Post Job Free

Resume

Sign in

Engineer Project Manager

Location:
Bhubaneswar, Odisha, India
Salary:
650000
Posted:
December 21, 2018

Contact this candidate

Resume:

CURRICULUM VITAE

N.MAHESH KUMAR, B.E.,

PERMANENT ADDRESS:

OBJECTIVE:

To have a career in technical field which challenges, encourages and recognizes my innovative and creative ideas for the growth of the organization and myself.

WORKING EXPERIENCE:

PROJECT 01:

Project Name: Water Supply Scheme to Karimnagar and other Municipalities.

Employer : M/s. Larsen & Toubro Construction (WET IC)

52/56, Agasthiyar

Sannathi Street,

Kallidai Kurichi,

Tirunelveli (District),

Tamilnadu,

India, Pin – 627416

MOB:- +91-950*******

Email Id :

ac7039@r.postjobfree.com / ac7039@r.postjobfree.com

LINGUISTIC ABILITY

Tamil

English

PERSONAL DETAILS

Father s Name : M.Natarajan

Mother s Name : N.Velammal

Date of Birth

: 07th June 1992

Gender

: Male

Marital Status

: Unmarried

Nationality

: Indian

Religion

: Hindu

Passport No

: L6483098

Date of Expiry : 01/01/2024

Client : Public Health Department, Telangana.

Designation : Senior Engineer (Execution)

Duration : From Dec 2017 to Till Present

Nature of Work:

Construction of ELSRs (0.5 MLD to 2.00 MLD)

Construction of Workmen Habitations

Construction of Compound Walls

Construction of Valve chambers

Pipe Laying of DI Gravity and Distribution Mains (100mm to 700mm) Around 180 kms.

Pumping Mains from Filter bed to ELBR (2.0 MLD with 26 Mtrs. Staging)

Including Commissioning & Maintenance works.

Responsibilities:

To Prepare Necessary Safety Measures for all types of Concrete Work & Excavation work, before enter the Site.

Coordinate with the planning teams, section In-charge, Client, quality department, safety department, Third party from client and achieved the target within given the time period.

To monitor the progress of work on daily basis with all subcontractors. Every day work programs are communicated with clients to clear the work front problems.

Executed the complete survey of Pipe line scope in Adilabad municipality for different parameters like existing pipe line, new proposed pipe line, augmentation lines etc. and finalized the total scope of pipe line in coordination with the clients and design consultancy.

Successfully completed the execution of laying of 120 KMs of DI pipe laying and 8000 Nos. of House Service connections in short span.

Complete the works as per construction program by following Quality & Safety standards as per management requirements.

Complete the works as per construction program by following Quality & Safety standards as per management Requirements.

Coordinate with Client and getting approval before execution/starting of the work.

Maintaining all Quality & Safety reports as per PQP.

Maintain site oriented documents with client signature for client billing, sub-contractor billing purpose.

PROJECT 02:

Project Name: Combined Water Supply Scheme to 147 Habitations in

Alangulam Sankarankovil in Tirunelveli District Including Maintenance for a period of 12 months.

Employer : M/s. Shriram EPC Ltd, (Shriram Group of Company),

Client : Tamil Nadu Water Supply & Drainage Board,

Designation : Project Engineer (Execution cum QA/QC),

Duration : From Sep 2015 to Dec 2017.

Nature of Work:

Construction of Infiltration Well 4.5m Dia.

Construction of Sump cum Pump House 2.15 LL Capacity

Construction of Sumps 0.15 LL to 4.05 LL Capacity

Construction of Pump Rooms 2m x 2m & 6m x 4m Size

Construction of Valve Pits 2m x 1.5m

Pipe Laying DI & PVC Pipes Around 260 kms.

Connecting Mains from Infiltration Well to Collection Sump cum Pump House

Including Erection of Motors Commissioning & Maintenance works.

Responsibilities:

Responsibility for all Site work follow up with Site Engineers of Contractors to ensure that work is being carried out as per drawings & specifications.

Maintained very good relationship with Client, Public and local authorities for smooth progress of work at site.

Implementation of management instructions to the preparation of the operations.

Communication site problems to the management.

Review Material submittals and issue inspection report.

Responsible for preparing work procedure and implementing those procedures into site activities.

Responsible for preparing Each Materials Quantities for Execution of work at Site.

Necessary training being given to all workmen on safety & quality as per management requirement so that they can keep Safety and Quality as their top priority.

Train the subordinates to enhance the productivity of the job with quality and safety as per management requirement.

Preparing daily progress report and highlighting the constraints to the higher management.

Inspection of working areas as per drawing.

PROJECT 03:

Project Name: Providing Combined Water Supply Scheme to 163 rural habitations in

Employer

Keelapavoor unions in Tirunelveli District including Maintenance for a period of

12 months.

: M/s. Shriram EPC Ltd, (Shriram Group of Company)

Client

: Tamil Nadu Water Supply & Drainage Board

Designation

: project Engineer (Planning cum QA/QC)

Duration

: From Nov 2013 to Aug 2015

Nature of Work:

Construction of Water Treatment Plants 8.57 MLD

Construction of Collection Sump 3.10 LL Capacity

Construction of Sumps 0.15 LL to 6.50 LL Capacity

Construction of Service Reservoirs 12m Staging height

Construction of Pump Rooms 2m x 2m to 6m x 4m Size

Construction of Compound walls

Construction of pipe carrying bridges

Pipe Laying Works DI & PVC pipes Around 215 Kms

EMI works with Commissioning & Trail run

Including Maintenance period of 12 months.

Responsibilities:

Evaluate schedule progress and update project schedule on a regular basis with realistic timetable for future work items

Provide quality control assistance at critical times (i.e. before a concrete pour, etc.) to ensure contract compliance

Review project specifications and confer with Project Manager and Project Engineer concerning project requirements; such as plan preparation, acceptance testing, evaluations of field conditions, design changes, and reports

Perform concrete quantity cut-off calculations at the time of pour

Participate in the preparation of the project construction schedule to include dates and the sequence of activities such as craft assignments, crew sizes, project site layout of offices, traffic flow, and material storage

Assist in development of design/drawings for temporary works: for example, shoring, formwork, etc.

Delay Analysis for every works at the time period of project schedule.

Verify compliance with contract specifications and submit certifications/other documentation to the appropriate QC/QA personnel.

Assist in Developing Work Plans, Post Plans Pre-Plans Order Materials.

Analyze drawings, as-built, and other contract required documents to ensure completeness and accuracy and submit to the client with necessary documentation,

PROJECT -04:

Project Name

: Pipe Laying Works for Water Supply Schemes

Employer

: M/s. SAIBALAJI PIPE LINE WORKS

Designation

: Site Engineer

Duration

: From Jun 2013 to Oct 2013

Responsibilities:

Supervising the execution activities for Pipe laying works at site

Direct supervision, monitoring & execution of all construction site activities as per latest Approved drawings ensuring all quality & safety requirements.

Coordination with project Manager regarding the progress of works at site.

Preparing daily/weekly progress reports.

Discussing & managing with the project Manager related to manpower & equipment on daily basis.

Checking of Sub contractor's bills & Preparing RA bill.

Labour Management.

Providing Proper Safety requirements during earth work excavation such as Shoring Plates, Ladders, Barricades & Sign Boards, etc.,

SOFTWARE SKILLS:

Programming languages

: MS Office, C, C++ & (DCA), SAP (ECC 6.04)

Operating systems

: Windows (Microsoft)

Packages

: Auto CAD, STADD Pro, Revit Architecture.

STRENGTH:

Smooth Relationship with Customer.

Timely follow up with Subcontractors.

Convincing Subcontractors to work in critical areas with necessary safety precautionary measures.

Individual and Independent worker

Eagerness to learn new techniques, Self Confidence and Maintaining Punctuality in my job.

EUCATIONAL QUALIFICATION

Examining

Year Of

Marks

Course

Institution

Obtained

Authority

Passing

(CGPA / %)

B.E

M.P.Nachimuthu M.Jeganathan

Anna

8.25

(CIVIL)

Engineering College,

University,

2013

(First Class)

Erode.

Chennai

Tilak Vidyalaya Higher

Secondary School,

HSC

State Board

2009

77 %

Kallidai Kurichi.

Tilak Vidyalaya Higher

SSLC

Secondary School,

State Board

2007

76 %

Kallidai Kurichi.

Personal Traits:

Individual and independent worker

Good team member

Good in interacting with customer and very deterministic.

Eagerness to learn new techniques, Self Confidence and Maintaining Punctuality in my job.

Achievements:

Participated in Marathon for Book Fest-12

Won 3rd Price in District level Science Exhibition.

Declaration:

I hereby confirm that the information given above is true to the best of my knowledge and belief.

Yours sincerely,

(MAHESH KUMAR.N)



Contact this candidate