OBJECTIVE

To become part of an Organization involved in EPC, Oil, Gas, Power, Petrochemical Industries and Manufacturing in the Field of Quality Assurance/Control, Documentation, Examination, Inspection and Testing. To participate in the successful completion of the Project through the application of Knowledge, Proficiencies, Skills and Experiences with a group of Professionals and Technical People in their respective, progressive and Internationally Recognized System that offers Opportunities for Continuing Professional Development (CPD).

SUMMARY OF QUALIFICATIONS

13 Years extensive experienced in all types of construction project as a QA/QC Piping / Welding Inspector, Piping Engineer and Piping Supervisor in Petrochemical, Power, Utilities and Off Sites, Refinery & Oil and Gas.

A Well experienced working in Engineering Procurement and Construction, conversant with Engineering Designs and Specifications.

WORK HISTORY

I.Jebel Ali Power Station M-extension Project

Siemens LLC

Jebel Ali, Dubai, U.A.E.

Piping Engineer

Duration: October 1 2016 to August 4 2018

Day to day monitoring of Piping progress, manpower, and equipment record.

Responsible for supervising construction activities in piping Subcontractor trades personnel related to a discipline. Maintains the highest quality standards while administering good construction safety practices with all on-site activities.

Ensure that all sub-contractors employees are adhering to the company Health, Safety, and Environmental excellence policy.

Promote job site safety, encourages safe work practices and rectifies job site hazards immediately. Regularly participate in HSE meetings, toolbox talks, and daily jobsite walks.

Direct all field personnel including those of construction subcontractors to achieve completion of the project on schedule, with quality workmanship that conforms to original plans and specifications.

Ensure that each reporting supervisor is capable of performing their allotted scope of work.

Contribute to construction schedule and 6-weeks look-ahead, understand the project plans and specifications, identify and solve problems, order materials and schedules inspections as necessary throughout the process.

Maintain positive working relationship with customers, contractors, suppliers and other employees.

Serve as a coach and mentor for subordinates and identify construction Supervisors with capacity to be promoted to Superintendent level.

Implement standardized construction work processes, procedures, manuals and systems and create a system of control in each specific area.

Lead, motivate, communicate with, develop, appraise and performance manage staff to ensure that staff are fully motivated to achieve best performance to meet the project and company’s needs.

II.Independent Water and Power Plant

Hyundai Engineering & Construction

Al Mirfa Abu Dhabi, U. A. E.

Piping Engineer

Duration: August 22, 2015 to September 28, 2016

Planning the work and the efficiently organising the plant in order to meet the agreed deadlines;

Day to day management to the site, including monitoring and supervising the site labour force and the work of subcontractors;

Liaising with consultant subcontractors, planners and general workforce involve in the project.

Prepared pipe isometrics, P & ID and piping plan with emphasis to process, economics, and safety of the piping system.

Checked and review construction drawing to reflect actual site arrangement.

Performed material take-off then monitored materials for procurement to ensure designed quantity and material specifications.

In charge of utilities line, steam line from procurement stage, materials take off, fabrication, erection and installation, walk down, punch clearing, pressure test, re instatement up to first firing of Open Cycle and Combine Cycle.

Work preparation and coordination in Desalination Plant, Gas Turbine Generator, HRSG, Steam Turbine Generator

III.PP12 Dhurma Combine Cycle

GS Engineering & Construction–BEMCO Joint Venture (Riyadh, Saudi Arabia)

Piping Engineer

Duration: February 15, 2014 to November 30,2014

Prepared pipe isometrics, P & ID and piping plan with emphasis to process, economics, and safety of the piping system.

Checked and review construction drawing to reflect actual site arrangement.

Performed material take-off then monitored materials for procurement to ensure designed quantity and material specifications.

Prepared engineering standard, and procedures for piping system and static equipment suitable to client and based on applicable..

Mentored team members and monitored workflow and progress to ensure the standards and schedules were met.

Prepare test packages and updating reports, documentation, schedules take-off timetable, presented said reports.

Handled personnel and client queries regarding piping system.

Participated in meetings and discussions with the clients and contractor regarding issues.

Performed duties within guidelines of health and environmental safety.

Monitored contractors to ensure timely and economic performance in accordance with company requirements.

Enforced safety standards and discipline on site, introduced changes whenever necessary, as subtly as possible, to avoid disrupting existing process.

Ability to provide innovative ideas in area of piping design, as well as installation methods and procedures.

Skilled in preparing technical correspondence for clients, clearly and effectively.

Excellent communicator and has the ability to build and maintain good relationship with the costumer.

IV.TOKUYAMA Polycrystalline Silicon Manufacturing Plant Project

Chiyoda Malaysia Sarawak

QA/ QC Inspector

Duration: September 20,2012 – December 20,2013

Witnessing PMC (PRE MECHANICAL COMPLETION) activities including preparation, flushing/blowing and re instatement and Start-up.

Witnessing OATT (Over All Tightness Test) with owner prior to turn over

Verify that the quality related site activities are in accordance with the applicable codes and standards

Participate in the site internal and external site audits

Coordinate all the quality site inspections through the site QC inspectors

Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer

Control all non-conformance reports and undertake remedial action

Compete site quality control instructions and action remedial responses

Review and revised ITP as per clients requirements.

Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.

To monitor and inspection of piping supports as per the isometric and support drawing.

Line check and Preparation of punch listing.

Ensure that all lines have been adequately cleaned, prior to hydro test or placing them in service.

Witnessing for hydro testing and pneumatic testing for above ground piping.

Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.

Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.

Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.

Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.

V. Yanbu II Water & Power Project

Hanwha Engineering and Construction

Piping Engineer

Duration: July 3, 2012 – September 3, 2012

Prepared pipe isometrics, P & ID and piping plan with emphasis to process, economics, and safety of the piping system.

Ability to coordinate and operate a Smart Plan 3D .

Checked and review construction drawing to reflect actual site arrangement.

Performed material take-off then monitored materials for procurement to ensure designed quantity and material specifications.

Prepared engineering standard, and procedures for piping system and static equipment suitable to client and based on applicable.

Review and revised ITP as per clients requirements.

Prepare test packages and updating reports, documentation, schedules take-off timetable, presented said reports.

Handled personnel and client queries regarding piping system.

Participated in meetings and discussions with the clients and contractor regarding issues.

Performed duties within guidelines of health and environmental safety.

Monitored contractors to ensure timely and economic performance in accordance with company requirements.

Enforced safety standards and discipline on site, introduced changes whenever necessary, as subtly as possible, to avoid disrupting existing process.

Ability to provide innovative ideas in area of piping design, as well as installation methods and procedures.

Skilled in preparing technical correspondence for clients, clearly and effectively.

Excellent communicator and has the ability to build and maintain good relationship with the costumer.

Responsible for generating design specifications, overseeing implementation and maintenance procedures of oil and gas pipeline piping.

Handle responsibilities of conducting pipe stress calculations and engineering specifications by using finite element analysis methods, codes and procedures related to engineering functions.

VI.Habshan 5 U & O Project

Hyundai Engineering and Construction

QA / QC Piping and Welding Inspector

Duration May 24, 2011 –May 23, 2012

Review of supplier quality plans against contract requirements

Review procurement documents to ensure that quality requirement have been correctly translated into purchase requisitions and design documents

Review supplier inspection procedures and personnel qualifications

Review supplier material certificate

Coordinate with the companies discipline engineers for the resolution of technical discrepancies

Coordinate with management for quality improvements

Issue of non conformance reports

Track all non conformance reports

Coordinate with the owners representative on all procurement issues

Monitor progress of all purchase requisitions

Implement the QA/QC management system at site

Coordinate with quality inspections with all the site sub contractors and vendors coordinate all non destructive testing on site

Coordinate with the customers representative on all quality matters

Coordinate all receipt inspections

Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.

Witnessing for hydro testing and pneumatic testing for above ground piping.

Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.

Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.

Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.

Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.

Reviewing the PWHT charts cooling rate, heating rate, soaking period according to specification and approving the charts.

VII.Chiyoda - Hyundai Heavy Industries Consortium.

Pearl GTL Project, Ras Laffan Industrial City, Qatar.

QA / QC Piping Inspector

Duration: December 15, 2008 - February 2, 2011

Ensure all quality control documentation is complied and competed for as-built hand over through the QC turnover engineer

Control all non conformance reports and undertake remedial action

Compete site quality control instructions and action remedial responses

Review the customers specification and undertake relevant training to the site QC inspector

Monitor the implementation of the approved site QC Plan

Complete and coordinate the approval of the sites QC technical submittals to the customer

To control the quality and traceability of all manufactured components in accordance with the Company's Management System.

Perform inspection requirements in accordance with the Company's Product Quality Requirements.

Monitor and Inspect fabrication work for compliance with quality requirements as per the Company Quality Control Procedures.

Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.

Witnessing for the bolt tightening procedure for flange as per the method statement.

To monitor and inspection of piping supports as per the isometric and support drawing.

Line check and Preparation of punch listing.

Ensure that all lines have been adequately cleaned, prior to hydro test or placing them in service.

Witnessing for hydro testing and pneumatic testing for above ground piping.

Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.

Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.

Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.

Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.

VIII.IREM Spa

Yanbu Petrochemical (Yansab)

QA /QC Piping Inspector

Duration: March 4,2006-April 13.2007

Responsible for Quality Control activities of Oil & Gas project, piping system, internals, pipelines.

Review all approved documents such as project QCP, ITP, WPS, NDE procedures, etc.

Witnessing for the fit-up inspection and monitoring welding process

Performs inspection of Materials and dimension as per isometric and specification.

Check that flange ratings, bolts & gasket materials and type are in accordance with design drawings and company specifications.

Installation of valves and checking flow direction of check / globe valves.

Check each test package prior to submission to ensure all inspection and NDE activities completed for that particular line by checking certain system generated reports like Line summary sheet, Line NDE status etc.

Checking Hydro test document and reports ensure all punch list have been done and closed prior to testing.

Responsible for witness each Hydro test and Leak Test.

After test, ensures it is performing the flushing, blowing and re-torque.

Visual inspection of welds as per code and specification.

IX. SK(Becthel) SGI/SGP(Kasakhztan)

Piping Enginer

Duration: September 19-November 27 2006

Coordinate with the site construction manager on all quality issues Coordinate and chair the QA/QC site weekly meetings with the projects subcontractors QC personnel

Elaborating inspection and test programs

Ensure the safety is adhered to at site

Assure all technical documents relative to site quality control are current status

Ensures the quality records, acceptance certificates, mechanical completion certificates and the documentation for specific systems and buildings/areas are prepared and collated in accordance with project requirements

Coordinate with the planning and scheduling department to ensure milestone dates are understood for each turn over area

Coordinate with the site QC manager for the completion of as-built turnover documentation

Resolve any discrepancies between the completed milestone and quality documentation

Responsible for Quality Assurance & Quality control activities of Process Plant Piping System fabrication.

X. J-Ray mcdermott Dubai U.A.E.

Olefins Project (Onshore/Offshore)

QA / QC Piping Inspector

Duration: February 16 2005 -July 10,2006

Review suppliers inspection and test plans against the milestone scope of work

Coordinate with the commissioning department to define the scope of work

Assist the site subcontractors to compile turnover dossiers

Provide progress information for incorporation into project reports

Monitor hydrostatic test packs for incorporation into as-built dossiers

Consider the implications of delays in QC as-built turnover documentation and bring to the attention of the site QC manager

Monitor and control the status of punch list and exception lists relevant to quality dossiers

Attend the weekly QA/QC, and commissioning meetings

Coordinate any inconsistencies with test packages.

XI.Drake&Skull International

4Season Hotel (Doha,Qatar)

QA / QC Piping Inspector

Duration: October 16,2002-November 3,2003

Coordinate with management for quality improvements

Issue of non conformance reports

Track all non conformance reports

Coordinate with the owners representative on all procurement issues

Monitor progress of all purchase requisitions

Implement the QA/QC management system at site

Coordinate with quality inspections with all the site sub contractors and vendors coordinate all non destructive testing on site

Coordinate with the customers representative on all quality matters

Coordinate all receipt inspections

Witnessing, Fit-Up inspection of fabricated spools involving all aspects like orientation, material identify, traceability, dimensional accuracy and ensuring the use of latest revision approved drawings.

Witnessing for hydro testing and pneumatic testing for above ground piping.

Following pressure testing, ensure that all valves are completely drained of test fluid and thoroughly dried.

Monitoring the production welding before start, during & after welding to assure that it continues to produce satisfactory results.

Closely monitor the consumable control system, such as baking and holding of low hydrogen type electrodes and filler wires.

Review NDT test results, for clearing of package, witness & preparing hydro test and pneumatic test packages.

Reviewing the PWHT charts cooling rate, heating rate, soaking period according to specification and approving the charts.

Adhere to the company’s safety procedures and policies.

EDUCATION

AMA Computer College 1998 - 2002 College

Computer Engineering

Sta. Cruz Laguna

Linga National High School 1994 – 1998 Secondary

Linga Pila Laguna

Rizal Elementary School 1988 – 1994 Primary

Tayuman Tondo Manila

TRAINING

Confined Space Entry

Dubai UAE

Certificate No. 131697

Certification Date : 22.10.2016

Certificate Validity : 21.10.2018

SOLAS(ESTDC) Abu Dhabi, U.A.E Certificate No. 03217/2005

Issue Date : 28.03.2005

Expiry Date : 27.03.2008

CHARACTER REFERENCES

Rheydelley M. Bolaso

Hyundai Heavy Industries Kuwait

+965-********

Lead Supervisor in

Habshan U & O Project Abu Dhabi UAE

Mirfa Power Plant Abu Dhabi UAE

Nover Libio

GS Engineering & Construction

Dhurma Power Plant Riyadh, KSA

+966*********

Lead Engineer in

Pearl GTL Project Ras Laffan Qatar

PP12 GS Engineering & Construction Riyadh KSA

Roderick Balugay

Nesma and Partner Jubail KSA

+966-*********

Co Inspector in

Chiyoda Malaysia

PERSONAL DETAILS

Date of Birth: 29 January 1981

Present Address: Brgy. Aplaya, Pila, Laguna, Philippines

Mobile: +639*********

Languages Known: English, Tagalog

Marital Status: Married

Nationality: Filipino

Passport Details: Passport Number : EC3189843

Place of Issue : DFA (Manila)

Date of Expired : Jan 14 2020

DECLARATION

I hereby declare that the above-furnished details are true with best of my knowledge and belief.

Rafael Moran Edrozo



Contact this candidate