Marikannan Ramakrishnan
Krabi,Thailand - 84110
Tel: +666********
Mobile: +917*********
Skype : Marikannan.raghul
Email: *********@*****.***
OBJECTIVE
To apply and to continuously enhance my technical expertise in pursuit of challenging and growth oriented carrier with a professionally managed organization.
SUMMARY
A well presented and pro-active who has a relentless drive to have a broad impact rather than just delivering results. Possessing 5+years experience of Technical, coordinating and managing project activity, and maintenance and ensuring that all the requirements are fully met. I am a confident communicator with strong interpersonal and analytical skill who thrives on social interaction and customer satisfaction.
PROFESSIONAL EXPERIENCE
1)
Company : Saraff Global – Bangkok, Thailand
Designation : E&I Engineer
Duration : Sep 2015 to present
Plant : 1. Bio Mass Power Plant ( Palm Waste ) 11 Mw
2. Bio-Gas Plant 3.5Mw
: 1*55 TPH (Travelling Grate Boiler)
: 2*1.05MW, 1*1.45MW - GE's Jenbacher Gas Engines.
Work Site : Saraff Energies Co.LTD, krabi - Thailand
Saraff Bio-Gas Energy LTD, krabi – Thailand.
Description : Planning and ensure the all maintenance job in frequently duration and monitoring the working condition of all motors and transformers and others electrical systems make the spare item and proper documents and maintenance.
JOB RESPONSIBILITIES
Maintenance & operation of 12000 KVA Transformers.
Maintenance & operation of 3000KVA, 2000KVA, 2 no’s of 1600KVA, 500KVA Transformer. For Auxiliary load.
Maintenance & operation of 11875 KVA/9500Kw Turbo-Generator.
Maintenance & operation 3 no’s of 90Kv Rectifier Transformers for Electro static precipitator (ESP)
Maintenance & operation the Static Excitation system and take the responsibility while synchronizing.
Maintenance & operation the HT Breakers (33Kv/11Kv/6Kv/380vac – VCB, SF6,ACB) in Switch Gear and Switch yard with CT & PT.
Maintenance & operation of Diesel Generator – FG Wilson 550Kva/440Kw with Automatic transfer system (ATS).
Maintenance & operation of VFD Controlled Panel Maintenance. (ABB, Siemens,Powetron,LS)
Maintenance & operation 2 no’s of 250 kw Motors with VFD.
Maintenance & operation 3 no’s of 180 kw Motors with VFD.
Make & Trouble shoots the VFD control.
Make & Trouble shoots the DOL & Star-Delta circuits with requirements of Interlocks
Maintenance & operation of Ash Handling System.
Trouble shoots the Ash handling Control circuits.
Trouble shoots the Turbine, Generator & Boiler related Instruments like (Current to pressure converter(CPC- Woodward 505),pressure switch, thermocouples, and pressure and level transmitters (ABB, Honeywell)
Maintenance & operation of Woodward Turbine protection (8000 series) control system.
Installed and Maintenance of Level Sensors for raw material feeding Controls
Installed and maintenance of CCTV Camera.
Making the Auto Lighting Circuits and Maintenance.
Operation & maintenance and trouble shoots of air Compressors.(Screw type, centrifugal and stage )
Maintained Air Conditioners.
Maintain the daily records and report to organization
2)
Company : Value Multiplier Consultancy Services, Chennai – India
Designation : Associate Consultant
Duration : June 2013 to May 2015
Project : Iron Ore Pelletizing Plant, Plate mill (Capital Erection Project)
Project Cost : $100 Million
Total Scope : 12000 MT (Structures), 5900 MT (Equipments), 26000 M3 (RCC)
Work Site : Monnet Ispat & Energy Limited, Raigarh, Chhattisgarh, India
Description : 2.2 MTPA Iron Ore Pelletizing Plant with Straight Gate Furnace Technology by Jacobs, Metso, USA. Also equipped with Fast Filter Press (FFP), Balling Disk, Erich Mixture, 45m High Rate Thickener (HRT), Agitator, Wet Grinding Ball Mill, EOT Cranes etc. Major consultants are JACOBS, METSO (USA), AKER POWER GAS (PUNE), STEMCOR & MECON (BANGALORE).
JOB RESPONSIBILITIES
Responsible for planning, estimating the work to be done, identifying technical supports needed, critical path activities, Risk factor & all the resources needed for each Activity.
Manage projects, and drive the project team
Read Drawings and provided support for project activities
Pro-actively manage project risks and issues and minimize their impact on the project
Ensure planning, scheduling, monitoring & timely execution of fabrication and erection at site
To plan for the resource required for the job to be done at right time
To prioritize the material requirement for the entire project & provide support to the purchase team for the procurement and supply of material as per site requirement.
Coordinate and manage project reporting, project reviews and project steering meeting
PROFESSIONAL SKILLS
Project management (CCPM) .
Technical support commissioning,
Maintenance.
RELEVANT TRAININGS
Description
Place of Training
Year
In plant Training
Tuticorin Thermal Power Station
2011
Diploma in Computer Application
CSC Computer Education, India
2009
E - CAD
CSC Computer Education, India
2015
PROFESSIONAL QUALIFICATION
Degree
College & University
CGPA
Year Of Passing
Bachelor of Engineering in
Electrical & Electronics Engineering
ANNA UNIVERSITY – Chennai
7.38
2013
COMPUTER SKILLS
Operating Systems : Windows XP/ Vista/ 7/ 8, E-Cad (Basic)
Packages : Microsoft Office, Microsoft Project,
LINGUISTICS
MOTHER TONGUE
Tamil
LANGUAGE
UNDERSTANDING
SPEAKING
WRITING
Listening
Reading
Spoken interaction
Spoken production
English
Excellent
Excellent
Excellent
Excellent
Excellent
Hindi
Excellent
-
Excellent
Excellent
-
Telugu
Good
-
Good
Good
-
Thai
Basic
-
Good
-
-
PERSONAL INFORMATION
Father’s Name : Mr. S.Ramakrishnan
Mother’s Name : Mrs. R. Padmavathi
Nationality : Indian
Date of Birth : 26. 05. 1992
Marital Status : Single
Passport No : K9964308
DECLARATION
I Marikannan Ramakrishnan hereby declare that the above furnished information is true to the best of my knowledge and belief.
Place : Krabi - Thailand Yours Truly,
Date :
(R. MARIKANNAN)