PROFESIONAL SYNOPSIS

To utilize my experience and skills to meet the construction challenges time, quality and safety

Use my relationship management and communication skills to manage the internal and external stakeholders, bringing the benefit of quick turnaround to the project

Field of specialization

ORGANISATIONAL EXPERIENCE

Total Experience: Over 15+ Years

IMAR TRADING AND CONTRACTING C0 W.L.L.., QATAR – November 2016 – April 2018 as QA / QC Engineer

ARCHIRODON CONSTRUCTION OVERSEAS CO SA, RASLAFFAN, QATAR - April – 2012 to April 2015 as QA / QC Engineer

NATIONAL PROJECTS & CONSTRUCTION L.L.C, ABU DHABI, UAE - June 2008 to May 2012 as QA/QC Inspector

AMJAD MAJAN L.L.C, OMAN – JUNE 2005 to DEC 2008 as Project Engineer

BUILTMAN BULDERS, Chennai, India - October 2001 to August 2005 as Site Engineer

As QA / QC Engineer

Employer : IMAR TRADING AND CONTRACTING C0 W.L.L..,QATAR

Projects : Metro-Green line Underground (Hamad Hospital Station )

Client : Qatar Rail

Consultant : Hill International-Astad JV

RESPONSIBILITIES:

Inspect all materials for compliance to submittals and drawings

Inspect all types of screed works (Bonded and unbonded) for public facilities room and equipment’s room for underground station

Inspect the non-bearing block work, plaster and fire sealant activities.

Inspect CAT-1 and CAT-2 terrazzo flooring from surface to finishing.

Inspect the tiling work, drywall partition and fall ceiling works for public facilities.

Witnessing survey and setting out for all the activities such as column vault, drop light vault, escalator vault, wall and ceiling substructure.

Inspect wall, column, ceiling and vault substructures.

Inspect the balustrade and handrail works for public staircases.

Involve third party inspections such as pull out test for anchor bolts, NDT test for welding and DFT testing for painting

Inspect fire proof shelter structural steel installation along with bolt tightening including roof finishes

Inspect all types of finishes for wall, column and ceiling like acrylic, metal, gypsum board, GRG and GRP.

Self-certifying and approving or rejecting all inspection and materials as per approved documents.

Issuing NCR for product failure or work proceed through the hold points and SCAR for system failure like unapproved documents.

Reporting to the QA/QC Manager about major issues and attending weekly meeting with QC Manager.

Performing the site QA/QC documentations and logs auditing with client technical representative quarterly.

Maintaining QA/QC documents of entire project including certificates, calibration, test results, Site inspection requests, Material inspection request, non-compliance reports, site observation reports and other QA/QC documents.

As QA/QC Engineer

Employer : ARCHIRODON CONSTRUCTION OVERSEAS CO SA, RASLAFFAN, QATAR

Projects :1) EPIC OF CIVIL AND MEPI WORKS (PHASE 2A) FOR ERHAMA BIN JABER ALJALAHMA SHIPYARD PORT OF RAS LAFFAN, QATAR

2) CONSTRUCTION OF CIVIL AND BUILDERS WORKS FOR ERHAMA BIN JABER ALJALAHMA SHIPYARD (PHASES 4A, – PORT OF RAS LAFFAN STATE OF QATAR

Client : NAKILAT (Qatar Gas Transporting Company)

Consultant : ROYAL HASKONING

RESPONSIBILITIES:

Performing all material inspection for civil and architectural on site for conformance with project specification.

Involving site inspection for enabling works such as rock nail grouting, shotcrete, ground anchor, piling work and dewatering as per drawings and specifications.

Witnessing the survey and setting out, monitoring the piezometer reading for water level and inclinometer and 3d prism for subsurface movement.

Witnessing the third party on testing such as rock nail pull out test, ground anchor suitability test.

Inspecting the below and in-slab earthing and drainage pipe installation, witnessing the continuity test for earthing and gravity, pressure test for drainage pipes.

Inspecting waterproofing works for raft foundation, external wall and roof for underground station,

Witnessing third party on testing for compaction test (Nuclear Gauge test method) for each compacted backfilled layer and performing the plate load test for the final layer.

Inspecting concrete structure activities like rebar installation for raft foundation, sump pit, retaining wall, column and internal elements as per drawings requirements.

Inspecting post-concrete for defect assessment and repair works as per MS requirements.

Checking of concreting for slump flow, slump and temperature and verifying the delivered concrete as per approved design mix along with the required number of samples.

Involving site inspection for architectural work such as Non-bearing block work installation, lintel and stiffener beams, plastering, floor screed, upstands and plinths, painting (Emulsion, epoxy and anti-dust sealer)

Attending various site inspection with client and consultant as per project protocol.

Preparing Snag list for finished work with client’s representative along with the site Manager by mobile online SNAGR and making summary for completed/incomplete activities.

Verifying the agreed proposed remedial action, cause and proposed action to prevent recurrence from Station Manager.

Maintaining QA/QC documents of entire project including certificates, calibration, test results, Site inspection requests, Material inspection request, non-compliance reports, site observation reports and other QA/QC documents.

As QA/QC Inspector

Employer : NATIONAL PROJECTS & CONSTRUCTION L.L.C, ABU DHABI, UAE

Projects : 1) NATION TOWERS IN ABU DHABI (50+65 FLOORS IN 2 TOWERS)

2) AL REEM ISLAND ZONE-D, ABU DHABI (1 BASEMENT, GROUND, 7 PODIUM + 49 TYPICAL FLOORS TOWER D1, D2, D3

Client : INTERNATIONAL CAPITAL TRADING (ICT) / TAMOUH

Consultant : KEO INTERNATIONAL CONSULTANTS /APG CONSULTANTS

RESPONSIBILITIES:

Make all inspection tests Report and Coordinate with site and project engineers and follow the work in site in buildings D1, D2, D3.

Coordinate with consultant to inspection and clearance all inspections before cast concrete.

Check concrete delivery at site temperature and slump and take cube according to specifications.

Coordinate with laboratory to bring all result for all tests and check calibration certificate for all machines used for test.

Take sample for any material delivery at site and make material inspection request and send to laboratory to check it according to specification.

Coordinate with Municipality engineers to clearance inspection for slab before cast.

Coordinate with consultant to take approve for drawings for all buildings.

Make (I.T.R) Register and observation Report Register and (N.C.R) Register and monthly reports for results for all test.

Coordinate with subcontractor for water proofing (desert) and post tension (MGC) and MEP subcontractor (ETA), and others to take check list and clearance for their works in site.

As Project Engineer

Employer : AMJAD MAJAN L.L.C, OMAN

Projects : 1) CONSTRUCTION COMPLETION AND MAINTENANCE OF HOUSING UNITS (180 no’s)

2) CONSTRUCTION COMPLETION AND MAINTANCE OF WALI RESIDENCE

3) CONSTRECTION OF WARE HOUSE

Client : MINISTRY OF HOUSING / MINISTRY OF INTERIOR / PETROLIUM DEVELOPMENT OF OMAN

Consultant : ABDULLAH MUCKADAM / KADRI CONSULTANT / MOOT MACDONALD

RESPONSIBILITIES:

Detailed study of construction drawing and discuss construction plan with Project Manager

Plan the work and efficiently organize the plant and site facilities in order to meet agreed deadlines

Procurement and Material management delivery of materials within the time at project site. (Making of Enquiry and Order Indent for materials and suppliers)

Forecast the upcoming activity and plan the resource

Ensure that all assigned work is completed as per project program and within agreed budgets.

Site Supervision & construction management at site with more efficiently and effectively with monitoring and co ordinations

Conducting project review meetings for tracking project progress and preparing reports.

Conducting Coordination, review meeting with Subcontractors

Implementation of QA/QC and HSE policy

Implement new ideas /methods and continue to seek ways of both improving, contribution to the organization’s goals and enhancing the reputation of the company

Daily and Monthly Project progress report preparations

Detail study of construction drawing and develop construction plan & scope of work with details and technical clarifications with clients & consultant

As Site Engineer

Employer : BUILTMAN BULDERS, Chennai, India

Project : CONSTRUCTION OF MULTY STORY APPARTMENTS.

Client : SRIVASTA FOUNDATION

Consultant : SARAN ARCHITECTS

RESPONSIBILITIES:

Report to the Construction Manager about progress of works & upcoming planning

Preparing site working task schedule, Man power requirement and material requirements.

Site Supervision and monitoring the assigned work force.

Monitor the Subcontractor works.

Prepare project progress reports weekly and monthly for Project managers review and comment

Comply with all requirements of QA/QC and HSE policy

Site Supervision and delivery the project with better quality and economically

Maintained strict quality control procedures.

SCHOLASTICS

Diploma in civil Engineering, India - 2001

Higher Secondary Education, India - 1999

CQI and IRCA Certified ISO 9001:2015 Lead Auditor Training course (PR328) - 2018

SKILLS AND STRENGTHS

Sound knowledge of new market trends & technology & constantly updating on emerging technologies

Good team player with strong leadership, excellent communication and presentation skills

Computer proficiency and skills:

Excellent in MS Office

PERSONAL DETAILS

Father’s Name : Augustin

Date of Birth : 02 Feb 1980

Sex : Male

Nationality : Indian

Marital Status : Married

Passport No : K 4620025

Languages : English, Hindi, Tamil & Malayalam.

REFERENCE:

BHASKARA REDDY-QA/QC MANAGER-IMAR TRADING AND CONTRACTING COMPANY CO.W.L..L..

MOBILE :+974-********

EMAIL ID : ac7hys@r.postjobfree.com

Ensure QA/QC Procedure followed

HSC policy implementation

Coordination with subcontractors

Building Structural works

Finishing Works

Precast Works