To work in a company that provides in performance oriented growth stability and professional environment to accomplish progressive goal. A challenging position in a professional organization where I can enhance my skills in conjunction with the company’s goal and objective.

KEY STRENGTH:

Project Management

Handling relationship management activities with various vendors, contractors & service agencies.

Managing contracting deliverables for the successful execution of quality projects.

Installation and Commissioning

Ensuring effective site management and discipline to ensure safe execution of the quality projects.

Installing and commissioning of equipment, providing utility services to the equipment.

Testing & Inspection

Conducting in-house and Factory testing & Inspection with personal involvement to control Quality and Safety.

Cumulative working experience 11+ (years)

ORGANISATIONAL SCAN:

Quest Evaluation and Systems Team Pvt. Limited

From: February 2015 to till date

Designation: FQA Engineer

Work Experience: -

Presently working as Electrical FQA Engineer.

Project Experience as FQA & Factory TPI Engineer

TATA Power SED, Karnataka

From April 2018 to till date

Erection & Commissioning of 11 KV Pole Mounted Switchyard.

Erection, Testing and commissioning of Distribution Transformers.

Erection, Testing and commissioning of 11 KV HT panels, LT Panels, UPS, Batteries, DBs

Knowledge of earth grid lying in overall plant.

Knowledge of AC & DC cable laying as per drawing.

Erection of FA & PA systems &Erection of 1010KVA DG sets.

Conduct continuous routine inspections and monitoring of all activities at site to ensure full compliance with FQP, Contract documents & Drawings.

Preparing MIS Reports, Progress measurement & reporting.

Erection & Testing indoor and outdoor with streetlight Illumination overall plant area.

TPI done from the month of December 2017 to March 2018

LT motors, LT panels, DBs, Batteries, Stringing hard wears.

15 MW Solar Power(s), Suzlon, Ramannapet, Telangana State

From December’2016 to November’17

250 MW Solar Power(s), TATA, Anantapur, Andhra Pradesh-DCR

From May’2016 to November’2016

Erection & Commissioning of 33 KV Pole Mounted Switchyard, 33 KV extension bay with 33 KV line.

Monitoring the equipment installation and their commissioning as per checklists.

Erection and commissioning of 4 MVA transformers & Aux. transformer.

Erection and commissioning of 33 KV HT panels, UPS, SCVS, Batteries, DBs, Inverters, tracker systems.

Knowledge of AC, DC earth grid laying in overall plant area, Solar Illumination systems of Plant.

Knowledge of AC & DC cable laying and trench clearance as per drawing.

Conduct continuous routine inspections and monitoring of all activities at site to ensure full compliance with FQP, Contract documents & Drawings.

Preparing MIS Reports, Progress measurement & reporting.

Monitoring the equipment installation with civil works of inverters, RMUs, Transformers, piling works, WMS, NCUs.

TPI done from the month of January 2016 to April 2016

LT motors, LT panels, DBs, Batteries, Insulators, Stringing hard wears, 250KVA DG.

2X67.5 MW BPPL Power Project at Athagarh near Cuttack Orissa

From February 2015 to December 2015

Erection, Testing & Commissioning of 132 KV Switchyard.

Analysis of specifications, drawings from consultant and vendors.

Knowledge of earth grid lying in overall plant area.

Knowledge of Testing & commissioning control panels, transformers.

Monitoring the equipment installation and their commissioning as per checklists.

Preparation of Check List based on approved specification and BOQ for the project for various project activities and effective implementation of the same.

Conduct continuous routine inspections and monitoring of all activities at site to ensure full compliance with FQP, Contract documents & Drawings.

Preparing MIS Reports, Progress measurement & reporting

ADHUNIK POWER AND NATURAL RESOURCES LTD.

2 x 270 MW TPP, Jamshedpur, Jharkhand

(BHEL make BTG, EBOP with ABB&CHP with MACMET)

From : January 2010 to January 2015

Designation: Engineer

Job Profile : Engineering on 400KV switch yard with control room and 400KV Transmission Line, BOP comments (Review) on drawings & technical documents, Day to day establishment of construction power, Inspection of Transmission towers, utilizing manpower.

Achievements:

Engineering, Planning, Designing and Implementation of 400 KV switchyard for APNRL.

Operation Experience:

Emergency system healthiness checking and updating.

Preparation of Daily Export and Realization reports with compiled data from various sources of plant, incl. PGCIL Meters.

Ensuring proper Declaration of Unit to various customers.

Updating ABT System and compiling of all LTA and STA schedules across India with various RLDC's and Trading Partners.

Timely corrections of any wrong Scheduling in All RLDC Websites.

Ensuring proper revision of LTA and STA scheduling during unit outage.

Carrying out Load Dispatch Center Responsibilities and providing access to power during un-eventful tripping. Co-ordination with ERLDC and PGCIL for system parameters and stability issues.

Preventive maintenance of all HT & LT Motor and its panel and construction power in CHP area.

Project Experience:

33 /0.433 KV Switchyard Erection, Commissioning, Operation & Maintenance.

Entire Wiring design of internal & external wiring of Central Store, Main control room & Local Control room of 400KV Switchyard.

Erection, Testing & Commissioning and Operation & Maintenance of 50KVA and 250KVA DG sets & Moveable DG sets.

Execution of jobs likes testing & commissioning of 3 no. of 1000 KVA, 33/0.415 KV Compact Substation, Construction power works.

11KV, 33KV JSEB & JUSCO Line diversion and lighting arrangement at site.

Surveying of 400KV PGCIL line.

Analysis of specifications, drawings from consultant and vendors.

Understanding of total logics & interlocks of power flow, synchronizing scheme, slow & fast change over schemes, GCB scheme etc.

Temporary power supply and maintenance for different work sites based on requirement of electrical load. Distribution transformer, distribution panel board, & cable laying as per site requirement.

Responsible for follow-up and coordination to ensure timely delivery of equipment as per schedule.

Supervision of panel base frame work and erection of LT panels (Make: Schneider) & HT panels (Make: Siemens).

Erection, Testing & Commissioning of LT transformers (Rating: 1 MVA & 2 MVA).

Cable schedule making, cable-laying termination, Cable jointing of HT & LT.

FEBBI MECH.

Howrah, West Bengal

From : July 2008 to December 2009

Designation : Supervisor

Job Profile : Erection, Testing & Commissioning of electrical equipment

Achievements:

Erection, Commissioning & Testing of HT (6.6 KV) Switchboards.

Testing of CT, PT & Power transformer

Erection, commissioning & testing of HT motors & other electrical equipment.

Cable schedule making, cable-laying termination.

Entire Wiring design of internal & external wiring of Store, Main Office.

Operation & Maintenance of 250 KVA DG set.

QUALIFICATION AND SKILLS:

Diploma in electrical engineering from WBCTE in 2006 with 1st div

H.S. From WBCHSE Board in 2000 with 2nd div

Matriculation from WBBSE Board in 1998 with 1st div.

MS Office, familiar with SAP

Language Known – English, Hindi and Bengali

DECLARATION:

I hereby declare that all the information is true to the best of my knowledge and belief.

Date:

Place: Ashokenagar, West Bengal SWARNENDU HAZRA

S/O Late Subodh Hazra

Date of Birth : 30th June 1981

Ashoknagar Ananda math Pally,

P.S. +P.O. - Ashoknagar

District - North 24 Parganas

West Bengal 743222



Contact this candidate