Highly effective Civil Project/Office Engineer with an MBA committed to achieving project success by taking initiative, anticipating and avoiding problems before they arise by performing due diligence and applying best practices in a clear and transparent manner. OFFICE ENGINEER – BIDWELL ENVIRONMENTAL 2018 TO PRESENT SCDPW – CP8108 Bergen Point Wastewater Treatment Plant – Outfall Replacement Tunnel

$187M – Launch/Receiving Shafts, Tunneling by TBM

Maintained Submittal, RFI, Correspondence, Daily Work Reports, Contractor Daily Attendance Reports, Payment Application Packages, Certified Payroll Review logs using Submittal Exchange software program.

Reviewed and prepared Contractor Progress Payment Applications.

Reviewed and verified Contractor and Subcontractor Certified Payrolls.

Performed weekly SPDES Inspections at (2) locations. Authored and published SPDES Inspection Reports.

Authored and published Progress Meeting Agenda and Minutes on a bi-weekly basis.

Participated in the review of Construction Work Plans. OFFICE ENGINEER – HAIDER ENGINEERING 2015 TO 2018

NYCDDC HWP15XMCL & HWP15XMTA – Construction of Pedestrian Ramps -10M

Created and maintained submittal and correspondence logs.

Reviewed Daily Inspector’s Reports and processed work items for Contractor Payment using PIMS software.

Monitored project budget and schedule. Performed Overrun and underrun analysis.

Evaluated Material Acceptance documentation.

Published Progress Meeting and Utility Coordination Meeting minutes.

Developed Change Orders in PIMS. Reviewed Contractor proposals.

Prepared Monthly Progress Reports.

NYSDOT Scour Critical Bridges Phase II $23M – Replaced stone riprap around various Bridge piers and abutments.

Created and maintained submittal and correspondence logs in accordance with MURK standards.

Reviewed Daily Work Reports in Site Manager for accuracy. Reviewed submittals using ADOBE Acrobat.

Evaluated and processed monthly Contractor payments using Site Manager software program.

Monitored project budget and schedule. Performed Overrun and underrun analysis.

Evaluated Material Acceptance documentation.

Published Progress Meeting and Utility Coordination Meeting minutes.

Developed Change Orders in Site Manager. Reviewed Contractor proposals.

Prepared project related correspondence.

BARBARA WARREN

516-***-**** • ac7qm4@r.postjobfree.com

PROFESSIONAL EXPERIENCE

2

Administered M/W/DBE Program for compliance.

Evaluated Certified Payrolls for Prevailing Wage Compliance. OFFICE ENGINEER – BOWNE GROUP AE & T 2014-2015

Nassau County DPW West Shore Road Seawall Rehabilitation Project $10M

Created and maintained submittal and correspondence logs in accordance with MURK standards.

Reviewed Daily Work Reports for accuracy.

Processed monthly Contractor payments using CEES software program with NYSDOT pay items.

Monitored project budget and schedule.

Evaluated Material Acceptance documentation.

Published Progress Meeting and Utility Coordination Meeting minutes.

Prepared project related correspondence.

PROJECT/OFFICE ENGINEER – LONGI ENGINEERING 2009-2013 MTA/LIRR East Side Access Project $6B

Reviewed contractor’s submittal list to ensure submittals are submitted as planned to allow enough review time prior to performance of work.

Maintained Submittal, RFI, FCR, NCR and DR logs and related tracking systems in conjunction with Project Engineer and Lead Quality Engineer using Expedition and SKIRE software programs.

Tracked submittal review performance by the design professionals (GEC) and outside stakeholders, including railroads (MNR, LIRR, AMTRAK).

Assisted Deputy CM in researching construction issues and claims (NOC). Developed responding correspondence to the Contractor.

Maintained payment summary logs.

Assisted in weekly and monthly reporting. Wrote and distributed meeting minutes.

Coordinated with Lead Inspector and Project Engineer regarding field office drawing controls, including assurance that contract drawing sets and as-built record drawings are current.

Assisted Contract Administrator to develop, review, and analyze documentation required for contract modifications.

In conjunction with Project Engineer ensured submittals are complete and in accordance with Contract Specifications before sending for review by GEC and/or others.

Code Compliance – Ensured Contractor performed required special inspections necessary for project close out.

Obtained Subcontractor Approval by applying due diligence methods.

Registered Subcontractors with OCIP program.

OFFICE ENGINEER – HAKS ENGINEERS 2001-2005

NYCDDC Roadway Reconstruction Projects – Manhattan Avenue, Greenpoint Brooklyn and Bayridge Avenue, Bayridge Brooklyn – Replaced watermain, sewer, curb, sidewalk, roadway deck and asphalt.

Maintained RFI, FCR, NCR and DR logs.

Assisted Resident Engineer in researching construction issues and claims. Assisted in estimating additional construction costs. Developed and issued Change Orders.

Performed Contractor monthly payment based on physical quantities. Tracked over/under budget concerns.

Assisted in weekly and monthly reporting. Wrote and distributed meeting minutes.

Developed water main as- built drawings and Tap Cards using VISIO software. 3

QUALITY ENGINEER – PORT AUTHORITY NYNJ 1998-2000

Performed waterfront and building structural inspections at the Ports of Elizabeth and Newark.

Performed building inspections as JFK, LaGuardia and Newark Airports.

Published inspection reports.

Made recommendations to senior staff based upon structural inspections. PROJECT OFFICER – NYC SCHOOL CONSTRUCTION AUTHORITY 1996-1997

Provided General Contractor oversight as the Owner’s Representative.

Performed Contractor monthly payment based on percentage complete.

Interfaced with the Architect of record regarding required submittals.

Arranged for the FID inspections to be performed to ensure obtaining COO.

Coordinated construction activities between the GC and the school Principal and supporting staff.

PROJECT ENGINEER - CON ED - FOSSIL POWER CAPITAL CONSTRUCTION 1990-1995

Flood Protection Program – Designed and implemented flood controls to protect essential generating equipment.

Waterfront Program – Inspected, evaluated, generated contract documents to repair bulkheads, intake and outfall structures.

Fire Damage – Inspected, evaluated, generated contract documents to repair or built new all structures damaged by fire.

Cathodic Protection – Inspected and evaluated all underground metal oil/gas storage tanks and installed cathodic protection systems.

Developed RFP and project documents including specifications and drawings.

Provided consultant oversight.

Master of Business Administration ADELPHI UNIVERSITY Bachelor of Science, Civil Engineering MANHATTAN COLLEGE OSHA 10 NYS EIT

MS Office

Visio

Primavera/Expedition SKIRE

CEES Site Manager

PIMS Submittal Exchange

EDUCATION

ADDITIONAL SKILLS