FROM,
MR. PATEL HITESHBHAI RAMESHBHAI
AT&POST- CHIJGAM, NEW STREET
TA.- JALALPORE, DIST.- NAVSARI
PIN.- 396460, INDIA, GUJARAT
MOB.-+919*********
skype ID=hitesh6689
EMAIL- ac7bm4@r.postjobfree.com /ac7bm4@r.postjobfree.com
To,
Respected sir,
SUB : APPLICATION FOR THE POST OF “Field Operator /Control Room Operator ”
Being given to understand that you have been recruiting personnel for the above post in your organization. I am taking this opportunity to submit my candidature with relevant details for your kind consideration.
NAME : PATEL HITESHBHAI RAMESHBHAI
DATE OF BIRTH : 06/06/1989
LANGUAGES KNOWN : ENGLISH, HINDI, GUJARATI
GENDER : MALE
MARITAL STATUS : UNMARRIED
CAST : HINDU (SEBC)
NATIONALITY : INDIAN
HOBBY : READING, WRITING, CRICKET, MUSIC
PASSPORT DETAILS :
PASSPORT NO : K 4796913
PLACE OF ISSUE : SURAT
DATE OF ISSUE : 18/07/2012
DATE OF EXPIRY : 17/07/2022
EDUCATION QUALIFICATION :
EXAMINATION
NAME OF BOARD & UNIVERSITY
PASSING YEAR
PERCENTAGE
S.S.C
G.S.E.B.
MARCH 2005
72.20 %
H.S.C (SCIENCE)
G.H.S.E.B.
MARCH 2007
72.29 %
B.Sc.(I.T.) 3 Years
Veer Narmada
South Gujarat University
MARCH 2010
57.21 %
DIPLOMA CHEMICAL ENGINEERING 3 Years
IBME ENGINEERING COLLEGE, SURAT
JULY 2013
67.04 %
ADDITIONAL QUALIFICATION :
Computer Fundamental, MS Office, Knowledge of Networking, Software Engineering, Data Structure, Operating Systems
PHP Web Development, MySQL.
EXPERIENCE :
I have worked 5 year in oil & Gas, Petrochemical industry as a Plant Operator.
I have knowledge of pre-commissioning, commissioning, plant normal start- up and shutdown. Covering various type of process unit operation of Distillation, different type of compressor & pumps. Reformer, Absorber, Stripper, Blower, Tank farm activities, Furnace &Reactore.RO Plant and also involved in product Quality ISO-9002 procedure.
Pre-Commissioning & Commissioning Activities :
Inspection of piping & instrument system as per P & ID.
Water & air Flushing & drying of pipelines.
Steam blowing of pipe lines.
Purging & initiation of the unit using N2 gas.
Catalyst loading of vessel.
Hydro testing witness.
External inspection assisting of column,Vessels,Tanks,Filters,Exchanger& knock out drum.
Punch list preparation,follow-up,andclearing with co-ordination with maintenance.
Utilities service line leakiest and pressure holding test.
Valve tray eraction in distillation column and tray checking for levelness weir height,down comer clearance,valve free movement and proper tightening of tray decks.
Inspection of line,flanges for proper gaskets,Flow,restriction orifices and NRV
No-load trial running of comp,motor and pump with vendor assistance and performance test.
Commissioning of utilities like plant air,instrumentair,LP& HP steam,N2,cooling water,servicewater,DMwater,fuel gas lines.
AROMATICS unit-
UOP Naphtha Hydrotreating Unit – Removes sulphur and nitrogen contaminants from the naphtha feedstock. CCR PlatformingTM Process – Selectively reforms naphtha to aromatics (BTX) and high purity hydrogen. ED SulfolaneTM Process – Extracts benzene and toluene from the reformate using an extractive distillation flow scheme. Sulfolane can also be liquid-liquid extraction process for certain feed stocks. TatorayTM Process – Disproportionates and transalkylates toluene with heavier aromatics to produce benzene and xylenes.
DUTIES &RESPONSIBILITIES :
Looking after all the section like Compressor,Pump,Cooler etc…
The safe,reliable& efficient operation and process control parameters maintaining plant start-up & shut-down activities,emergency and also maintaining good house keeping.
Safety & regular check-up of plant condition.
Report all the abnormalities and failures to the supervisor and take possible corrective measures immediately.
Communicate and co-ordinates between the various department for smooth operation of the plant.
Follow-up the maintenance jobs by (SIOPE) Safe Isolation Of Plant Equipment Procedure.
Start-up and Shut-down of the plant.
Routine checking of lubrication system for compressor,pumps,etc. and also to make up oil for the same.
Taking regular training of safety and fire fighting.
Periodical plant training and product quality ISO-9002 procedure.
Continuous vigilance on Quality of product through laboratory result and make or adjust necessary correction with the process parameters.
Follow-up the instructions from hierarchy for any modification implementation in the process.
Desalination plant operations through DCS system.
TRAINING / COURSE :
Following course training conducted by
FIRE & SAFETY
All employees are responsible for their own health and safety at work and that of their co-workers.
Taking care of the environment is a key part of our operational respomsibility.
Safe plant and safe system of work.
Hazard Management
Hazards are identified
Risk of the hazards are assessed
Risk are controlled
Safety Induction Course ; Fire Fighting Course ; Isolation Authority
Safe works permit system : Hot work permit/cold work permit/ confined space permit/excavation/vehicle entry. Log out and Tag out (LOTO).confined space Hole Watchers
( Authorized Safety Inspector)ASI First enter any confined space permits signatory
Fire and gas detection system : flammable gas detection monitor/indicator and alarms for detector in control room and in field
Fire fighting system : Fire water system : Fire hydrants/Fire monitors/Fire hose station/Deluge system/Dry chemical and CO2 extingusher
Personal Protection equipment : SCBA/Air line mask/Escape set/cartridge type/Face shield/Hand gloves/chemical splash proof goggles/safety shoes/ear plugs/ear muff/safey helmet/protective suit(PVC apron)/safety belt.
1)Hazira LNG Private LTD.(LNG Plant) Surat As a Field Operator From 02/05/17 To tillcon.
2) (Qatar National Facility Services) QNFS (Qatar shell GTL Limited) Shutdown Jobs work as a, Field Operator 07-03-2017 to 15-04-2017
(SIOPE) Safe Isolation Of Plant Equipment Procedure.LOTO
Log out and Tag out Purging & initiation of the unit using N2Gas.AGT Gas test
3) ONGC Mangalore Petrochemical Ltd AROMATICS unit-
As a Junior Plant Operator From 01/08/13 To 30/01/14.
4)Ketan Engineering Service PVT. LTD. SURAT As a Junior Plant Operator From 01/02/14 To 31/08/15.
5). Hazira LNG Private LTD.(LNG Plant) Surat As a Field Operator From 02/09/15 To 28-02-2017.
I am sure you will consider my application and will call me for a personal interview when I shall submit all the relevant certificates in original.
I assure you that I will carry out the entrusted duties honestly and to the entire satisfaction of my superiors in case of my selection for the post applied for.
Thanking you,
Yours Faithfully
(HITESH R. PATEL)