Aditya Verma
ac7ixl@r.postjobfree.com
New Delhi-110055
ACADEMICS
S.No.
Name of examination
University/Board
School / College
Session
Percentage 1
B.Tech(Power Engineering)
Guru Gobind SinghIndraprastha university
National Power training institute Badarpur,UNDER MINISTRY OF POWER.
2013-2017
71%
2
12th
CBSE
Harcourt Butler Sr. Sec. School
2011-2012
70%(Overall)
77%(PCM)
3
10th
CBSE
Harcourt Butler Sr. Sec. School
2009-2010
72.2%
ACADEMIC PROJECTS
Project on VCRS (VAPOUR COMPRESSION REFRIGRATION SYSTEM) increasing COP by utilizing drip from evaporator for additional cooling in condenser.
EXPERIENTIAL LEARNING (SUMMER INTERNSHIP PROGRAM)/WORK EXPERIENCE
Currently working with ‘’QUALITY COUNCIL OF INDIA ‘’ wherein I have been an integral part of team working on NATIONAL SMART GRID MISSION 2017 (SECOND PHASE)under ministry of power which aims at bringing AMI(automatic metering infrastructure),OMS(outage management system),PQM(power quality mananagent),GIS MAPPING,PLM,SMART METERING,renewable energy integration,distributed generation,micro grid,in order to dwindle down the AT&C losses in power grid and increament in revenue turnout of DISCOMS OF 14 PILOT LOCATIONS throughout the india such as mysore,assam,Andhra Pradesh,himachal,iit kanpur,pudducheryetc.
Have been an integral part of the team undergoing third party inspection, feasibility study,energy audit and quality assessment of R&M work OF SMART GRID BY RESPECTIVE DISCOMS OF 14 PILOT LOCATIONS in india.
Have thorough knowledge of core concepts of mechanical engineering .
Done 8 Weeks Training in NTPC, 705 MW Thermal Power Plant from 15June 2015 to 8 August 2015.
Done 15 days simulator training in JIPT ( Jindal institute of power technology), Raigarh.wherein we were imparted a 13 days intensive class room program on thermal power plant operation and real time on job training on "Honeywell make replica simulator 210 MW". Ensureing knowledge about cold start,load regulation,power plant emergencies, pre-checks, operational abnormalities,efficiency parameters such as SHR (station heat rate ),PLF(plant load factor), specific fuel consumption.
Scheme tracing of various systems in power plant 1. HP-LP bypass, flange sealing,turbine lube oil systemcondenser etc.
Have thorough knowledge about BMD (Boiler Maintenance department)pressure parts,mills and its efficiency parameters, TMD(turbine maintainance dpt), CEP, AHP, CHP, BFP, Super heaters, Re-heater, Regenerator, condenser, hp& lp heaters,dearator,fans and its types used in power plants accordance with their usage, Power cycles .
IT SKILLs
C, MS excel, MS WORD.
ACHIEVEMENTS
Participated in various events and activities in college.
Won ESPN sports quiz 2007.
Awarded as Student of the year in 2008.
EXTRA CURRICULAR ACTIVITIES
Lead a team undergoing quality assessment work FROM QUALITY COUNCIL OF INDIA and third party inspection OF TOILETS MADE UNDER SBM(SWACHH BHARAT MISSION 2014) in UTTAR PRADESH,DISTRICTS SUCH AS ALIGARH,LAKHIMPUR KHERI,MAHAMAYA NAGAR,BREILLY,FIROZABAD.
I have worked with CII through event management company(confluenz),as a Liaison Officer.
I have also worked as Liaison Officer in PravasiBharatiye divas.
Currently teaching ENGINEERING ASPIRANTS at various online teaching platforms such as Urban clap, itz tutor.
Working out at gym, cycling, running, cooking.
Giving free Tutions to economically weak students.
Reading novels and books.
PERSONAL DETAILS
Father’s Name :- Late Mr.Jagmohan Verma
Date of birth :- 25th April 1995
Language Known :- English, Hindi and Punjabi
Marital Status :- Single
Nationality/Religion :- Indian / Hindu
Interest & Hobbies :- Internet browsing,watching movies, reading novels and playing cricket
DECLARATION
I do hereby declare that the above information is true to the best of my knowledge.
Place: Aditya Verma
Date: (Signature)