard
Preparing the relevant documents to Conduct Testing inspection such as Duct light testing for Ducts and Hydro test for Above ground and Underground chilled water piping’s, systems.
Active involvement in weekly meetings with the Project management & QC Supervisor and manager to resolve the site related issues.
Assist the Commissioning Team in Pre-commissioning & Commissioning stages of all HVAC Equipment’s.
Assist the Commissioning Team on Testing, Adjusting & Balancing (TAB) stages of the Air and Hydraulic Piping’s
DECLARATION :
I hereby Confirm that the above given details are true to the best of my knowledge.
Place: Yours Truly,
Date: (Sahaya Johnson)