Abdul Satar Hassan Malo Al Nawab
Email: ***.*******@*****.***
**********@*****.***
Mobil: +964**********
Curriculum Vitae:
Career objective:
Through the academic background and extensive practical experience in the implementation of oil projects and industry projects can make an effective contribution in the implementation of those projects
Profile:
Programming, manpower, equipment, raw materials, time, are key factors in the implementation of any project, but experience and good management of the project leader is the key factor in the success of the project
Work Experience:
My experience consist of many stages, the important stage was that I am employee in Stat Company For Oil Projects ( SCOP) about 14 years, between 1982 to 1995, all those years am working in the site .
From 1982 to 1995 :
_ Resident engineer with Novopignon Italian company to construct gas compression station project in Samawa pump station PS2 on strategic pipe line, the project was to lift the pressure in gas pipe line from 32 kg to 75 kg by using 4 turbines during this projects we make about 10 Hot Tapping points with the strategic gas pipe this was made by Tedy Willim company, there were also Ingeco company for electric work and Incomeic company for mechanical work.
_ Site manager in Kirkuk for construction of pump station and pipe line project to reach the oil fuel to the cement factory, consist of pumps, storage tanks, pipe line, substation …etc
_ Construction development of East Baghdad Oil field as assessment of about 29 oil wells, this project was designed and supervised by Snamprojetty England branch, we used water injection in the field, the project consist of 4 sites, there was construction of shut down building, main substation, substations, gas compressors unites, storage tanks,and many packages such as oil heater, desulter, separator, also there was water treatment unit such as water intake, sedimentation tanks, clarifier, tilting tank.
In this project we enter the programming in construction, time schedule, man hours, and man power
_ Construction the second strategic pipe line project of 1100 mm dia. and 670 km length starting from Basrah to hadetha my responsibility was about 300 km, we worked as groups, grading group, surveying and fixing line group, excavation group, boring group double joint group, stringing group, welding group, sanding group, rapping group sideboom group for laying pipe, etc. Tekfen company was made the double joints.
_ Site manager for construction of Balling gas storage tank project in Dewanea city, we are completed about %80 during the war.
_ Site manager of strategic oil storage tanks project in Razaza city
_ Site manager of making the hydrostatic test of all pipes and tanks in Babylon factory.
_ Site manager for construction of 200 km road behind strategic oil pipe line.
From 1996 to 2003 years :
The second stage of my experience was worked as subcontractor with Geometrical Faw company, between 1996 to 2003 this company related in construction of industrial projects in Iraq
The projects constructed with Faw company are
_ Contract to construct the foundations of grain storage Domes in silo al kadisia, those foundations contain about 3000 pre-cast air channel concrete in different size each one about 5 ton weight
_ Contract for construction of 132 kv building and 500 kv building with 9 m high
_ Contract for construction of two 5 story building in Rasheed hospital
_ Contract for construction of shutdown, main substation, chlorine building, accommodation building in Al Kudis electric station
_ Contract for development project Dora electric station, also we have experience in the anti-static ground floor.
From 2005 to 2008 years:
construction contract with ALAMCO Company supervised by Parson Company in construction of water treatment project in Sader City, there are two contracts.
_Contract for construction of underground inlet water pipe 1000 mm dia. 10 km length which was 3 m underground with high water table level and construct a system of manhole with valves.
_ Contract to construct the sedimentation tanks and filter building which was the main hydraulic concrete tank, consist of underground part contain the pumps and machines, and over ground part contain water filter concrete tanks .
From 2011 t0 2013 years:
_ contract for construction of two stores area for oil pipes, fitting and valves with, this project contained of construction of 4 movable crane 20 tons capacity moving 300 m, also constructed of shads, gantry girder, roads, paving, offices, accommodations building .
_ In 2013 year :
working with British petroleum company(BP) as civil superintendent in development of oil and gas fields in Kirkuk city north of Iraq
_ From 2014 to 2017 year :
project manager in HIGH EDUCATIONAL COMPEX project with Valli Emarate company and Yakoot Towers company Joint Venture in Baghdad ( $ 65 million) cost.
project manager in KARBALA REFINERY with (HDGSK) HUNDY Corian Company for construction main substations
Diputy Project Manager with TERNA Company in Rehabilitation Express highway project ( 145 km) from Nassrya to Basrah ( $ 89 millon) cost, containing paving road, guardrail, pipe and box culvert, check points, and resettlement area.
Educational Attainment:
B. Sc in civil engineering University of Mousal, Iraq in 1977
M.Sc in civil engineering University of Baghdad, Iraq in 1981
Member of Iraqi Engineers Society since 1977
Attended Successfully many professional courses in
projects management, excel, and autocade
Personal Traits:
Follow-up, hard work, decision making, containment, activation of expertise