Reza Hedayat, P.E.
**** ********** **. ******: 562-***-****
Corona, California 92880 E-mail: ac7rq2@r.postjobfree.com
PROFESSIONAL EXPERIENCE
Senior Mechanical Project Manager/Estimator May 2016 to Present
RAE Mechanical/ Construction Management
Senior Mechanical Estimator and Negotiator January 2015 to march 2016
LAX ADG Group
Senior Estimator, Project Manager and Div. Manager March 2011 to November 2014
THE SUN GROUP Costa Mesa CA.
Senior Mechanical Project Manager and Estimator
RAE Mechanical, Covina California August 2007 to January 2011
Senior Mechanical P.M/ Estimator / Operations Manager
Golden Sun Company, Tarzana, California September 1998 to June 2007
Senior project Manager / Operations Manager
Nelson Air Conditioning, City of Industry, California February 1991 to September 1998
Senior Project Manager and estimator
Cal Air Conditioning, Whittier, California July 1986 to February 1991
Significant Projects and Experience
Senior Estimator and PM: Within this tenure, I estimated over 100 mechanical competitive bids and secured (seven) new contracts with over $8M value. Meanwhile, I completed construction of public funding projects with a value of $6M.
Mechanical Estimator II and Negotiator: Preparing mechanical estimates and budgets for different stages of new projects. Duties include: Re-estimates/forensic reviews and the auditing of change orders from contractors. I also negotiated and finalized change orders and forwarded required documents and reports for completion of process.
Senior Estimator: As a Senior Estimator, I was reviewing documents with junior estimators and assigning estimators their roles in preparing take off and collected quotes from vendors and sub-contractors. I prepared final estimates and audited all input data for accuracy of estimates. I personally prepare all change orders and consider the training of estimators an important part of my function.
Estimator and Project Management Experience: Collected all information pertaining to the bidding process; prepared MEP Estimates for competitive bids, including: sheet metal, piping, and plumbing; I participated in bids, negotiated contracts, selected subcontractors, and issued their contracts; issued POs and other purchase contracts; oversaw the preparation of shop drawings and their final approval; prepared submittals; pulled permits; established project priorities and schedules; oversaw the safety precaution of construction sites; coordinated with superintendents and foremen at job sites; issued and tracked RFIs; requested change orders; provided on-site supervision for all trades involved, and closed out documents for projects.
Management and Administration Experience: Responsible for the day-to-day operations of the company’s operation managers.
NOTABLE PROJECTS:
• New Construction HVAC Project Manager:
- Redondo Beach Hilton and Marriott Hotels
-North Redondo Beach Library (LEED project).
-Health Center at Cal State San Bernardino ($1 million project).
-Terminal at Santa Barbara Airport ($1.7 million project). •
-Movie Studios including three live audience studios for CBS/MTM; building remodel and new live stages including all infrastructure work and central planning for Culver Studios. Most these projects included Plumbing Works
-Ice Storage systems and infrastructure work at Sunset Gower Studios ($5 million).
-North Wing of Children’s Hospital of Orange County (CHOC) $6M - OSHPOD
-New central plan, infrastructure, and cogent system for Biola University in La Mirada, CA ($45 million project).
- Biola Universities (3) NE Student Housing, including HVAC and Plumbing
•Remodel Project Manager:
-Over 40 different public funding projects including, Ten Ralph’s Giant supermarkets, Beverly Hills Police Station and Emergency Operations Center.
-Hart High School Remodel (Fast Track Project ($1.3 million).
-Bailey Library at East LA College remodel ($1 million HVAC project).
-Gym and Sports Facility remodel at Chaffey College ($1.3 million HVAC project).
-750 tons Chiller Change out and remodeled central plant at El Camino High School.
•Design and Engineering:
-Design and Build Projects including Metro Point Office Buildings (four and six stories) in Orange County, CA.
-Design and Build HVAC and Plumbing Projects for Home Depot in California including main office in Placentia, CA. and 5 stores.
-Design of DX air conditioning systems for supermarkets including Albertsons and Vons.
-Security Pacific National Bank (SPNB) in Downtown Los Angeles.
-Van Nuys Airport Office Building (over 150,000 sq. ft.).including TI Plumbing works.
Education and Certification
Master of Science - Mechanical Engineering Tehran University MSME
Bachelor of Science – Mechanical Engineering Tehran University B.S.
Engineered Plumbing Design Certification, UCLA
Refrigerant Recovery Systems Certification, SCAQMD
California Contractors License for C-20 (HVAC) Auto CAD 2012 training certificate, Maxwell Estimation Training certificate for HVAC and Mechanical Systems.
Reza Hedayat, P.E.
E-mail: ac7rq2@r.postjobfree.com
Design and Engineering Projects
•Two-story office building in Agoura Hills implementing VVT system for 50,000 square feet.
•Albertsons store in North Las Vegas, NV.
•Albertsons store in Walnut, CA.
•Home Depot store in Placentia, CA. FULL MECHNICAL
•Home Depot store in Oceanside, CA. FULL MECHNICAL
•Home Depot store in City of Industry, CA. FULL MECHNICAL
•Home Depot store in Cerritos, CA FULL MECHNICAL
•Home Depot Offices in Placentia, CA. FULL MECHNICAL
•Vons store in Rancho Penasquitos, CA. FULL MECHNICAL
•Vons Pavilions store in Arcadia, CA.
•Vons Pavilions store in Westminster, CA. MECHNICAL
•Vons Tianguis store in Montebello, CA.
•10 Ralphs Giant (Food for Less) stores in various locations in. LosAngelesCounty
•Value Engineering for 16 schools in Los Angeles Unified School District.
•Value Engineering and re-design of Metro Point six story building, South Coast Plaza in Newport Beach, CA.
•Value Engineering and re-design of Metro Point four story building, South Coast Plaza in Newport Beach, CA.
•Value Engineering for Police Station and Emergency Operations Center in Beverly Hills, CA.
•TI - Security Pacific National Bank - 30,000 sq. ft. high rise building in Downtown Los Angeles (design and construction of three floors). MECHNICAL
•TI - Van Nuys Airport Business Center - 150,000 sq. ft. building. MECHNICAL
•Design of Sav-On Drug store in Walnut, CA.
•Design of Sav-On Drug store in San Fernando Valley, CA.
•Design of prototype energy management system, Vons Grocery stores.
•Design of prototype energy management system, Albertson Grocery stores.
•Design of prototype energy management system, Sav-On Drug stores.
•Design of prototype energy management system, Vons Pavilions stores.