Post Job Free

Resume

Sign in

Engineer Project

Location:
Bangkok, Bangkok Metropolitan Region, Thailand
Salary:
8000
Posted:
November 24, 2018

Contact this candidate

Resume:

Application for RFDesign/Planning Engineer

Name Mr. Thananan Numatti

Address ***/** **, ******* ** T. Ban Ped, A. Muang Khon Kaen 40000, Thailand. Mobile phone +669*-***-****

Email ac7r16@r.postjobfree.com ; ac7r16@r.postjobfree.com ; Skype ID : live:feedback2016_1 LinkedIn https://www.linkedin.com/in/thananan-numatti-128b5130?trk=nav_responsive_tab_profile Birth 19 May 1973.

High 170 Centimeter

Weight 62 Kilograms.

Nationality Thai

Languages Thai, English.

Education -2013-2016 Khon Kaen University: Master of Science Program in Information Technology,

(MSc/MA)

-1998-2001 Sripatum University: Bachelor of Telecommunication Engineering. Bachelor of Engineering in Telecommunication Engineering

-1994-1995 Rajamangala Institute Of Technology TAK Campus: Electronics Diploma CAREER OBJECTIVE

• I am Gain experience and advancement in Mobile Engineering and Management with 17 years. Multi task LTE(TDD,FDD)&UMTS Model Tuning Dimensioning Network TDD FDD LTE,WCDMA/UMTS, CDMA,GSM and RF Planning and Optimization (Ericsson,Huawei& Nokia experience). Educated in Telecommunication Engineering. GSM experience (Huawei, Alcatel, Motorola, Nokia) various tools such as AIRCOM Asset planning, Mantum Cell Planner and Atoll Cell Planning, Actix analyzer, NEMO analyzer, TEMS Discovery, Huawei M2000,DNA&Dicovery(Huawei SmartCare), Nastar,Ericsson Moshell, NetAct RS,OSS counter, PNM web,Initial network about RAN Functionality and Mobility setting.

• Nokia experience equipment 1 year for SRAN 17,AirScale,ASIA,ABIAModule,RRH:Radio Remote Head LTE_FDDTDD,AZNA 4T4R_4x40W B40 etc

SKILL/PERSONAL ATTRIBUTES

• Management team skill

• Working in multi-vendor environments.

• Primarily responsible for overall RF planning, coverage and performance monitoring project.

• Team leader ability to coaching and consult team all levels strong relationship.

• Model Tuning Dimensioning Network,Planning and Optimizaiton TDD&FDD LTE,WCDMA/UMTS, CDMA,GSM, with tools Mentum Cell Planner AIRCOM Asset planning and Atoll (LTETDDFDD,3G,GSM), Actix analyzer,NEMO analyzer, TEMS Discovery, Huawei M2000, DNA&Dicovery(Huawei SmartCare), Nastar,Ericsson Moshell, VOLTE analysis.

• Setting and driving criteria &consolidate pm counter Capacity & Worst cell to improve network.

• Set up milestone for site location SAR (Search Ring) > SAM (Search area Map) >IEA (Initial Effective Accept )>FEA (Final Effective Accept)>TSS(Technical site survey)>Site approve, Call test, CVT(SSOA) & Cross sector report. Approver CVT (SSOA) for evaluate location and identify requirements for system design and RF data engineering collection.

• Experienced in link budget analysis, macro design, small cell offload and design standards, traffic analysis. Understand and apply requirements for multiple operator systems.

• Initial network about RAN Functionality and Mobility setting.

• E2E performance and operation LTE Evolved Packet System (LTE EPS), SRVCC and VoLTE Performance

• Excel VB Macro, Access database, SQL and Microsoft office.

• Lead RAN part for the QOS Project E2E

• Swap project LTE&UMTS&GSM

WORK EXPERIENCE:

June 2015 – Present; Position: RF Manager (RAN Architecture, Radio Access Network Department)

– 2 –

Company: DTAC (Thailand) Telenor Group at Bangkok Office Chamchuri Square Tower Responsible:

•4G: LTETDD2300MHz,LTEFDD2100&1800Mhz and 3G UMTS 2100Mhz&U850Mhz

-Network Planning for Coverage Expansion Investment and phase improvement 3G&LTE

(TDD2300,LTE1800, LTE2100, U850, U2100) prediction, Model tuning by AIRCOM Asset planning and Atoll Cell Planning (calculate base on population cop dimensioning coverage, pop area coverage) & IoTLTEWCDMA Link Budget,Set up process SAR,Site Information and Site Engineering parameter (Create Cell Design Data (CDD), Prepare cell configuration data (Naming convention, EARFCN, PCI, RACH root sequence, TAC, Neighbor, Inter-working, baseline parameters, power levels. Get raw data from ENIQ

&PRSM2000 to forecast network,(Nokia,Ericsson equipment)

-Network Capacity &utilization LTE&3G criteria &consolidate recommend and fixing those problems

(PBR,PDCCH PUCCH, Connected User License(CUL),usage, dimensioning capacity, feature trail ANR, CRS power gain, IFBL, IFO, pdcchCfiMode, PucchSrUsers, PucchCqiUsers, etc) from NetAct RS,OSS counter, PNM web,ENIQ and PRS,etc, (Nokia,Ericsson &Huawei equipment), Physical upgrade add sector, dual beam antenna, tri beam antenna)

-Network Worst cell LTE&3G criteria &consolidate recommend and fixing those problems (PS&CS CDR, PS&CS CSSR, Inter-Freq, IRAT, S1Sig Fail, VoLTE CDR, CSFB,SRVCC HO, DL/UL Throughput etc),VOLTE analysis and improvement with feature L16B (Ericsson equipment)

-Network Readiness (Evolution) planning base on traffic area to criteria upgrades existing site and new site propose to the fixed those problems, New site primarily responsible for establishing, monitoring of TDDFDDLTE&3G war room recommend and fixing those problems (LTE&3G Low traffic, UL RSSI, IRAT, S1Sig Fail, SSOA tracking, Verify UL RSSI Ericsson equipment)

-TDD2300MHz Roll out RAN initial& mobility parameter DTAC stagey

-QoS project deployment to the mapping RAN network parameter to the core network

-LTE&WCDMA _HLD&LLD swap project (Nokia to Huawei ) right to right parameter + feature 1year Nov 2014 – May 2015 ; Position: Senior RF&Optimization Engineer Consultant Company: Huawei technologies (Thailand). AIS One Stop Project Roll out Responsible:

•3G:WCDMA 2100Mhz : RF &Optimization

-RF cluster roll out physical and parameter tuning from M2000, PRS (New site & Small cell offload).

-Phase improvement by Dual beam antenna to physical and parameter tuning from M2000, PRS base on cell high utilization.

Aug 2014 – Oct 2014 ; Position: Senior RF&Optimization Engineer Consultant Company: Ericsson (Thailand).Multi vendors Optimization DTAC Project Responsible:

•4G: L2100&L1800Mhz and 3G UMTS 2100Mhz&U850Mhz

– 3 –

- Network Planning for Coverage Expansion Investment and phase improvement 3G&LTE (L1800, L2100, U850, U2100) prediction by AIRCOM Asset planning (calculate POP cop dimensioning coverage ),Set up process SAR,Site Information and Site Engineering parameter. Get raw data from ENIQ&PRSM2000 to forecast network.(Ericsson &Huawei equipment)

Nov 2013 – July 2014 ; Position: Senior RF&Optimization Engineer Consultant Company: Huawei technologies (Thailand). Multi vendors Optimization DTAC Project Responsible:

•3G :WCDMA 850&2100MHz

-Analysis& investigate: Maintain main KPIs (CS&PS CSSR, CS&PS CDR, Ps-Cong, cell re-selection,Inter freq,IRAT),from M2000&PRS, Support Customer complaint (IM)

-Improvement: 3G&GSM1800: Optimization best serving, dimensioning coverage and resource, Recommend and fixing those problems, Event Support.

•2G :GSM 1800 MHz :

-Analysis& investigate: Maintain main KPIs(CSSR, CDR, HOSR,EDGE throughput) from M2000&PRS,Support Customer complaint (IM).

Optimization best serving,dimensioning coverage and resource, Recommend and fixing those problems, Event Support.

May 2012 – Oct 2013 ; Position: Team Lead RF&Optimization Engineer Consultant Company: UbiNS (Thailand). BFKT&TRUEMOVE Northeast Roll out Project Responsible:

•3G:850 MHz

-Optimization: Pre-Launch, Launch, Post Launch: Phase 3,4 (Huawei equipment)

-Analysis& investigate: Maintain main KPIs from M2000& Nastar (CS&PS CSSR,CS&PS CDR,Ps- Cong,cell re-selection,Inter freq,IRAT),Event Support.

-Ph 3,4 Pre-Launch,Launch,Post Launch: Generate Worst cell, Black Gay White cell from OSS KPIs by OmSTAR, Recommend for customer changes to fixing those problems, Weekly report.

-Provisioning Acceptance Report DT&OSS.

Jan 2006–April 2012 ; Position: Team Lead RF Planning Optimization Engineer Company: TRUEMOVE, Northeast region (Thailand)

Responsible:

•3G:850MHz (2009-2012) Roll out Huawei equipment (Phase2,3,4)

-2G &3G Network planning: Milestone SAR (Search Ring) > SAM (Search area Map) >IEA (Initial Effective Accept )>FEA (Final Effective Accept)>TSS (Technical site survey)>Site approve, Site Engineering parameter, Call test, CVT(SSOA) & Cross sector report. Approver CVT (SSOA) 3G&2G drive test route acceptance,3G Benchmark report. Prediction by AIRCOM Asset planning tools, Get raw data from M2000 to the forecast network.

-3G Cluster owner analysis result drive test for Pre-Launch,Launch,Post-Launch recommend to those problems (CS&PS CSSR,CS&PS CDR,Ps-Cong,cell re-selection,Inter freq,IRAT) from M2000 and Nastar.

-3G RF prepare Database (URA,LAC,CI,SAC,RAC,GAN, NodeB ID, Adjacent Node ID).

– 4 –

-3G Analysis& investigate: Maintain main KPIs from M2000& Nastar (CS&PS CSSR,CS&PS CDR,Ps-Cong,cell re-selection,Inter freq,IRAT),Event Support

•2G:GSM1800MHz(2006-2012) RF& Optimization performance (Motorola& Alcatel)

-GSM Data base: New site (Abis mapping, carrier& cell info, Freq& NB list)

-GSM parameter and planning upgrade& downgrade TRX by GOS 5% and plan frequency BCCH&TCH, physical upgrade add sector, double antenna)

-Lead swap GSM project: Swap out Motorola to swap in new Alcatel equipment.

-Monitoring statistics and worst cell: Main KPIs such as CCR,CDR,CSSR,HOSR, from OMC-R reflection X (Alcatel & Motorola).

-Lead improvement project: AFP&ACP major retune BSIC, Frequency, Hopping sequence number for drop call rate, radio link time out.

Aug 2002 – Dec 2005 ; Position: RF & Implementation Engineer Company: United Telecom Sales &Services(UTELL) (Thailand) Responsible:

• June 2003– Dec 2005: GIS (Geographic Information System) CAT network Project.

-Trainer Small World PNI&LNI (Physical & Logical Network) and Operation NMS SDH,PDH,ATM.

-Inside plant network (NMS SDH,ATM)

•Aug 2002– May 2003

-RF designed with DTAC IBC-100 project (Nokia equipment) June2001 – July 2002 ; Position: Baseband Engineer Company: SHIN SATELLITE (Thaicom Teleport and DTH Center) (Thailand) Responsible:

•OMC operation DTH TV network Thaicom Satellite.

TRAINING COURSES

Undergone training in the following courses conducted by DTAC

• DTAC &NOKIA : Nokia 5G Planning workshop (Webex remote session)

• DTAC &Ericsson : LTE L16 Radio Network Functionality

• DTAC &Ericsson : Voice over LTE e2e Realization and RAN Functionality

• DTAC Academy : IP V6 Transformation

• DTAC &Ericsson : L16B feature Course (LTE&3G)

• DTAC &Huawei : Discovery (Huawei SmartCare)

• DTAC &Ericsson : LTE Performance Management and Optimization Course

• DTAC &Ericsson : LTE L14 INITIAL TUNING Course

• DTAC &Ericsson : LTE L14 RADIO NETWORK FUNCTIONALITY Course

• DTAC &Ericsson : LTE L14 PROTOCOLS AND PROCEDURES Course

• DTAC &Ericsson : LTE L14 AIR INTERFACE 1 Course

• DTAC &Ericsson : VoLTE Concepts Course

• DTAC &Huawei :Data Service Quality Improvement training (DNA) Undergone training in the following courses conducted by TRUEMOVE

•TRUE BFKT 3GUTRAN Training Course: WCDMA RAN13/Single RAN 6.0 RNC Operation

•TRUE BFKT 3GUTRAN Training Course: WCDMA RAN13/SingleRAN 6.0 Advanced

•TRUE BFKT 3GUTRAN WCDMA HSPA Radio Network Planning& Optimization

•TRUE BFKT 3GUTRAN WCDMA RAN12 Radio Network Feature& Algorithms

•TRUE BFKT 3GUTRAN WCDMA Radio Network Design and Planning

•TRUE BFKT 3GUTRAN WCDMA: Huawei 3G training (Batch 1, Batch 2 and Batch 3)

• Basic and Advance UMTS Optimization Training Optimi Corporation

• Aircom Launch 3G Optimization Workshop part II and Knowledge Transfer Part I

– 5 –

• People Manager and Core Skill for leadership

Undergone training in the following courses conducted by TRUEMOVE &Alcatel Training (Swap Project)

•Mobile Network Alcatel Lucent 9130 MFS&BSC Evolution Description inB10

•Evolium 9125,9100 BTS,BSC/TC Description and B8-B9 Evolution for OMC-R Alcatel Undergone training in the following courses conducted by TRUEMOVE &Motorola Training

•GSR 4,6 and 8 BSS Database• SYS02: Introduction to BSS Database and SYS03: Advance BSS Database Undergone training in the following courses conducted by United Telecom Sales &Services(UTEL) Training

•CDMA by Qualcomm, DTAC Site Auditor 2005,Program Small World for GIS (GE) Undergone training in the following courses conducted by SHIN SATELLITE Training

•Thaicom Customer Training: Shin Satellite Karai Earth Station SPECIAL QUALIFICATIONS:

- Good command in English

- Excellent interpersonal, communication and presentation skill

- Strength is leadership, initiative, and hardworking, enthusiastic, analytical and interpersonal skills.

- Able to work in over sea.

COMPUTER:

• DNA&Dicovery (Huawei SmartCare), MapInfo, AIRCOM asset planning tools, Mentum CellPlanner, Atoll Cell Planning, ENIQ &MOSHELL, SIMON, IRIS tools, HuaweiM2000, PRS, GENEX NASTAR& OmSTAR, OMC-R MOTOROLA& ALCATEL, Aexio Xeus 2013 R2,OPNET14.5, TEMS Discovery 4.0.13, Actix Analysis, NEMO analyzer, Spectrum analyzer

• MS Office and Visio, VBA, MS Office Access Database, REFERENCE

• Nadir Ouagued (Spanish) : Senior Solution Architect, Network Design & Optimization, Ericsson (Spain) Ltd. Mobile Spain +34-657******

Mobile Thailand +66-945******, email: ac7r16@r.postjobfree.com address BNES GSO GCD RAN ES RAN 1,Calle Retama, 1 Planta 12?,28045 MADRID, SPAIN,Mobile Spain

+34-657******,Mobile Thailand +66-945******

• David Smith : Senior Solution Architect, Network Design & Optimization, Ericsson (Thailand) Ltd. Mobile:

+66-95-423-****, email: ac7r16@r.postjobfree.com

• Atinan Tumsatan : AVP, Head of Radio Architecture and Solution Unit, Radio Access Network Department

(DTAC.co.th);Telephone: +66-85-111-**** ;Email : ac7r16@r.postjobfree.com

• Mr Jakkrit Krantsiri ; Project Managements (Huawei Thailand) ;TMV project Northeast region Telephone:

+668*-***-**** ;Email : ac7r16@r.postjobfree.com

• Eugene Choi ; Technical Director (UbiNS Philippines) Telephone: +82-10-985*-**** ; 070 : +82-70-8749- 4665 ;Email : ac7r16@r.postjobfree.com ; ac7r16@r.postjobfree.com

– 6 –

MISCELLANEOUS WORK EXPERIENCE

- TDDLTE2300MHz Network Planning for Coverage Expansion

– 7 –

- LTE Network Capacity &utilization LTE&3G criteria &consolidate recommend and fixing those problems

– 8 –

- QoS LTE&3G set up and &consolidate recommend and fixing those problems



Contact this candidate