Post Job Free

Resume

Sign in

tekla steel detailer

Location:
San Francisco, Laguna, 4023, Philippines
Salary:
3000
Posted:
December 29, 2018

Contact this candidate

Resume:

*

R E S U M E

Name: CARLITO TORRALBA ROXAS

POSITION DESIRED: Tekla Steel Detailer

Objective : To work hard with my ability in your Engineering Section Address: Lot 33 Blk 7 Laguna Buenavista Exec. Homes Bry. Barandal Calamba Laguna Cell : 099********, 097********

Email address: ac72rw@r.postjobfree.com.

MY ACHIEVEMENT:

My training in Tekla Structures is 175% faster in detailing compare in Autocad alone In 50mts ht. St. Vincent Ferrer Steel Statue. Accomplished 78 kilometers rough road survey datas and various traffic signal signs and submit to government budget and approval. Design and construct 3.0 x 6.0 x 3.0 mts ground level water tank. Design and build 3 storey residential use of Staad Analysis and Foundation. Design various retaining walls for elevated ground Juice factory, use code ACI. Design and detailed 9.0m x 18.0m x 14.0m length concrete rural bridge, Use AASHTO Lrfd 2014 code. Design and detailed concrete triple box culvert on national road project. Modifies and re calculate 36 nos. of wet piling height for 60.0mts concrete bridge, use of Fine-Geo5 Abutment, investigate soil strata and re calculate pile capacities, use Advanced Soil Mechanics-Braja M.Das.Warehouse design and details use of Aisc-ASD 4th edition + Staad Analysis.

Work Experiences:

Company: EMCICA LDA - Cabinda, Angola

Company Business: Roads & Infrastructures

Position: Civil Designer/Lab. tech.

Date: Oct 2011 – June 2016

Job Description:

Design/detail of proposed apartment and

commercial bldg. Calculate wet piling depth of

25m,30mx0.80m to one bridge. Design 3 cell box

culvert.

Present plan to Govt. a horizontal/vertical

alignment for roads. Design 14m. concrete &

steel bridges in small rivers. Prepare of 78 km.

survey plans rural road in 3 months to submit in

Direção National das Obras de Engenharia.

Company: JV Bilfinger - AL Hamed, Doha Qatar

Company Business: Civil General Contractor

Position: AutoCad Designer

Date: 01 April 2008 – 30 April 2009

Project: DOHA EXPRESSWAY- Package 1 & 2( 16 km. )

2

Assign to make mass fabrication of barriers,

manholes & signage foundation, hardscaping .

Modified plans to submit to construction

consultant for approval & construction. Verifies

manholes of foul sewer, surface water cover top

elevations that those extended above asphalt

finished, for repair those final level and cut

concretes. Verifies, check pipes drainage invert

levels, pipes that clashes to electrical route,old & new qatar-tel, intelligent traffic system and basis on vertical profile design.

Company: OSAIMI ENGINEERING OFFICE.- AL Khobar, K.S.A. Company Business: Geotechnic and Materials Specialist Position: AAAACAD Operator/QC inspector/Lab Tech.

Date: 20 September 2006 – 20 September 2008

Job Description:

Assign at Royal Commission Bldg. to do the

general location of soil investigation of boreholes reports done by all contractors for Jubail 1& 2

Industrial area of all soil drilled boreholes.

Attend as QC inspector, record settlement for

pile testing in compression /tension pile load test, gather datas and authenticate. Help as lab tech do direct shear, sieve analysis & classification, LA

Abrassion, point load, Soundness test, Concrete

Compressive test,

Project Attended/Handle:

Tasnee Ethylene Plant & Sharq Ethylene Plant-

by Keller Turki Co-Jubail, Saudi Royal Navy

Pier Restoration-Jubail,

Pump Station-East West Pipeline (Saudi Oil Co.)

Zuhair Fayez Consultants

Company: Construction Materials Co. Ltd. - Riyadh K.S.A. Position: AutoCAD Operator, Estimator

Date: 22 July 2000 – 01 Dec 2004

Job Description:

Develop plan new office building and

Hangar’s required for production. Use

AutoCAD 2D-3D for Drawing for Mech.

spare parts use in production machine, moulds

to be order/fabricate to Italy.

Company: Almadar Surveying Works - Riyadh K.S.A.

Position: AutoCAD Operator for Survey

Date: 4 April 1999 – 6 May 2000

Job Description:

Contouring & autocad proposed subdivisions,

new roads required to develop lot property

desired by client. Establish benchmark,

centerline,BM’s for new roads survey and put in

plan for consultant/contractor guide for

construction or quantity survey.

Projects:

18 Kilometers Al Khara – Airport road,Abha Al Jazeera Subdivision-Riyadh Company: DMCI - LAING CONSTRUCTION INC. (British-Filipino Joint Venture) Location: 1811 J. P. Rizal, Makati City, Philippines Position: Autocad Architect

Date: May 5, 1997 - June 28, 1998

Business: General Contractors

Projects: Rockwell Luxury Condominium Towers (3.3 billion U$ Project) by Rockwell Land Corp. Job Description:

3

Supervise ACAD drawings, coordinates &

supervised ACAD operators in the standard use

of text layering, text height, scale for standard

details and standard w blocks. Design

Development Team which is composed of

Rockwell Center owner- design consultants

and DMCI - LAING staff. Modifies architectural

plan/interior drawings to be use by sub-

contractors. Issues updated drawing files for the

use by sub-contractors.

Company: ENVIROASIA CORPORATION - Philippines

Position: Civil Autocad Operator

Date: July 15, 1996 - April 29, 1997

Business: Waste Water Treatment Design and Build

Projects:

Kerry Beverages, Chingdu & Kunming, China,

Robinson’s, Ermita & Bacolod, Philippines,

Nathan Beer and Beverages, Suzhou, China

P.T. Multi Bentang (Malaysia)

Pokka Four Seas (China)

& Budweiser Beverages, China

Job Description:

Works on layout plan requiring details and

section and corrections of blockout for piping.

Layout reinforcement bars in concrete walls,

beams and floors slab as shown in

section/connections to the concrete tank.

Drawing plans and details included:

aeration tank, methane reactor basin,

clarified basin, oil separator, control building,

equalization basin, and reinforced rebars .

Company: DM CONSUNJI Inc. - Philippines

Position: Structural Draftsman to Architect-Autocad Date: September 21, 1994 - December 29, 1995

Business: Engineering Contractors

Projects: Don Bosco Parish Multi-Purpose

facility,

Imperial Plaza Foundation Barrette Piles,

5-Storey Housing Project, Malt Silos SMCorp.

17-Storey Pryce (Bagtikan) Tower,

JRF 3-Storey Condominium,

Soil Anchoring/Nailing IEC Tower,

Alabang-Zapote Interchange

Job Description:

Details of bars and concrete connections.

Foundation Detail and elevation. CAD for

Building Permit Detail of all steel

connections.

Detail of Methodology of construction technique.

Design of mass housing project.

.

Company: Metal forming corp.

Position: Steel Detailer

Dates: March 25, 1994 - September 15, 1994

Dates:

Nature of Business: Steel Fabricator

Projects: Batangas Coal Power Plant / Saint Vincent Ferrer Statue (350 tons A36) Job Description:

Enlarge detail with bill of materials of head

chute for coal feeders and conveyors frame /

support of conveyor rubber carrying coal fuel.

Detail for fabrication of head chutes. Input bill of materials. Encode material tag, description, and

gross weight.

Connection details.St Vincent Ferrer Statue 50.0

meters.MTO of materials with tag

markings,beams,columns,Mto total nos. of bolts.

use in the project.Single detailed of gusset and

stiffeners use connection in subframe to column.

4

Education and Courses/short training Dates: Held at.: References:

Names:

Position: COMPANY

Dr. Benito M. Pacheco Former President ASEP - 2000 Arch Noel T. Hipe Architect DMCI Contractor’s Engineers Personal Information

Place of Birth :

Civil Status :

Citizenship :

Date of Birth :

Height :

Weight :

Religion :

Sex :

Dialect in :

Architect Reg. No. :

Kananga, Leyte

Married

Filipino

October 3, 1956

5’5”

130 lbs.

Catholic

Male

Tagalog, English, Portuguese

0012335

TEKLA Structures Advanced Course

TEKLA Structures Intermediate Training Course

Revit Structure 2016 Fundamentals

Project Planning & Control Primavera P6 V8.4

NDT-RT,MPT,LPT,UT Level 1&2

20-24 June 2016

13-17 June 2016

4-6 Jan. 2016

9-11 Sept.2015

27Aug 2012-11Sep

2013

Vibrant Technology Services

Vibrant Technology Services

Stanford IT Learning-CIM

Stanford IT Learning-CIM

Apex Engineering Services

Technical Training of Auto Cad Civil 3D

Welding Inspector Course

Computer Hardware Engineering

6-7 Feb. 2012

25-29 May 2009

04 Apr’03 – 2 May‘03

Maximum Solutions Corp.

Heats School of Technology Inc.

Institute of Computer Engineers

STAAD PRO 2003 Dec.22 - Jan. 14 2004 MicroCADD Technologies, Inc. Microstation / Intergraph by Bentley Jan. 24 - Feb. 20, 1998 Cad Vision 3D Studio Max by AutoDesk Sept. 14 – Nov. 16,

1998

MicroCADD Technologies, Inc.

AutoCAD Customization & Auto lisp December 29, 1996 Crescent Technology Institute AutoCAD Release 12 by Autodesk September 12, 1994 Carltan Computer Camp Bachelor in Science Architecture October 1987 - October 1992

Central Colleges of the

Philippines

Bachelor in Science in Mechanical Engineering October 1985 - Oct. 1987

Central Colleges of the

Philippines

High School March 1972 - March

1976

National Heroes Institute



Contact this candidate