Personnel Particular ****

* * * * *

No **, Jalan Dahlia 2/6,

Taman Dahlia,

Bandar Baru Salak Tinggi,

***** ******,

Selangor Darul Ehsan

WAN YUSMAILI BIN WAN YUSOF

E-mail Address : ac773r@r.postjobfree.com

Contact No. : +601*-********

Personal Particulars

Identification No. : 770***-**-**** (New) A 3711427 (Old) Age : 40 Years Old

Sex : Male

Martial Status : Married

Language Dialects : Bahasa Melayu and English

Education Background

Sijil Pelajaran Malaysia (SPM) : 1997

Computer Skills

Microsoft Office :

- Word

- Excel

- Power Point

- Auto-Cad

- Project

Personal Courses Attended

Niosh- Certificate Program Of Safety And Health Officer Niosh- Job Safety Analysis (JSA) Course

: Niosh, Melaka

: Niosh,Jotun & M+W Project

Niosh Safety Course : Niosh Sungai Udang Melaka

CIDB Safety Course : CIDB, Sintok Kedah

CIDB Scaffolding Course (Level 1) Frame, Tubular & Modular Internal Course (QAQC Inspector) – Project Based

: CIDB, Sintok Kedah

: By Project

Personnel Particular 2018

2 P a g e

Synopsis Of Experience

More than 10 (ten) Years experience in construction in Oil & Gas, Power Plant, Petrochemical, Hydrocarbon Terminal, Tank Terminal, Module, Platform & Refinery Project.

Conversant and Familiar with the following Codes and Standard and Specification such as ASME B31.3 (Piping), and API 650 (Tankage) in Petronas Technical Standard (PTS ) and Design, Engineering & Procurement (DEP) - For Shell Technical Standard. Employment History

May 2017 to Present : ExxaOil Engineering Sdn Bhd

Head Quarters, Shah Alam

Selangor.

Post : Piping & Tankage Construction Manager

Scope Of Work Responsible for the management, execution and delivery of construction projects.

Responsible to the Yard General Superintendent/Project Superintendent for overall construction progress, productivity, labor utilization, quality, production methods, safety, coordination with Client and execution.

Accountable to the Projects Manager for project related construction activities, development of the project Construction plan with the Project Planner and then execution within project budget, schedule & contract specifications. Recommended areas for improvement to the Project Manager.

Provide direction, leadership and guidance to the Construction Team in respect of, health, safety and environment; quality, methods and procedures. Productivity, cost & schedule - Continuous Improvement, Resource utilization.

Responsible for enacting proper construction techniques as well as working with the Project Planner/Production Engineer to develop detailed production schedules and then executing the construction operations to meet the detailed schedules and overall project plan. Instruct construction personnel and track the progress of construction, operations such as arrival and utilization of materials, supplies, tools, machinery, equipment and vehicles. Follow all manpower allocation as compared to monthly plans.

Assist securing permits and licenses for project as well as ensure the construction project meet safety codes and regulations.

Review engineering and architectural drawings and specifications frequency as well as consult with design professional’s to ensure that progress is made in harmony with the outlined plans and specs. Collaborate with cost estimators to ensure that expenses are recorded properly and monitor the cost of the project so that the project does not to go over budget.

Meet with the Operations Head, Yard/Workshop Head, Project Manager and other managers required to ensure project are to plan.

Review monthly plans to ensure they are realistic & meet project.

Review all product Progress & Productivity reports.

Perform other duties as assigned.

Personnel Particular 2018

3 P a g e

Sept 2015 to March 2016 : YEM Engineering Sdn Bhd

Batam Terminal Project

PT. Citranusa

Kabil Integrated Industrial Estate

Batam Island, Riau, Indonesia.

Post : Construction Manager

Scope Of Work Responsible for the management, execution and delivery of construction projects.

Responsible to the Yard General Superintendent/Project Superintendent for overall construction progress, productivity, labor utilization, quality, production methods, safety, coordination with Client and execution.

Accountable to the Projects Manager for project related construction activities, development of the project Construction plan with the Project Planner and then execution within project budget, schedule & contract specifications. Recommended areas for improvement to the Project Manager.

Provide direction, leadership and guidance to the Construction Team in respect of, health, safety and environment; quality, methods and procedures. Productivity, cost & schedule - Continuous Improvement, Resource utilization.

Responsible for enacting proper construction techniques as well as working with the Project Planner/Production Engineer to develop detailed production schedules and then executing the construction operations to meet the detailed schedules and overall project plan. Instruct construction personnel and track the progress of construction, operations such as arrival and utilization of materials, supplies, tools, machinery, equipment and vehicles. Follow all manpower allocation as compared to monthly plans.

Assist securing permits and licenses for project as well as ensure the construction project meet safety codes and regulations.

Review engineering and architectural drawings and specifications frequency as well as consult with design professional’s to ensure that progress is made in harmony with the outlined plans and specs. Collaborate with cost estimators to ensure that expenses are recorded properly and monitor the cost of the project so that the project does not to go over budget.

Meet with the Operations Head, Yard/Workshop Head, Project Manager and other managers required to ensure project are to plan.

Review monthly plans to ensure they are realistic & meet project.

Review all product Progress & Productivity reports.

Perform other duties as assigned.

Personnel Particular 2018

4 P a g e

March 2015 to August 2016

: Technip FMC Malaysia

Malikai And Deep Water Platform Project (Shell Upstream Division) Malaysian Marine Heavy Engineering (MMHE)

Post : Piping Supervisor

Scope Of Work Planning and execution of project to ensure maximum productivity within optimum quality and in a safe.

Plan and organize, including generation of programmers. Follow- up optimum resource utilization, Control and monitoring of departments man-hour expenditure including indirect hours, overtimes and days off to workers.

Plan daily and five weekly supervisory and manpower distribution.

Coordinate and liaise with Module Construction Manager, Project Superintendent and other traders, ensuring smooth workflow on project.

Provide back up to the Sr. Foreman for managing and handling projects including providing technical advice as required.

Ensure all work is carried out safely, befitting the high standards of MMHE Drydocks based on Shell Technical Standards (DEP).

Ensure that the safety management programmers on department safety objectives are strictly followed and action is taken against defaulters to prevent recurrence.

Ensure that all work is carried out to the required quality in the best possible manner and within the guidelines of industry’s best engineering practices.

Conduct frequent audits and document the outcomes to verify that enough efforts have been put in the areas of productivity, safety and quality.

Stop processes if they do not meet specified requirement, raise occurrence report, develop corrective action and ensure that rework is carried out to customer satisfaction.

Motivate, direct, align and guide the team for best performance, monitor performance and provide continuous appraisal & feedback. Empower sub-coordinates and provide apt tools and technique including process improvement suggestions and floow up on implementation.

Identify training requirement for sub-coordinates and provide suitable training and guidance.

Take ownership of success or failure of the individual projects and resort to corrective measure to avoid recurrence in future.

Ensure that the safety, Quality & Environment requirement of the project area are followed.

Perform other job related duties as assigned by the section head. Personnel Particular 2018

5 P a g e

Oct 2014 to May 2015

: ALGOTECH (M) SDN BHD

TGAS Project (Phase 1) – Offshore Pipe Line Project Petronas Carigali Sdn Bhd

Petronas Petroleum Complex

Paka, Terengganu.

Post : QAQC Manager

Scope Of Work Responsible for overall implementation and ensuring of all Construction Working Procedures inside Site organization and Subcontractors organization.

In-Charge of training all supervision personnel to ensure they know, and they will be to follow the Contract Quality requirement

To check that construction activities are done in compliance with the Company Rules and Procedures, and the orders received from the Site/Project Manager.

Establishes, as a part of the Project QM Plan, and in compliance with the Company Rules, the Site QM Plan (including audit program).

To ensures that the Client requirement are understood by all parties.

Act as liaison between the Contractor and the Client in matters pertaining to quality control, inspection and testing.

Checks the Subcontractor QAQC procedures to ensure they are consistent with QAQC procedure.

Perform audits (internal/external) on personnel and subcontractor personnel, to ensure they are working in compliance with their approved working procedures.

Manages the NCR issue and follow-up.

Recommends and follow up corrective action to preclude internal

(or external) deficiencies.

Has a clear record of authorized administrative or contractual documents, for and subcontractor personnel.

Ensures that all necessary Quality construction records such as inspection and test document are fled and maintained properly inside and subcontractor organization.

Supports the Site Material Manager (Material Controller) for the preservation of Material & Equipment until handover to Client.

Provides guidance and coordination to establish the Site Working Procedures.

Reports to the Site Manager (Project Manager) the status of QM System and suggest improvements of Quality Management System (QMS).

Personnel Particular 2018

6 P a g e

June 2014 to Oct 2014

: PT TECHNIC (M) SDN BHD

(Sub-Contractor for Frontken Malaysia Sdn Bhd)

ATB TERMINAL & JETTY TOPSIDE FACILITIES PROJECT (Phase II) Tankage Division

Tanjung Bin, Pontian Johor

Post : Construction Manager

Scope of Work Responsible for the management, execution and delivery of construction projects.

Responsible to the Yard General Superintendent/Project Superintendent for overall construction progress, productivity, labor utilization, quality, production methods, safety, coordination with Client and execution.

Accountable to the Projects Manager for project related construction activities, development of the project Construction plan with the Project Planner and then execution within project budget, schedule & contract specifications. Recommended areas for improvement to the Project Manager.

Provide direction, leadership and guidance to the Construction Team in respect of, health, safety and environment; quality, methods and procedures. Productivity, cost & schedule - Continuous Improvement, Resource utilization.

Responsible for enacting proper construction techniques as well as working with the Project Planner/Production Engineer to develop detailed production schedules and then executing the construction operations to meet the detailed schedules and overall project plan. Instruct construction personnel and track the progress of construction, operations such as arrival and utilization of materials, supplies, tools, machinery, equipment and vehicles. Follow all manpower allocation as compared to monthly plans.

Assist securing permits and licenses for project as well as ensure the construction project meet safety codes and regulations.

Review engineering and architectural drawings and specifications frequency as well as consult with design professional’s to ensure that progress is made in harmony with the outlined plans and specs. Collaborate with cost estimators to ensure that expenses are recorded properly and monitor the cost of the project so that the project does not to go over budget.

Meet with the Operations Head, Yard/Workshop Head, Project Manager and other managers required to ensure project are to plan.

Review monthly plans to ensure they are realistic & meet project.

Review all product Progress & Productivity reports.

Perform other duties as assigned.

Personnel Particular 2018

7 P a g e

November 2013 to June 2014

: PT TECHNIC (M) SDN BHD / ALGO TECH (M) SDN BHD JV ARKEMA LYCHEE PROJECT

(Piping Division)

Petronas O&G Village

Paka, Terengganu

Post : Construction Manager

Scope of Work To ensure & Coordinated all the activities of specialty supervisors to ensuring that priority disputes are resolved.

Cooperating closely with the Construction Team to ensure that QA/QC requirement and standard are maintained and that quality issues are monitored and addressed by the site supervision team.

Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient numbers to achieve objectives, promptly advising the Construction Area QA/QC’s/Supervisor’s of any areas of concern.

Ensuring that the quality of work carried out complies with HSE standard.

Monitoring and reporting in conjunction with Project Control personnel, the progress and quality of contractor’s.

Participating in construction meetings with Client QA/QC

/Supervisor’s & contractor’s.

Monitoring/Consult QA/QC documentation produced by contractors (e.g. : QA/QC report,, Construction specifications related to QA/QC requirement, procedures, drawings, etc.) ensuring implementation of established procedures and good engineering practice.

Reviewing and evaluating any change proposals/request, ensuring appropriate technical support is provided in decision making.

Expediting with material control function material delivery, distribution availability in accordance with planned activities, ensuring Contracts & Procurement are notified to purchase lost or missing material.

Ensuring all activities carried out by the contractors are incompliance with the Permit To Work (PTW).

Ensuring all works are properly tested and are in compliance with project and QA/QC standards.

Close Liaison with project QA/QC department and ensuring that all works carried out are in compliance with project QA/QC standards.

Ensuring/Coordinating work Feasibility & Constructability.

Managing interface between contractors to ensure smooth Job Progress.

Ensuring contractors clear all punch list items and final handover of works is completed.

Personnel Particular 2018

8 P a g e

June 2013 to October 2013

: PT TECHNIC (M) SDN BHD

( Sub-Contructor for Technip Engineering Thailand (TET) )

(Piping Division)

HTY Project

Michelin Tyre Factory

Hat Yai, Thailand

Post : Project Superintendent

Scope of Work

To ensure all material received on time & material inspection must be done

Material Storage & to ensure all material receiving status

To ensure all welder’s must attend Welding Qualification Test

(WQT) Conducted/Witnessed by site QA/QC

Interface between contractors to ensure smooth Job Progress in Fabrication, Erection & Testing activities.

To ensure for all Inspection Pipe Line installation indicated in Test Package must be done & verification by Client/Owner

To ensure for Bolt torque inspection for all valve’s & flange joint

To ensure all Pneumatic test for Branches joint & Pipe Support re-pad done by QA/QC

To ensure all the supervisor’s do all the Line Checking before Hydro Testing activity

Blowing & Flushing after hydro testing activity

Preparation for Pre-Commissioning/Commissioning

To review all document before release to Commissioning team

To ensure all Final Hand Over Document preparation done by QA/QC department.

To assist all department to smooth Job Progress

November 2012 to June 2013 : PT TECHNIC ENGINEERING SDB BHD

( Sub-Contructor for PEC (M) Sdn Bhd )

POME & TLB Additive Injection System Project (VO)

Tank & Piping Work

ATB TERMINAL & JETTY TOPSIDE FACILITIES PROJECT (Phase I) Tanjung Bin, Pontian Johor

Post : Construction & QAQC Lead

Scope of Work To ensure & Coordinated all the activities of specialty supervisors to ensuring that priority disputes are resolved.

Cooperating closely with the Construction Team to ensure that QA/QC requirement and standard are maintained and that quality issues are monitored and addressed by the site supervision team.

Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient numbers to achieve objectives, promptly advising the Construction Area QA/QC’s/Supervisor’s of any areas of concern.

Ensuring that the quality of work carried out complies with HSE standard.

Personnel Particular 2018

9 P a g e

Monitoring and reporting in conjunction with Project Control personnel, the progress and quality of contractor’s.

Participating in construction meetings with Client QA/QC

/Supervisor’s & contractor’s.

Monitoring/Consult QA/QC documentation produced by contractors (e.g. : QA/QC report,, Construction specifications related to QA/QC requirement, procedures, drawings, etc.) ensuring implementation of established procedures and good engineering practice.

Reviewing and evaluating any change proposals/request, ensuring appropriate technical support is provided in decision making.

Expediting with material control function material delivery, distribution availability in accordance with planned activities, ensuring Contracts & Procurement are notified to purchase lost or missing material.

Ensuring all activities carried out by the contractors are incompliance with the Permit To Work (PTW).

Ensuring all works are properly tested and are in compliance with project and QA/QC standards.

Close Liaison with project QA/QC department and ensuring that all works carried out are in compliance with project QA/QC standards.

Ensuring/Coordinating work Feasibility & Constructability.

Managing interface between contractors to ensure smooth Job Progress.

Ensuring contractors clear all punch list items and final handover of works is completed.

To ensure all material received on time & material inspection must be done

Material Storage & to ensure all material receiving status

To ensure all welder’s must attend Welding Qualification Test

(WQT) Conducted/Witnessed by site QA/QC

Interface between contractors to ensure smooth Job Progress in Fabrication, Erection & Testing activities.

To ensure for all Inspection Pipe Line installation indicated in Test Package must be done & verification by Client/Owner

To ensure for Bolt torque inspection for all valve’s & flange joint

To ensure all Pneumatic test for Branches joint & Pipe Support re-pad done by QA/QC

To ensure all the supervisor’s do all the Line Checking before Hydro Testing activity

Blowing & Flushing after hydro testing activity

Preparation for Pre-Commissioning/Commissioning

To review all document before release to Commissioning team

To ensure all Final Hand Over Document preparation done by QA/QC department.

To assist all department to smooth Job Progress

Personnel Particular 2018

10 P a g e

Sept 2011 to Oct 2012

: MISI SETIA OIL & GAS SDN BHD (MSOG) /

PT TECHNIC ENGINEERING SDN BHD JV

(Sub-Contractor for Flour Denial International (M) Sdn Bhd

(M1114) ISBL MECHANICAL AND PIPING WORK FOR

SHELL GREEN GASOIL PROJECT FOR SHELL NEW POWER PLANT PROJECT

Piping Division/Pre-Commissioning & Commissioning Team Shell Refining Company - Power Plant Port Dickson

MSOG Melaka Fabrication Yard/Port Dickson, Negeri Sembilan Post : Lead Pre-Com & Commissioning Team

Scope of Work To assist all Pipe Line Check activity is done

To ensure all inspection is done before Hydro Testing activity

Flushing & Blowing activities

To ensure for Bolt torque inspection for all valve’s & flange joint is done & inspected

To ensure all pipe line is complete installation

To ensure that all flange joint connected to all equipment and inspected

To inspect all internal of pipe line is clean before commission

Review inspection document for piping & mechanical (Static & Rotating equipment.

To inspect all equipment nozzle connected with pipe line in good condition

To check all Test Package close before commissioning team intent

Ensure all internal pipe line pressure is release and save to work

Ensure all equipment and pump is calibrate & verify by owner

To ensure all external pipe line is clean & painting application is done

To ensure all pipe line is ready to commission and all flanges connection inspected by client & verify by owner and in good condition

Jun 2011 to August 2011 : PT TECHNIC ENGINEERING SDN BHD

(Sub- Contractor for PEC (M) Sdn Bhd)

ATB TERMINAL & JETTY TOPSIDE FACILITIES PROJECT

Tankage Division

Tanjung Bin,Pontian Johor

Post : QA/QC Inspector Cum to NDT/NDE Coordinator

Scope of Work To ensure all material received on time & material inspection must be done

Material Storage & to ensure all material receiving status

To ensure all welder’s must attend Welding Qualification Test (WQT) Conducted/Witnessed by site QA/QC

Interface between contractors to ensure smooth Job Progress in Fabrication, Erection & Testing activities.

To ensure for all Inspection Pipe Line installation indicated in Test Package must be done & verification by Client/Owner

To ensure for Bolt torque inspection for all valve’s & flange joint

To ensure all Pneumatic test for Branches joint & Pipe Support re- Personnel Particular 2018

11 P a g e

pad done by QA/QC

To ensure all the supervisor’s do all the Line Checking before Hydro Testing activity

Blowing & Flushing after hydro testing activity

Preparation for Pre-Commissioning/Commissioning

To review all document before release to Commissioning team

To ensure all Final Hand Over Document preparation done by QA/QC department.

To assist all department to smooth Job Progress

To ensure all NDT/NDE required must be done

To review all RT film witnessed by Client

To Documented all NDT/NDE report

To storage all RT Film with good condition

Dec 2010 to Jun 2011 : PT Technic Engineering Sdn Bhd P8900 - FAB 3A, Bulk Diesel Storage Tank

AUO Sun Power (M) Manufacturing Project

Rembia, Alor Gajah Melaka

Post : Construction & QA/QC Inspector Lead

Scope of Work

To ensure & Coordinated all the activities of specialty supervisors to ensuring that priority disputes are resolved.

Cooperating closely with the Construction Team to ensure that QA/QC requirement and standard are maintained and that quality issues are monitored and addressed by the site supervision team.

Ensuring that contractor’s duties are performed by competent and experienced personnel and in sufficient numbers to achieve objectives, promptly advising the Construction Area QA/QC’s/Supervisor’s of any areas of concern.

Ensuring that the quality of work carried out complies with HSE standard.

Monitoring and reporting in conjunction with Project Control personnel, the progress and quality of contractor’s.

Participating in construction meetings with Client QA/QC

/Supervisor’s & contractor’s.

Monitoring/Consult QA/QC documentation produced by contractors

(e.g. : QA/QC report,, Construction specifications related to QA/QC requirement, procedures, drawings, etc.) ensuring implementation of established procedures and good engineering practice.

Reviewing and evaluating any change proposals/request, ensuring appropriate technical support is provided in decision making.

Expediting with material control function material delivery, distribution availability in accordance with planned activities, ensuring Contracts

& Procurement are notified to purchase lost or missing material.

Ensuring all activities carried out by the contractors are incompliance with the Permit To Work (PTW).

Ensuring all works are properly tested and are in compliance with project and QA/QC standards.

Close Liaison with project QA/QC department and ensuring that all works carried out are in compliance with project QA/QC standards.

Ensuring/Coordinating work Feasibility & Constructability. Personnel Particular 2018

12 P a g e

Managing interface between contractors to ensure smooth Job Progress.

Ensuring contractors clear all punch list items and final handover of works is completed.

To ensure all material received on time & material inspection must be done

Material Storage & to ensure all material receiving status

To ensure all welder’s must attend Welding Qualification Test (WQT) Conducted/Witnessed by site QA/QC

Interface between contractors to ensure smooth Job Progress in Fabrication, Erection & Testing activities.

To ensure for all Inspection Pipe Line installation indicated in Test Package must be done & verification by Client/Owner

To ensure for Bolt torque inspection for all valve’s & flange joint

To ensure all Pneumatic test for Branches joint & Pipe Support re- pad done by QA/QC

To ensure all the supervisor’s do all the Line Checking before Hydro Testing activity

Blowing & Flushing after hydro testing activity

Preparation for Pre-Commissioning/Commissioning

To review all document before release to Commissioning team

To ensure all Final Hand Over Document preparation done by QA/QC department.

To assist all department to smooth Job Progress

June to Dec 2010 : VSR Automation Sdn Bhd

( Sub-Contractor to M+W Group (M) Sdn Bhd)

Jotun Paint Project

Nilai, Negeri Sembilan

Post : Safety Coordinator/Supervisor

Scope of Work Advise all workers on matters pertaining the HSE/EHS Policy, HSE/EHS Manual, Industrial problem related to health, safety and the protection of the environment.

Ensuring safe working methods are practiced at all time and promote pro-active safety awareness all the work face

Rectification of all unsafe acts and conditions towards creating and maintaining a safe and health working environment.

Ensuring all safety signage’s are maintained and properly located

Ensuring that educate caution and awareness signboard as required to help the promotion of safety awareness amongst employees.

Ensure safety coverage of all workers by qualified personal (Safety Promoter and Foreman).

Ensure compliance with all safety rules and regulation and use of Personal Protective Equipment (PPE) by the work force through the project

To assist the project manager in taking all necessary safety pre- cautions through the project.

To conduct safety surveillance in all workshops and fabrication sites through the project.

Investigate all accidents, near misses, and property or environment Personnel Particular 2018

13 P a g e

damages occurrences to determine the courses and recommend remedial actions

Ensuring that the health and safety plan is a living document and is revised and updated as per project requirement.

Organization safety campaign, seminar, fire and rescue drill, first aided courses and exhibitions to promote safety awareness. Dec 2009 to March 2010 : PFCE Timur Engineering Sdn Bhd

(Sub-Contactor to Foster Wheeler E&C (M) Sdn Bhd)

PSR-2 Revamp Project

Petronas Penapisan Melaka (PPMSB)

Sg. Udang, Melaka

Post : Mechanical & Piping Project Supervisor

(Mechanical & Piping Division)

Unit 20 and 21, Process Area - Area A

Scope of Work Material receiving inspection

Material Storage Inspection and Storage Indicated Area

Welding Qualification Test (WQT) Preparation

Preparation for Piping inspection for fit-up & visual

To ensure all inspection preparation is done

Piping site installation

Monitoring for Fit-up & Welding for Piping Progress

Grouting installation for Pipe Support/Slipper

Grouting coring preparation/activity

Bolt torque activity for All Piping Valve

Line Check and verification

Preparation for Hydrostatic test activity

Preparation Pneumatic test activity

Preparation for Flushing & Blowing activity

April 2009 to Dec 2009 : Bennova Mechanical Engineering Sdn Bhd

(Sub-Contactor to Foster Wheeler E&C (M) Sdn Bhd)

PSR-2 Revamp Project

Petronas Penapisan Melaka (PPMSB)

SG. Udang, Melaka

Post : Mechanical & Piping Area Project Supervisor Scope of Work Material receiving inspection

Material Storage Inspection and Storage Indicated Area

Welding Qualification Test (WQT) Conducted/Witnessed

Documented for Welder’s Qualification after WQT

Piping inspection for fit-up & visual

Inspection for Piping site installation

Do Fit-up & Visual Inspection for Piping

Inspection for Grouting installation for Pipe Support/Slipper

Grouting coring inspection

Bolt torque inspection for All & Piping Valve

Line Check and verification

Personnel Particular 2018

14 P a g e

Hydrostatic test

Pneumatic test

Flushing

To lead and handle QA/QC Inspection for field installation such as :-

: Piping Work (Fabrication)

: Piping Work Field Installation

: Documentation

August 2008 to March 2009 : Grand Western Engineering Sdn Bhd

(Vendor for UMW Fabrication Sdn Bhd)

Gemusut Kakap Lifting Tower Fabrication Project

Sun-Bon Ship Fabrication Project

Lumut Port Industrial Park (LPIP)

Lumut Perak

Post : Steel Structure & Piping Senior Project Supervisor

(Steel Structure & Piping Fabrication Department)

Scope of Work Material receiving inspection

Material Storage Inspection and Storage Indicated Area

Welding Qualification Test (WQT) Preparation

Steel Structure & Piping Fabrication

Preparation for Steel Structure inspection for fit-up & visual

To ensure all inspection preparation is done

Steel Structure & Piping site installation

Monitoring for Fit-up & Welding for Piping Progress

Line Check by ISO drawing

Preparation for DPT & UT (NDT) activity