Resume

Sign in

Power Plant Manager

Location:
Ludhiana, Punjab region, India
Posted:
November 12, 2018

Contact this candidate

Resume:

SUBBA RAO KURAGANTI

K.Subba Rao B.Tech (Mech)

Mobile: +917*********

+919*********

Experience:19years email:ac7n97@r.postjobfree.com Canada reference: Mr.William D Virgin - Brampton, mobile: 416-***-**** Sector: Project execution, Power plant.O&M, erection. Manager/O&M /Power Plant

1 PROFILE: 19 years career experience in thermal/Biomass power plants. Particularly in power plant operations and maintenance, systems safety, troubleshooting and erection.

● Experience in Operation & maintenance of power plant TG, boiler and its auxiliaries.

● 03 years Experience as a site in charge erection commissioning, overhauling.

● 06 years Experience as a shift in charge for operation and maintenance of biomass power plant.

● 10 years experience as a plant manager for operation & maintenance of power plant.

● Knowledge in water treatment of both RO and DM plants.

● Adept at implementing systems and procedures to reduce rejection levels and ensure compliance with the industrial quality standards.

● Familiar with AFBC High Pressure Water Tube Boilers and fuel handling system.

● Familiar with Extraction Turbines in cogen power plants.

● Operation & Maintenance of Utilities including Condenser, Condensate extraction pumps, Air Compressors & its system, High pressure feed water pumps, Fans. Raw Water System and entire Works Steam Circuit.

● A team leader of 80 members, strategist with skills in team building, organization building capability and proven abilities in planning and managing resources. EXPERIENCE

Present Working:- From 2010 May as a Sr. manager and from 2010 for 31.5MW (2 x 15.75 MW, 2 x 67 TPH high pressure Boilers ) Power plant at Lakshmi Energy and Foods Ltd, Khamanon, Punjab near Chandigarh-Ludhiana Highway. Oct 2009-Apr 2010:- Worked as a manager for 46 MW (2x23MW) thermalplant.at BANSWARA with OEG group Chennai, India.

Nov2008-Sep 2009: As a Plant Head with M/s Triveni Engineering &Industries.Ltd, Bangalore, O&M Division for the project of 8.0MW at Sri Rajasthan Texchem-Dungarpur, Rajasthan.

August 2007 - Oct 2008 : As a Resident Manager for the execution of STG, Condenser, pipe lines erection with M/S Brothers Engineering and Erectors Limited- Vijayawada under M/S BHEL. November 2006 – July 2007:As a Site In charge, Toyodenkey Power Systems, Bangalore, Karnataka

July 2005 – November 2006:As Shift In charge, Balaji Bio-mass Power Project, Cuddapah, Andhra Pradesh

August 2001 – June 2005: As Shift In charge, Satyakala Power Project, Vijayawada, Andhra Pradesh

April 1999 – July 2001: As Shift In charge, Gayatri Agro Power Industry Limited, Suryapet, Andhra Pradesh

April 1998 – March 1999: As Site In charge for Overhauling of Steam and Gas turbines with Vasavi Engineering works, Vijayawada

Handled various projects during the interim

● 210 MW Thermal Power Project, NTPC – Nasik, Maharashtra

● 53 MW Gas Turbine, GVK Power Project, Rajahmundry, Andhra Pradesh

● 30 MW Gas Turbine, GTPS Vijjeswaram, East Godavari, Andhra Pradesh

● Compressors at CRL – Cochin, Kerala

EDUCATION&Personel Details

Education: BTech Mechanical engineering with specialization in Industrial Production, Nagarjuna University, Andhra Pradesh.

Date of birth: 05-08-1975

Marital status: Married

Spouse name: Archana kuraganti

Children: 02

Languages known: English, Hindi&Telugu

Pass port validity : August 2028

Responsibilities:-

● Responsibility for the operation of the plant with existing team to reach the PLF within the optimum levels.

● Preparation of Daily and Monthly reports and discussions with the plant head regarding the necessary planning to run the plant with Maximum efficiency.

● Handling shift operations by giving instructions to shift engineers for smooth trouble free operations.

● Planning for preventive and daily maintenance schedules and requirements for brake down and shut down jobs.

● Meetings with procurement departments for the availability of spares to reduce the delay time.

● Led and successfully managed a team of up to 100 members with Engineers, technicians and skilled operators for the smooth operation of plant.

● Driving the project aggressively to meet the timelines of the Project Schedule in erection.

● Key role in execution of the project before target dates and there by initiating the operations within the time to manage the project expenses with in optimum level. Ambition:- To work and settel in Canada

I can do with my best in any offered position.

Thanking you

Subbarao



Contact this candidate