Post Job Free

Resume

Sign in

Project Design

Location:
Okeechobee, FL
Posted:
October 29, 2018

Contact this candidate

Resume:

...continued...

THOMAS MILNER

**** ** **** *** **********, Fl 34974

ac7jli@r.postjobfree.com • 405-***-****

PROJECT ARCHITECTURE, MANAGEMENT AND CONSTRUCTION ADMINISTRATION Exceptionally dedicated, detail-oriented manager with more than 30 years of progressively responsible experience directing all phases of high-quality construction projects including design, construction, and delivery. Motivated, priority driven, results-focused leader with extensive hands on technical and procedural experience on both the design and construction sides. Training, coaching, mentoring, supervising, evaluating and extracting performance, productivity and efficiency while maintaining costs and schedule from all project participants. Proven track record of delivering multimillion-dollar projects on time and within budget while meeting or exceeding client objectives. Solid history of success in maintaining close attention to project needs, demands, and problems while developing and implementing creative timely solutions. Areas of Expertise:

Project Management and Administration

Team Leadership, Leadership within the Team

Quality Construction Development

Bidding and Scope Definition

Document Production Coordination

Process, Planning and Documentation

Budget Administration and Cost Management

Quality Control (QC) / Quality Assurance (QA)

Problem Identification and Resolution

Client and Stakeholder Relationships

PROFESSIONAL EXPERIENCE

GSB ARCHITECTS – OKLAHOMA CITY, ORLANDO, FL

ON-SITE ARCHITECTS REPRESENTATIVE (1/2016 TO 5/17) for Walt Disney’s Wilderness lodge Renovation

REVIEWED SUBMITTALS, MANAGED RFI PROCESS INCLUDING RESPONSE REVIEW. REVIEWED AND ISSUED DOCUMENT CHANGES AND FIELD ISSUED SKETCHES. PARTICIPATED IN MONTHLY MEETINGS WITH THE BUILDING DEPARTMENT. CONSTANT INTERACTION WITH THE CONSTRUCTION TEAM AND THE OWNERSHIP TEAM. THIS WAS A POLY-PARTY AGREEMENT PROJECT.

URS/TPS – FORT LAUDERDALE, FL

SCHOOL BOARD BROWARD COUNTY, FL BUILDING PROGRAM

DESIGN MANAGER 3/2014-12/2016

REVIEWED AND APPROVED ALL DESIGN WORK AND SHOP DRAWINGS. RE-WROTE MULTIPLE PROFESSIONAL SERVICE CONTRACTS, CONSTRUCTION CONTRACTS. RE-WROTE GENERAL CONDITIONS FOR BID AND DESIGN BUILD CONTRACTS. RE-WROTE NUMEROUS DIVISION 0 AND DIVISION 1 SPECIFICATIONS WEEKLY BUILDING DEPARTMENT STATUS AND ISSUE REVIEW. GEORGE TENSNG ENGINEERS – MIAMI, FL

DESIGN CONSULTANT 9/2013 – 2/2014

Design build proposal for 20,000 seat ballpark

Developed ballpark design

JOHN HOLLINS CONTRACTOR – AUSTRALIA

DESIGN AND CONSTRUCTION CONSULTANT (7/2013 – 9/2013) Design build proposal for 60,000 seat stadium

Identified and addressed constructability issues. Wrote several sections for the Proposal relative to the specific criteria of the Owners Design Criteria.

THOMAS MILNER Page 2

MARLINS BALLPARK DEVELOPER – Miami, FL

Design and Construction Consultant (10/2012 to 7/2013 Develop concepts and details for new project developments while resolving design and construction issues. Review change order proposals covering scope, entitlements, and costs. Monitor subcontractor closeout process. POPULOUS GROUP ARCHITECTS – Kansas City, MO

Onsite Construction Administrator / Project Coordinator and Architect (5/2003 to 10/2012) Oversaw and monitored construction process, progress, and needs while identifying issues and resolving problems. Managed and represented cooperative efforts of design teams on all project matters while coordinating extensively with developer, design, and construction teams. Established design team work priorities to ensure timely implementation of critical construction decisions. Prioritized contractor issues, RFI’s, and submittal reviews based on construction and schedule status. Evaluated and presented all design changes (ASI’s) to developers for approval prior to submission to contractors. Tracked, scheduled, generated, and issued Field Issued Sketch Issues

(FISK’s). Participated in subcontractor preconstruction meetings. Analyzed and tracked contractor and subcontractor change order proposals for entitlement, scope, and cost. Reviewed and provided recommendations for contractors’ monthly applications for payment. Supervised all on-site design team efforts including Punch List effort. Managed all disputed items to resolution or closure. Participated in early and ongoing Value Engineering and Cost Compromise efforts. Attended weekly high-level construction and design review status meetings. Offered design solution options to owners and developers in response to questions and concerns. Have performed as project architect for design phase from schematic design through design development in AutoCAD. Served as Project MEP Coordinator leading all mechanical, plumbing, electrical, and AV consultant work. Functioned as on-site Bridging Architect Site Representative. Selected Projects and Accomplishments:

Miami Marlins Ballpark: $545+ million project for a major league baseball park.

New York Mets Ballpark – Citifield: $750+ million project for a major league baseball park.

St. Louis Cardinals Ballpark – Busch Stadium: $395+ million project for a major league baseball park.

Consistently met or exceeded project needs and requirements while achieving or surpassing client time, cost, and quality objectives.

ATKINS-BENHAM GROUP – Oklahoma City, OK

Senior Project Architect (8/2001 to 5/2003)

Expertly provided all phases of project architecture from client input, programming, and concept design through document production, coordination, and project completion. Frequently served as Lead Project Architect and offered initial and ongoing training, mentoring, and supervision of team members. Oversaw and participated in facility layouts, equipment and manufacturing coordination. Selected Projects:

Cavalier Air Station Housing, ND; Fort Leonard Wood Dining Hall, MO; FAA Reroute Facility, OK; FAA Wellness Center Remodel, OK; Oklahoma Diagnostic Center, OK.

Pacific Command Headquarters, HI; Naval Intelligence Facility, Rome, NY; Aircraft Hangar Expansion and Door Modifications; Overhead Crane for Aircraft Maintenance Facility. TAYLOR SCOTT ARCHITECTS – Tulsa, OK

Senior Project Architect (11/1999 to 8/2001)

Responsible for production and process management, project quality and scheduling control, and problem identification and resolution on primarily big box and prototype projects. Trained, mentored, motivated, supervised, and evaluated project staff. Reviewed and analyzed all key steps in processes for various project phases. Conducted code investigations and presentations to regulatory and design approval agencies. Led coordination and production scheduling meetings. Oversaw material and equipment testing. Acted as resource for design and constructability problems on a broad range of projects. Selected Projects and Accomplishments:

Wal-Mart Supercenter Special Elevation Projects and Custom Takeover or Leased Spaces.

Kinko’s New Stores Program; Toys R Us; Grocery Store for Indian Reservation; TGIF Restaurant; New Church building roofing system, water management, and detailing.

Successfully delivered first official Wal-Mart Neighborhood Market prototype. HOK SPORTS FACILITIES GROUP – Kansas City, MO

Project Architect (6/1996 to 11/1999)

Provided architectural design, coordination, and detailing as well as structural coordination, cost evaluation, and on- site design and construction problem resolution while serving in Structural Coordinator, Project Architect, and Lead Project Architect capacities.

Managed and directed team members while overseeing and participating in schematic design, architectural detailing, and construction document development, production, and coordination. Selected Projects:

Houston Astros Ballpark – Minute Maid Park; Kaufman Stadium Improvement Project, Phases 1 and 2; Busch Stadium Phase 2 Remodel; Civic Arena Renovations and Expansions.

Eden Park North Stand, New Zealand; Tampa Bay Buccaneers Football Stadium; Washington Redskins Football Stadium.

** *** **

Prior success as Project Architect with BSW International, Tulsa, OK; Project Architect & Construction Project Manager with W.L. McNatt Construction Co., Oklahoma City, OK; and Project Superintendent/Assistant Construction Manager/Engineering Project Coordinator with Edward J. Debartolo Corp, Youngstown, OH. EDUCATION AND CREDENTIALS

KENT STATE UNIVERSITY – Kent, OH – Architecture Program Licensure: California Architect #CO19258

Technical Proficiencies: AutoCAD, Prolog, Latista, Microsoft Office Suite, Bluebeam THOMAS MILNER

9638 SW Keen Ave Okeechobee, Fl 34974

ac7jli@r.postjobfree.com • 405-***-****

Project Architecture, Management and Construction Administration

EXCEPTIONALLY DEDICATED, DETAIL-ORIENTED SENIOR MANAGER WITH MORE THAN 30 YEARS OF PROGRESSIVELY RESPONSIBLE EXPERIENCE DIRECTING ALL PHASES OF HIGH-QUALITY CONSTRUCTION PROJECTS - DESIGN, DEVELOPMENT, AND DELIVERY.

PROVEN TRACK RECORD OF DELIVERING MULTIMILLION-DOLLAR PROJECTS ON TIME AND WITHIN BUDGET WHILE MEETING OR EXCEEDING CLIENT OBJECTIVES.

SOLID HISTORY OF SUCCESS IN MAINTAINING CLOSE ATTENTION TO PROJECT NEEDS, DEMANDS, AND PROBLEMS WHILE DEVELOPING AND IMPLEMENTING CREATIVE SOLUTIONS.

MOTIVATIONAL, RESULTS-FOCUSED LEADER WITH EXTENSIVE BACKGROUND TRAINING, COACHING, MENTORING, SUPERVISING, AND EVALUATING TEAM MEMBERS AND CONSULTANTS TO IMPROVE PRODUCTIVITY AND EFFICIENCY WHILE REDUCING COSTS.

Areas of Expertise:

Project Management and Administration

Design Team Leadership

Quality Construction Development

Bidding and Scope Definition

Document Production Coordination

Material Selection and Planning

Budget Administration and Cost Management

Quality Control (QC) / Quality Assurance (QA)

Problem Identification and Resolution

Client and Stakeholder Relationships

Professional Experience

Design and Construction Consultant

o Tseng Consulting Group

o John Hollin Group

o Marlins Ballpark Developer

Construction Administration

o Fort Wilderness Hotel Resort Rehab – FT on site

o Marlins Ballpark - FT on site

o New York Mets Ballpark - FT on site

o St Louis Cardinal Ballpark – design build - FT on site o Houston Astros Ballpark -- PT on site

o Project Architecture

o Nicaragua Ballpark - Design

o St Louis Cardinal Ballpark – MEP Coordinator

o New York Mets Ballpark - Design with roof– co –Lead PA schematic thru DD o Houston Astros Ballpark - DD to GMP- Structural Coordinator o Eden Park North Stand, New Zealand -Lead PA – schematic to DD and Turnover to CD Architect o Tampa Bay Buccaneers Football Stadium – curtain wall and precast systems o Washington Redskins Football Stadium – Architectural coordination o Civic Arena Renovations and Expansions - Full scope - seating, bar, ticketing offices, locker and training facilities

o Kaufman Stadium Improvement Project, Phases 1 and 2 –PA o Busch Stadium Phase 2 Remodel – PA – added suites and elevated seating bowl o Fort Leonard Wood Dining Hall – PA

o FAA Reroute Facility - PA

o Pacific Command Headquarters – precast systems, mechanical plant and systems o Naval Intelligence Facility - Rome, NY - PA

o Crane Project – PA – Custom Specifications (about 150 pages) o Shopping Malls and Centers – design and production o Department Stores – design and production

o Retail Spaces – design and production

o Program Management

o School Board of Broward County – Design and Building Program Management o Wal-Mart Supercenters Projects BSW

o Wal-Mart Special Projects TS

o Toys r us sign program

o TGIF Restaurant

o Kinko stores

o Construction Management

o Design Build Proposal for 15000 seat ballpark – Nicaragua o Design Build Maintain proposal for 60000 seat stadium - Australia o Desert Fashion Plaza/Maxims Hotel - FT on site design management o Remington Park Racetrack - FT on site asst construction manager o Cato Grease and Oil – design/build

o Wrangler - Packing and Distribution Facility

o Heliport - Downtown Air Park – design/build

o ASR4 building - design/build

o Log mansions – design/build

o Special Projects/accomplishments

o South Florida Building Code –

Code Analysis for Covered Shopping Malls for use in South Florida.

Code Analysis and design criteria for Food Courts – South Florida o Process Busters

o Materials and Product Testing –WM entry doors, concrete flooring systems o Code Analysis and Concept Plans for multiplex movie theatres. o Development of project specific tenant design criteria first used at Paddock Mall and then at multiple other malls.

Employers

GSB Architects – Oklahoma City, OK, Architect’s Site Representative Total Project Strategies – Orlando, Fl (consultant to URS) Tseng Consulting Group – Miami (consultant)

John Hollins Group – Perth AU (consultant)

Marlins Ballpark Developers – Miami (consultant)

HOK Sport/Populous Architects – Kansas City, MO

Atkins-Benham Group – Oklahoma City, OK

Taylor Scott Architects – Tulsa, OK

HOK Sport – Kansas City, MO

WL McNatt Construction - Oklahoma City, OK

EJ Debartolo Development Corp - Youngstown, OH

Education and Credentials

Kent State University – Kent Ohio Architectural Program Licensure: California Architect # C 19258

Technical Proficiencies: AutoCAD, Prolog, Latista, Micrsoft Office Suite, Bluebeam



Contact this candidate