Curriculum Vitae
Mr. Rewat Mechanphet
JOB TITLE : Sr. CIVIL/STRUCTURE DESIGNER
PERSONAL DETAILS
BORN : 17 July 1954
CITIZENSHIP : Thai
RELIGION : Buddhism
SEX : Male
HEIGHT : 170 Cm.
WEIGHT : 70 Kg.
MARITAL STATUS : Married
PRESENT ADDRESS
65/12 T. M2. T. Surasak, A. Sriracha, Chonburi Province 20110 Thailand Mobile: 66-(0-82-705****, Home: 66-(0)38-774653
E-mail: ac7ao2@r.postjobfree.com
ac7ao2@r.postjobfree.com
EDUCATION DETAILS
During Name of
School
Level Major GPA
1976 ~ 1978 Bangkok
Technical Institute
Diploma Building
Construction of
Technology
3.20
SPECIAL KNOWLEDGE AND SKILLS
AUTOCAD
MicroStation V7&V8
3D Modeling FrameWork
3D Modeling PDS
SOFTWARE EXPERIENCED
LANGUAGE
DETAILS
ENGLISH
Reading / Writing / Listening /
Speaking
Fair
WORKED EXPERIENCED WITH FOSTER WHEELER 20 YEARS
Experience in the oil & gas industry producing concrete work and steelwork 3D models, 2D smart plant review steelwork G.A. drawings and details drawings. Familiar with various structures, piperack structures, equipment support structures, miscellaneous platform, and pipe support structures etc. Involvement with projects ranging from FEED to EPC stages of work, located on various refineries and process plants throughout the world. Previously responsible for complex modular structures, design included phases for lifting, land/sea transportation and final site assembly Duration Project Position Worked and Responsibility Details 2016-2017 amec foster
wheeler Thailand
KUWAIT PETROLEUM
AVIATION THAILAND
LTD. (Q8 AVIATION)
Principal Civil
Structure Designer
Responsible for the preparation of PDS 3D CAD
Modelling PDS Frame Work and 2D CAD
(MICROSTATION V8) steelstructure G.A. &
details,checked PDS MODELLING & Smar tplant
reviwe Equipment foundation, details, pipe Bridge, pipe support details and layout plan Steel work plat form equipment support & miscellaneous
2015-2016
SHIN STEEL THAILAND
CO,LTD
Eastern Seaboard Industrial
Estate Rayong
Civil Supervisor
Responsible Preliminary Design, Construction And As-Work Built shop. Drawings. Planning Material take off. Quantities checking.
July-31-2014 Foster
Wheeler Ltd.Thailand
THAPPLINE PROJECT
ASSIGNED TO SPRC
STAR REFINERYNG
REVAMP T& I PROJECT
Principal Civil
Structure Designer
QUANTITY
SURVEYOR
Responsible for concrete work,steel work
3D CAD Modeling PDS Frame Work
And 2D CAD (MICROSTATION V7 & V8).
Responsible checked quantity material steelstructure platform pipeisometric isulation electrical &
insument
2013~ 2014 Foster
Wheeler Ltd.Thailand
THAI OIL REFINERY
PUBLIC COMPANY
LTD.HVU-3 PROJECT
FEED DESIGN
CUP-1 PIPE & POWER
DISTRIBUTION PROJECT
ASSIGNED TO FW
SIGAPORE ASIA PACIFIC
CHEVRON
ORONITE
CARBOXYLATE
PROJECT
PTT ME ANAPUNA FEED
PROJECT
Principal Civil
Structure Designer
Responsible for the preparation of PDS 3D CAD
Modelling PDS Frame Work and 2D CAD
(MICROSTATION V7& V8) steelstructure G.A. &
details,checked PDS MODELLING & Smar tplant
reviwe Equipment foundation, details, piperacks
details and layout plan Steel work plat form
equipment support & miscellaneous support
2011~ 2013 Foster Wheeler
Ltd.Thailand
THAI OIL REFINERY
EL PSAA3 Project
Thailand
Principal Civil
Structure Designer
Responsible for the preparation of PDS 3D CAD
Modelling Frame Work and 2D CAD
(MICROSTATION V7& V8) steel structure &
details, checked PDS MODELLING & Smar tplant
reviwe Equipment foundation, details, piperacks
details and layout plan
Steel work plat form equipment
2010~ 2011 Foster Wheeler
Ltd.Thailand
Exxon Sriracha Clean Fuels
Project (Thailand)
ESSO(Thailand) Public Ltd.,
Comapany
Senior Civil
Structure Designer
Responsible area GOHF-2,GOHF-3 for the
preparation of PDS 3D CAD MODELLING an 2D
CAD (MICROSTATION V7 & V8) steelstructure
platform G.A. & details & miscellaneous support
smartplant review checked.
2008~ 2010 Foster
Wheeler Ltd.Thailand
THAILAND GROWTH
-POWER UTILITIES AND
INFRASTRUCTURE
MTP-HPPO
MANUFACTURING
COMPANY LTD. PROJECT
Senior Civil
Structure Designer
Responsible for the preparation of PDS 3D
Modelling package and 2D drawing CAD
(MICROSTATION) and Smartplant review, training
local staff in the use of PDS Frameworks and
Microstation
Design Tank Foundation details, Main Process
steelstructures platform foundation, Main steel
Piperack Cooling water Basin, Tower Platform
and Exchanger & details & Miscellaneous support
2007-2008 Foster Wheeler
Ltd.Thailand
EXXONMOBIL ASIA
PACIFIC PTE. LTD.
SINGAPORE HCF
EXPANSION PROJECT
Senior Civil
Structure Designer
Responsible for the preparation of PDS 3D CAD
MODELLING an 2D CAD (MICROSTATION)
concrete G.A. details, R.C. details, checked drawing, checked PDS MODELLING and smartplant review
steelstructure platform G.A. & details &
miscellaneous support smartplant review checked.
2006-2007 Foster Wheeler
Ltd.Thailand
THAI OIL REFINERY
PUBLIC COMPANY LTD.
THAILAND CDU3
REVAMP PROJECT
Senior Civil
Structure Designer
Responsible for the preparation of PDS 3D
Modelling Fram Work Program and 2D CAD
(MICROSTATION) concrete G.A. details, R.C.
details, checked drawing, checked PDS
MODELLING and smartplant review
steelstructure platform G.A. & details &
miscellaneous support smartplant review checked.
2005 – 2006 Foster
Wheeler Ltd.Thailand
Bayer Polymers-Map Ta Phut
Thailand
PC DBN 250KTP Extension
Project
PTT Phenol Project
Thailand
Civil Structure
Designer
Responsible for the preparation of PDS 3D CAD
Modelling Frame Work and 2D CAD
(MICROSTATION) concrete details, R.C. details,
checked PDS MODELLING Equipment
steelstructure platform G.A. & details &
miscellaneous support smartplant review checked.
2004 – 2005 Foster
Wheeler Ltd.Thailand
Indorama PTA
Map Ta Phut Project
Thailand
Civil Structure
Designer
Responsible for the preparation of PDS 3D CAD
Modelling Frame work Program concrete general
arrangements and details and 2D
CAD(MICROSTATION) Substation concrete
structure layout and details Equipment Foundation
Tank foundation concrete G.A. and R.C. details,
piperacks &Piling layout.
2004 – 2004 Foster
Wheeler Ltd.
PTT Gas Plant Public new
knockout drum
Project Map Ta Phut
Thailand
Civil Structure
Designer
Responsible for the preparation of 2D
CAD(MICROSTATION) Concrete Tank foundation
concrete G.A. and R.C. details, piperacks details
Piling layout, Piling details
2003 – 2004 Foster
Wheeler Ltd.
The New Zealand Refinery
Company Project
Civil Structure
Designer
Responsible for the preparation of PDS 3D
Modelling Framwork
concrete general arrangements and details and 2D
Microstation Program concrete details R.C. details Substation concrete structure layout and details
Equipment Foundation
Tank foundation concrete G.A. and R.C. details,
piperacks detail
2001 – 2003 Foster
Wheeler Ltd.Thailand
SSSP Site 7&3 Design
Project In Reading UK.
Assigned to Work in FW
Office Reading UK
Civil Structure
Designer
Responsible for the preparation of PDS 3D
Modelling PDS Frame Work concrete general
arrangement and 2D CAD(Microstation) concrete
steelstructure platform G.A. & details &
miscellaneous support smartplant review checked.
2000 – 2001 Foster
Wheeler Ltd.Thailand
Bayer Polymers-Map Ta Phut
Thailand
PC2 Extension
(Polycarbonate Plant)
Civil Structure
Designer
Responsible for the preparation of PDS 3D
Modelling Frame Work concrete general
arrangement and 2D CAD(Microstation) concrete
details, R.C. details,
Equipment foundation, details, piperacks details and layout plan
1999-2000 Foster Wheeler
Ltd.Thailand
Shell Philippines
Explorration BV (SPEX)
Malampaya Onshore Gas
Plant (MOGP)
Civil Structure
Designer
Responsible for the preparation of PDS 3D
Modelling Frame Work
and layout plan
steelstructure platform G.A. & details &
miscellaneous support smartplant review checked.
1998-1999 Foster Wheeler
Ltd.Thailand
Bayer Polymer Company
Ltd.
PC1 Polycarbonate Project
Civil Structure
Designer
Responsible for the preparation of PDS 3D
Modelling Frame work
Concrete G.A. and 2D CAD(Microstation)concrete
steelstructure platform G.A. & details &
miscellaneous support smartplant review checked.
1997 – 1998 Foster
Wheeler Ltd.
Esso (Thailand) Public
Company Ltd, TARP
Project
Civil Structure
Designer
Responsible for the preparation of Civil works
details and the 2D CAD(Microstation)
steelstructure platform G.A. & details &
miscellaneous support smartplant review
checked.
1989 – 1991
NKK/Tobishima/Marubeni/F
ederal Consortium
Laem Chabang Industrial
Complex Project, Chonburi
Civil Supervisor Responsible for supervisor the construction area zone A controller,subcontractor construction waste water, road, drainage, factory in the zone A, control material, subcontractor used all the area zone A,
check quantity surveyor for construction.
1985 – 1988
Technology Centre Rabtha
Construction,
Site Ghabian Libya
Civil Structure
Designer
Responsible for civil works concrete foundation,piperack G.A., R.C. details, underground services layout drawing road layout plan, drainage layout
system, drawpit and manhole G.A., R.C. details, electrical, instrument cable duct bank for chemical plant
Reference: In case of emergency for contacted
Full Name Mobile Phone Relationship
Thanis Phempool
66-(0-949******
Young brother