Post Job Free

Resume

Sign in

Engineer Chemical Engineering

Location:
Tronoh, Perak, Malaysia
Posted:
November 08, 2018

Contact this candidate

Resume:

MOHD HAIQAL B HASHIM

Bandar Sri Iskandar, Perak, Malaysia

+601*-*******;

ac7m7h@r.postjobfree.com;

www.linkedin.com/in/haiqal-hashim;

Career Summary

After graduation, started first career with PETRONAS Gas Berhad as a Plant Shift Supervisor. Main tasks were supervised production line, manage plant startup / shutdown and preparing safe worksite for maintenance job. After that, started second career with PETROFAC Malaysia Limited as a Drilling & Completion Engineer. Main task at the beginning is to assist Material Coordinator and Drilling Supervisor in managing drilling activities on the rig. Then, assigned to manage two water injectors well completion. Main tasks included design completion string, prepared completion program, troubleshooting, equipment inspection and well-site supervision. After that, became Drilling Data QA/QC Engineer with Eftech Drilling Solutions and Halliburton as a Drilling Data QA / QC Engineer. The task is to inspect Daily Drilling Report (DDR) and well data in Landmark’s Openwell then make necessary adjustment towards the data as per PETRONAS’s standard for DDR. Currently, working as a Research Officer in UTP under the project “Game Changing Well Technology using Electromagnet”. Technical proficiency in Landmark’s Openwell, Landmark’s Compass and Microsoft Office.

Other Core Competencies include:

Project Management

Cost Estimation

Well-Site Supervision

Quality Assurance/Control

Well Engineering

Operational Logistics

PROFESSIONAL E X PERIENCE

Universiti Teknologi PETRONAS, Malaysia March 2018 – Now Research Officer

Project name:

Game Changing Well Technology using Electromagnet under Petroleum Research Fund (PRF) grant. Responsibilities:

Conduct EOR experiment using Nano fluid with and without electromagnetic.

Calculate the oil recovery factor and make comparison between secondary recovery and tertiary recovery.

Attend workshops and other meetings as necessary for progress update. EFTECH DRILLING SOLUTIONS SDN. BHD, Malaysia October 2016 – January 2017 HALLIBURTON ENERGY SERVICES, Malaysia October 2015 – December 2015 Drilling Data QA / QC Engineer (Contract)

Under PETRONAS Group Technical Data 2016 – Drilling Data QA/QC project, assigned to inspect wells data such as activity codes, hole section, day from spud (DFS), day on location (DOL), and well survey in Landmark’s Openwell with actual Daily Drilling Reports (DDRs) from 2014 - 2016 wells according to PETRONAS’s Standard. Key Achievements:

Delivered reliable wells data within 3 months as per contract to PETRONAS. PETROFAC Malaysia Limited, Malaysia April 2013 – September 2015 Drilling & Completion Engineer

Project name:

West Desaru Development Drilling Campaign, Cendor Development Drilling Campaign, East Cendor Graben Appraisal Drilling Campaign.

MOHD HAIQAL HASHIM

Page Two of Two

Responsibilities:

Designed well completion string and prepared completion programs for highly deviated well (60o to 75o angle). Coordinated activities, equipment and manpower during completion phase.

Troubleshot completion related problems. Inspected Service Company’s equipment at supply base to ensure everything was prepared prior to well completion.

Monitored daily expenditure, operation, and report, manpower and logistic movement.

Monitored and tracked actual daily drilling progress versus plan and tracked daily drilling operation cost.

Monitor offshore operation including drilling, casing running, cementing, wellhead installation, bit grading, torque & drag, BHA configuration, bulk consumption.

Initiated unplanned events report for NPT and provided initial analysis based on site investigation.

Created final well report for every well completed.

Supervised and monitored Formation Integrity Test/Leak off Test, BOP test and cement job with Drilling Supervisor.

Key Achievements:

Completed water injector well projects two days ahead of AFE (Authority for Expenditures) with zero HSE related issues, resulting in cost saving of USD $2M.

Introduced choke opening control in underbalance displacement procedure to maintain bottom hole pressure

(BHP) during Wellbore Cleanout (WBCO) and prevent rapid reduction in BHP which can cause potential hydrocarbon ingress to casing string.

Presented a paper, "Implementation of eRED Plug to Replace Slickline Operation", during Completion Workshop, 2015 in Kuala Lumpur Convention Centre.

Proposed Barite Recovery Mode for running centrifuge to reduce chemicals consumption by 30%.

Suggested using Rheology Modifier in drilling mud to improve gel strength and increased low shear rheology for better hole cleaning and cuttings transportation. PETRONAS Gas Berhad, Malaysia March 2011 – March 2013 Shift Supervisor

Supervised production line operation. Coordinated production startups, shutdowns, and changeovers. Met shift production goals. Made necessary adjustments during shift to produce product within specifications. Key Achievements

Successfully obtained certification of quality standard ISO 9001 for two consecutive years.

Achieved Zero Lost Time Injury (LTI) of 9 million hours EDUCATION & TRAINING

Bachelor of Chemical Engineering in Process Engineering, Universiti Teknologi Petronas CGPA: 3.24 ~ Dean’s List 2010

Training

1) Basic Offshore Safety Induction and Emergency Training (BOSIET); 2) Offshore Drilling and Activities by TOTAL Professeur Associes; 3) IWCF Level 1

REFERENCES

Imros Kinif

Drilling & Workover Engineer

Kuwait Oil Company

+601*-*******

ac7m7h@r.postjobfree.com

Farid Tarmizi

QA/QC Drilling Data Specialist

EFTECH DRILLING SOLUTIONS SDN. BHD.

+601*-*******

ac7m7h@r.postjobfree.com

Nor Idham Che Ghani

Program Director,

GLE Energy Sdn. Bhd

+601*-*******

ac7m7h@r.postjobfree.com



Contact this candidate