MY ACHIEVEMENT:
My training in Tekla Structures is 175% faster in detailing compare in Autocad alone In 50mts ht. St. Vincent Ferrer Steel Statue. Accomplished 78 kilometers rough road survey datas and various traffic signal signs and submit to government budget and approval. Design and construct 3.0 x 6.0 x 3.0 mts ground level water tank. Design and build 3 storey residential use of Staad Analysis and Foundation. Design various retaining walls for elevated ground Juice factory, use code ACI. Design and detailed 9.0m x 18.0m x 14.0m length concrete rural bridge, Use AASHTO Lrfd 2014 code. Design and detailed concrete triple box culvert on national road project. Modifies and re calculate 36 nos. of wet piling height for 60.0mts concrete bridge, use of Fine-Geo5 Abutment, investigate soil strata and re calculate pile capacities, use Advanced Soil Mechanics-Braja M.Das.Warehouse design and details use of Aisc-ASD 4th edition + Staad Analysis.
Work Experiences:
Company: EMCICA LDA - Cabinda, Angola
Company Business: Roads & Infrastructures
Position: Civil Designer/Lab. tech.
Date: Oct 2011 – June 2016
Job Description:
Design/detail of proposed apartment and
commercial bldg. Calculate wet piling depth of
25m,30mx0.80m to one bridge. Design 3 cell box
culvert.
Present plan to Govt. a horizontal/vertical
alignment for roads. Design 14m. concrete &
steel bridges in small rivers. Prepare of 78 km.
survey plans rural road in 3 months to submit in
Direção National das Obras de Engenharia.
Company: JV Bilfinger - AL Hamed, Doha Qatar
Company Business: Civil General Contractor
Position: AutoCad Designer
Date: 01 April 2008 – 30 April 2009
Project: DOHA EXPRESSWAY- Package 1 & 2( 16 km. )
2
Assign to make mass fabrication of barriers,
manholes & signage foundation, hardscaping .
Modified plans to submit to construction
consultant for approval & construction. Verifies
manholes of foul sewer, surface water cover top
elevations that those extended above asphalt
finished, for repair those final level and cut
concretes. Verifies, check pipes drainage invert
levels, pipes that clashes to electrical route,old & new qatar-tel, intelligent traffic system and basis on vertical profile design.
Company: OSAIMI ENGINEERING OFFICE.- AL Khobar, K.S.A. Company Business: Geotechnic and Materials Specialist Position: AAAACAD Operator/QC inspector/Lab Tech.
Date: 20 September 2006 – 20 September 2008
Job Description:
Assign at Royal Commission Bldg. to do the
general location of soil investigation of boreholes reports done by all contractors for Jubail 1& 2
Industrial area of all soil drilled boreholes.
Attend as QC inspector, record settlement for
pile testing in compression /tension pile load test, gather datas and authenticate. Help as lab tech do direct shear, sieve analysis & classification, LA
Abrassion, point load, Soundness test, Concrete
Compressive test,
Project Attended/Handle:
Tasnee Ethylene Plant & Sharq Ethylene Plant-
by Keller Turki Co-Jubail, Saudi Royal Navy
Pier Restoration-Jubail,
Pump Station-East West Pipeline (Saudi Oil Co.)
Zuhair Fayez Consultants
Company: Construction Materials Co. Ltd. - Riyadh K.S.A. Position: AutoCAD Operator, Estimator
Date: 22 July 2000 – 01 Dec 2004
Job Description:
Develop plan new office building and
Hangar’s required for production. Use
AutoCAD 2D-3D for Drawing for Mech.
spare parts use in production machine, moulds
to be order/fabricate to Italy.
Company: Almadar Surveying Works - Riyadh K.S.A.
Position: AutoCAD Operator for Survey
Date: 4 April 1999 – 6 May 2000
Job Description:
Contouring & autocad proposed subdivisions,
new roads required to develop lot property
desired by client. Establish benchmark,
centerline,BM’s for new roads survey and put in
plan for consultant/contractor guide for
construction or quantity survey.
Projects:
18 Kilometers Al Khara – Airport road,Abha Al Jazeera Subdivision-Riyadh Company: DMCI - LAING CONSTRUCTION INC. (British-Filipino Joint Venture) Location: 1811 J. P. Rizal, Makati City, Philippines Position: Autocad Architect
Date: May 5, 1997 - June 28, 1998
Business: General Contractors
Projects: Rockwell Luxury Condominium Towers (3.3 billion U$ Project) by Rockwell Land Corp. Job Description:
3
Supervise ACAD drawings, coordinates &
supervised ACAD operators in the standard use
of text layering, text height, scale for standard
details and standard w blocks. Design
Development Team which is composed of
Rockwell Center owner- design consultants
and DMCI - LAING staff. Modifies architectural
plan/interior drawings to be use by sub-
contractors. Issues updated drawing files for the
use by sub-contractors.
Company: ENVIROASIA CORPORATION - Philippines
Position: Civil Autocad Operator
Date: July 15, 1996 - April 29, 1997
Business: Waste Water Treatment Design and Build
Projects:
Kerry Beverages, Chingdu & Kunming, China,
Robinson’s, Ermita & Bacolod, Philippines,
Nathan Beer and Beverages, Suzhou, China
P.T. Multi Bentang (Malaysia)
Pokka Four Seas (China)
& Budweiser Beverages, China
Job Description:
Works on layout plan requiring details and
section and corrections of blockout for piping.
Layout reinforcement bars in concrete walls,
beams and floors slab as shown in
section/connections to the concrete tank.
Drawing plans and details included:
aeration tank, methane reactor basin,
clarified basin, oil separator, control building,
equalization basin, and reinforced rebars .
Company: DM CONSUNJI Inc. - Philippines
Position: Structural Draftsman to Architect-Autocad Date: September 21, 1994 - December 29, 1995
Business: Engineering Contractors
Projects: Don Bosco Parish Multi-Purpose
facility,
Imperial Plaza Foundation Barrette Piles,
5-Storey Housing Project, Malt Silos SMCorp.
17-Storey Pryce (Bagtikan) Tower,
JRF 3-Storey Condominium,
Soil Anchoring/Nailing IEC Tower,
Alabang-Zapote Interchange
Job Description:
Details of bars and concrete connections.
Foundation Detail and elevation. CAD for
Building Permit Detail of all steel
connections.
Detail of Methodology of construction technique.
Design of mass housing project.
.
Company: Metal forming corp.
Position: Steel Detailer
Dates: March 25, 1994 - September 15, 1994
Dates:
Nature of Business: Steel Fabricator
Projects: Batangas Coal Power Plant / Saint Vincent Ferrer Statue (350 tons A36) Job Description:
Enlarge detail with bill of materials of head
chute for coal feeders and conveyors frame /
support of conveyor rubber carrying coal fuel.
Detail for fabrication of head chutes. Input bill of materials. Encode material tag, description, and
gross weight.
Connection details.St Vincent Ferrer Statue 50.0
meters.MTO of materials with tag
markings,beams,columns,Mto total nos. of bolts.
use in the project.Single detailed of gusset and
stiffeners use connection in subframe to column.
4
Education and Courses/short training Dates: Held at.: References:
Names:
Position: COMPANY
Dr. Benito M. Pacheco Former President ASEP - 2000 Arch Noel T. Hipe Architect DMCI Contractor’s Engineers Personal Information
Place of Birth :
Civil Status :
Citizenship :
Date of Birth :
Height :
Weight :
Religion :
Sex :
Dialect in :
Architect Reg. No. :
Kananga, Leyte
Married
Filipino
October 3, 1956
5’5”
130 lbs.
Catholic
Male
Tagalog, English, Portuguese
0012335
TEKLA Structures Advanced Course
TEKLA Structures Intermediate Training Course
Revit Structure 2016 Fundamentals
Project Planning & Control Primavera P6 V8.4
NDT-RT,MPT,LPT,UT Level 1&2
20-24 June 2016
13-17 June 2016
4-6 Jan. 2016
9-11 Sept.2015
27Aug 2012-11Sep
2013
Vibrant Technology Services
Vibrant Technology Services
Stanford IT Learning-CIM
Stanford IT Learning-CIM
Apex Engineering Services
Technical Training of Auto Cad Civil 3D
Welding Inspector Course
Computer Hardware Engineering
6-7 Feb. 2012
25-29 May 2009
04 Apr’03 – 2 May‘03
Maximum Solutions Corp.
Heats School of Technology Inc.
Institute of Computer Engineers
STAAD PRO 2003 Dec.22 - Jan. 14 2004 MicroCADD Technologies, Inc. Microstation / Intergraph by Bentley Jan. 24 - Feb. 20, 1998 Cad Vision 3D Studio Max by AutoDesk Sept. 14 – Nov. 16,
1998
MicroCADD Technologies, Inc.
AutoCAD Customization & Auto lisp December 29, 1996 Crescent Technology Institute AutoCAD Release 12 by Autodesk September 12, 1994 Carltan Computer Camp Bachelor in Science Architecture October 1987 - October 1992
Central Colleges of the
Philippines
Bachelor in Science in Mechanical Engineering October 1985 - Oct. 1987
Central Colleges of the
Philippines
High School March 1972 - March
1976
National Heroes Institute