CURRICULUM VITAE
Muhammad Amin Akbar
P.O Box Mudkey Dhariwal
Tehsil Kot Radha Kishion Dist.
Kasur.
Email: **********@*****.***
Cell: 0092 333-***-****
Cell: 0092 341-***-****
CAREER OBJECTIVE
Seeking a challenging management position within a dynamic and progressive organization focusing on primary growth & development and that provides a supportive environment to a motivated, innovative and creative executive, equipped with strong academic & professional qualification and comprehensive practical experience.
ACADEMIC QUALIFICATION
MATRIC (SCIENCE)
Govt: High School, Chuburji Gardens, Lahore.
Diploma in (Electrical).
International Institute Railway Station Lahore.
PERSONAL INFORMATION
Father’s Name Muhammad Akbar
Date of birth 24.08.1970
CN.I.C # 35202-5126033-7
Religion Islam
Nationality Pakistani
Marital Status Married
Domicile Kasour.
Driving lenience Lahore
WORK EXPERIENCE
1.Worked in Reputable Multinational Company Honda Atlas Cars (Pak)
From March- 1994 To Feb 1997 following activities Maintenance: depart: As Electrical Supervisor Honda Atlas Cars Plant Installation of HT Panel LT Panels Over Head Conveyers Air Compressors & Air Dryers (Atlas Cap Co.). Installation of Generators 1200 KVA Changeover Panels Installed and Air Conditioning System All over the Plant Installation of Fire Alarm System All over the Plant
2.Volvo Pakistan (Pvt.) Ltd. Multan Road Sunder. Lahore.
Worked As a maintenance in charge. April, 1997 to July, 1997 Volvo Plant installations of HT Panel & LT
panels Firefighting Pumps Firefighting Control Panel & installation of assembly Line of Trucks FL 10 Installation of Diesel Generator 850 KVA Changeover Panel. PFI Panel
3 M. Artal Poultry Processing Plant.
As a Electrical & Refrigeration Supervisor from july-1998 to Dec-2004
Installation of Refrigeration system Screw Compressors Reciprocating Compressors (NH3) Ammonia Separators -10c & -40 c ( NH3 ) Pumps Evaporators Blast Freezers & Cold Stores Condenser Baltimore Ammonia Gas Pipe line & Valve stations Before the Evaporators.
4. Synergy Resources & Awami Gas (Pvt) Limited 35-Km Multan Road Lahore.
Worked as technical plant supervisor from Dec 2004 to July 2008. I also have a vast Experience in installation of LPG plant. LPG Storage Tanks & LPG Tank Accessories Prvs, Roto gauge. Access flow Valves. Ulge gauge Multi port LPG. Multistage pumps LPG Vapor Compressors Corken / Blackmer LPG Filling Machines. Fire Fighting according NFPA 50 & installations LPG pipe line.
5. BBN Energy (pvt) ltd. Sova Asil Road Raiwind Lahore
Worked as technical Plant Manager from July 2008.to January 2011. BBN Energy Company is a well known Company in LPG field they are importers from (IRAN). I help the BBN energy in Installation of LPG store at Ttaftan Iran Border of 150 metric Ton Capacity. During Serves in BBn Company Different LPG Plants Maintenance and installation of LPG tank& Pumps Vapor Compressors Specially Fir fighting Equipments.
6 Seasons Foods processing plant 1.5 Km Rawind Manga Road Rosa Bhel
Working as a Refrigeration Manager (February 2011 to
Installation of Ammonia Compressors 6 stages & 9 stages of Grasso nether land (NH3) Pumps Evaporators Separators Tanks Liquid receiver Oil Separator. Also installation of blast freezer Cold Store and Anti room. Vegetable Stores All Delivery refrigerated Trucks look after and repairing of refrigeration system Total Refrigeration Experience on Grasso Plant Screw Type Compressors K 250 & K90 and Reciprocating Compressors RC 11 & RC 12 on Experience 08 Years in the Seasons Foods Serves till to date.
7 Neat Foods (Pvt.) Ltd Processing Unit Mustafa Abad
Ferozepur Road Lahore
Working as a (Deputy) Manager Maintenance (March 2014 to till now)
Installation of all processing machinery of Meyn and All Electrical Panels Destitutions LT and HT
Wapda Metering Panel Protection Panel Transformer Power House Panels Installation Synchronizing
Panel PFI Panels Cablings of all type pvc/pvc Armed and Unarmed single core tow core three core
4 core All Termination HTand LT Cabling Completion
Installation of Blood Receiving System
Installation of Water Treatment System
Installation of refrigeration System GEA Grasso Company Screw Compressors Low Stage and High
Installation Condensing System Air purging System
and Separator Tank -40c*-10c* Ammonia Pumps Plate Heat Exchanger and Evaporators Blast Freezing
System and Cold Storage System
8 after need foods project complete again recall MENU seasons Foods Company 25 February 2015 to
February 2018
9 AL- Shaheer Foods Corporation
Working as a Refrigeration Manager from 22/01/2018
Installation All refrigeration system Grasso&mycom&Sabroe Compressors evaporators -10&-30&-40
Blast freezers spiral freezers Trolley Terminal Evaporative Condenser
Installation pressure testing Vacuum All system -10 Vessel -30 Vessel -40 Vessel Hot Gas liquid
Receiver
Ammonia Gas charging and continue working with Al-Shaheer Foods
10 COMPUTER SKILLS
Computer Applications (Microsoft Office XP), Internet Utilities. Having good knowledge to operate Windows 2007 Professional and Windows XP.
References:
I give you on demand