PERSONAL PROFILE

Name : SUMESH.SIVAN

Gender : Male

Father’s Name : Sivan K

Date of Birth :22nd February1983.

Marital Status : Married

Nationality : Indian

Blood Group : ‘A1’ +ve

SKYPE ID : sumeshsivi

PASSPORT DETAILS

Passport No : N 0733195

Place of issue : COCHIN

Date of issue : 08-07-2015

Date of expiry : 07-07-2025

Emigration status : ECNR

Linguistic ability : Malayalam (Mother tongue) Hindi & English.

.

COVERING LETTER

To

SUBJECT: Application for the post OF LEAD Quality Control Engineer

Dear Sir,

This is Sumesh Sivan. I am working as a Quality Engineer / Welding Inspector for Onshore & Offshore Oil and Gas Construction Industry. Please accept this letter as an expression of my interest in securing a position in your organization. I have held several responsible positions in the past, which have been elaborated in the attached Curriculum vitae. I am looking for a career position in your esteemed organization that needs a professional team player to come aboard and make a marked difference, supporting the organization reach greater heights.

Having worked in various environments, I am confident that I would become an indispensable asset to your organization. My disciplined work habits, tremendous work-drive, ability to work well with people, problem-solving aptitude, and high integrity will enable me to make positive contributions towards your company’s objectives. I am very determined and enthusiastic about a symbiotic relationship and will work hard to achieve positive results.

Enclosed is my Curriculum vita for your review.

Thank you very much for your time and consideration. I look forward to hearing from you.

Thanks and Regards,

SUMESH SIVAN,

Lead Quality Engineer (Onshore & Offshore Oil And Gas Construction)

Siva kripa, Navinjikode Street,

Sekharipuram Post, Palakkad

Kerala- India 678010

Phone : +919*********

Email : ac6z7g@r.postjobfree.com

EDUCATIONAL PROFILE

DIPLOMA in Mechanical Engineering

B.TECH in Mechanical Engineering

OBJECTIVE

Looking for the best opportunity in your esteemed organization where I would be able to utilize and enhance my potential while being resourceful, innovative and flexible.

PROFICIENCY IN COMPUTING TOOLS

Operating System and office: Windows, MS Office 2010

ADDITIONAL QUALIFICATION

DIPLOMA INTERNATIONAL WELDING SPECIALIST-IWS-IIW

CERTIFIED NO-IN/IWS/51400682

CSWIP 3.1 – TWI-Welding Inspector - Level 2

(Certificate Number: 91558. Expiry Date:28-AUG-2019)

Quality Management System Auditor/Lead Auditor (ISO 9001:2008)

International Register of Certificated Auditors (IRCA) certified course.

IMS International Certificated Auditor Course

CERTIFIED ASNT LEVEL II

ULTRASONIC TESTING

RADIOGRAPHIC TESTING

DYE PENETRATE TESTING

MAGNETIC PARTICLE TESTING

VISUAL TESTING

JOB PROFILE

I encompass 14 years of relevant experience in Quality Control Inspection Field. At present I am working as a Quality Engineer in KREUZ SUBSEA PTE. LTD. Oil and Gas. The work experience in the Offshore Oil and Gas Construction & Onshore energy oriented construction fields.

SPECIALIZATION

Prepare of Inspection and Test plan (ITP) per QC-Procedure, Client Specifications.

Prepare of Procedure Qualification records and Welding Procedure specification.

Welding, NDT, Mechanical Testing, Material and Quality Vendor Inspections.

Radiography & AUT Interpretation, Ultrasonic Testing, MPI and LPT.

Inspection of LSAW & Seamless NACE pipe at Pipe mill.

Coating Inspection (3LPE (Corrosion Coating), CWC, Blasting & Painting and Insulation)

Pigging & Hydro testing, Pneumatic Testing Inspection & Related Pre-Commissioning.

Bracelet Anode Assembly and Installation Inspection

Material Usage inspection as per Codes and Standards.

Handing Over Certificate & punch List Closing.

Some of the remarkable projects involved on the above mentioned specialized work activities

Offshore Pipe lay / Onshore Pipeline Installation.

Offshore Pipe lay & SPM Installation.

FPSO Cyrus Installation, Preset Mooring Installation, Proof Load Testing & Riser Flexible Pipe Installation.

I &J– Tube, Riser & Hanger Clamp & Subsea Clamp Installation.

I &J– Tube, Riser & Subsea Tie in spool Fabrication & Installation.

Laying operation of Piggyback pipeline, Flexible pipeline Installation, Thermal Installation (SPU Method FJ Coating) and Inspection.

Grouting Support Installation Inspection and Free span correction.

Manufacturer of Seamless Steel Pipes and Tubes Inspection.

3LPE & CWC Coating Pipe Inspection.

Familiar with frequently used codes & standards ASTM, ASME, DNV, API 5L, API 1104, AWS D1.1, DNV-OS-F101, ISO 13847.

CO-ORDINATION

Co-ordination work have been carried out for Third Party Quality Inspection and handled TPI clients like HSSJV, PEDCO, IOOC, PGS, ABS, DNV, GLIS, DNVGL, VANOORD, INTEC, RIL, RINA, VCS, A&T, DMS, VELOSI, EIL, IRS & CEIL.

EMPLOYERS

KREUZ SUBSEA PTE. LTD.

Since January 2018 to till date.

Designation: Quality Engineer

Valentine Maritime Gulf LLC- Oil and Gas

Since July 2017 to November 2017

Designation: Quality Engineer

UNISON ENGINEERING & CONSTRUCTION PRIVATE LIMITED

Since June 2016 to July 2017

Designation: Quality Engineer

VCS QUALITY SERVICES PVT LTD

Since September 2015 to May 2016

Designation: Inspection Engineer

LEIGHTON CONTRACTORS INDIA Pvt. Ltd. Oil and Gas Division

Since July 2012 to June 2015

Designation: Lead Quality Engineer / Lead Welding Inspector Offshore Pipeline

LEIGHTON WELSPUN CONTRACTORS Pvt. Ltd. Offshore Oil and Gas, INDIA.

Since June 2011 to June 2012

Designation: Quality Engineer/ Welding Inspector Offshore Pipeline

LEIGHTON CONTRACTORS INDIA Pvt. Ltd.

Since January 2007 to May 2011

Designation: Quality Inspector Offshore Pipeline

I.S.C. O INDUSTRIAL Co. Ltd Kuwait (I.S.C.O Services Co)

Kuwait National Petroleum Company.

Since September to December 2006

Designation: Quality Inspector

ANAND Engineering Pvt. Ltd, INDIA

Since July 2004 to August 2006

Designation: Quality Inspector

MAJOR PROJECTS HANDLED

Company : OIL AND NATURAL GAS COPORATION Ltd. (ONGC) INDIA.

Project : BALANCE WORK FOR PIPELINE REPLACEMENT PROJECT-4 (BWPRP-4)

Company : KUWAIT INTEGRATED PETROLEUM INDUSTRIES COMPANY (KIPIC)

Project : KIPIC Al-Zour Refinery Project (Subsea Pipelines Installation, Unit 93)

Company : AVANTGARDE AND TUFF OFFSHORE (A&T)-IRAN

Project : FLOATING PRODUCTION, STORAGE AND OFFLOADING (FPSO CYRUS) Iran.

Company : OIL AND NATURAL GAS COPORATION Ltd. (ONGC) INDIA.

Project : MUMBAI HIGH SOUTH REDEVELOPMENT PHASE-III PROJECT-III(MHSRD-III)

Company : OIL AND NATURAL GAS COPORATION Ltd. (ONGC) INDIA.

Project : HEERA REDEVELOPMENT PROJECT (HRD II PROJECT) Sub Sea Rigid Pipeline

Company : OIL AND NATURAL GAS COPORATION Ltd. (ONGC) INDIA.

Project : ADDITIONAL PIPELINE PROJECT (ONGC) Sub Sea Rigid Pipeline & Flexible pipeline.

Company : OIL AND NATURAL GAS COPORATION Ltd. (ONGC) INDIA.

Project : BALANCE WORK FOR PIPELINE REPLACEMENT PROJECT-3 (PRP-3) (ONGC)

Company : ENGINEERS INDIA LIMITED (MRPL)-INDIA

Project : SPM AND ASSOCIATED FACILITIES PROJECT

Company : OIL AND NATURAL GAS COPORATION Ltd. (ONGC)-INDIA.

Project : PIPELINE REPLACEMENT PROJECT-2(ONGC) Sub Sea Rigid & Flexible pipeline.

Company : BHARAT OMAN REFINERY LTD. (BORL)-INDIA

Project : BINA Refinery Offshore pipeline, COT pipeline & SPM Installation.

Company : ROMPETROL VAN OORD OFFSHORE B.V.- ROMANIA

Project : MIDIA -Pipeline Project, BLACK Sea Romania. (CRUDE Oil Pipeline)

Company : RELIANCE REFINERY PVT. LTD.-INDIA

Project : JAMNAGAR EXPORT REFINERY (JERP) -Offshore Pipeline, SPM & NRPD

Installation

Company : Barath Petroleum Corporation Ltd.-INDIA

Project : Kochi - Offshore & Onshore Pipeline & SPM Installation, (CRUDE Oil Pipeline).

MAJOR PROJECTS OVERVIEW

Project: BALANCE WORK FOR PIPELINE REPLACEMENT PROJECT-4 (BWPRP-4) &DDP

Organization: KREUZ SUBSEA PTE. LTD.

Client: OIL AND NATURAL GAS COPORATION Ltd. (ONGC)

Vessel: KREUZ INSTALLER (Offshore)/Coastal Commander

Position: Quality Engineer

Period: Since January 2018 to till date.

Project Overview: The scope of work in general but not limited to Surveys (preconstruction/ pre-installation and post installation) residual Design & Engineering, Procurement, Fabrication, anti-corrosion & weight coating wherever applicable, internal coating (wherever applicable), Load out, Tie down / Sea fastening, Tow-out / Sail-out, Transportation, Installation of submarine pipeline, riser, I/J tubes, modifications on existing facilities, Hook-up, Testing, Pre-commissioning and commissioning (as applicable) of entire facilities as described in the bidding documents for the following. I) Laying of approx. 86 km of subsea pipelines in 14 segments various sizes II) 20 Nos of Riser Stalk On and Clamp Installation III) 145 Nos of Crossing Correction and 34 Nos of Free Span rectification IV) Pre-Commissioning of 20 Nos of Lines – Rigid and Flexible. V) Topside modifications at 31 nos. platforms. VI) Demolition of 53 nos. of redundant risers VII) Minor/Punch topside works at 23 nos. platforms.

PROJECT: Daman Development Project

12 Nos of Stalk On riser Installation.

Pre-Commissioning of 6 Segments including the 24” TCPP to C24 RP line.

Trenching of 104 Km of Pipelines of various sizes to flush buried state.

114 Nos Concrete mattress installation

6 Nos of Riser Guard Installation / Removal & Reinstatement

1 No of 12” J-Tube Installation at TCPP Platform

1 No of SSIV Installation at TCPP Platform

1 No of Umbilical lay from TCPP Platform to SSIV

2 Nos of Dummy Spool Removal & Subsea Lateral installation

3 Nos of Crossing Corrections

Project: KIPIC AL-ZOUR REFINERY PROJECT (SUBSEA PIPELINES INSTALLATION, UNIT 93)

Organization: VALENTINE MARITIME (GULF) L.L.C.

Client: HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD., AND SAIPEM S.P.A, AND SK ENGINEERING & CONSTRUCTION CO. LTD. JOINT VENTURE (HSSJV)

Vessel: DLB 1600. (Offshore)

Position: Quality Engineer /Field Welding Inspector

Period: Since July 2017 to November 2017

Project Overview: Kuwait Integrated Petroleum Industries Company (KIPIC) is constructing a new world-class grass roots refinery in Kuwait to produce low sulfur fuel oil to replace high sulfur fuel oil used in local power plants. he sea island is a free-standing piled structure capable of berthing four (4) liquid tankers and loading liquid product via marine loading arms. The liquid products shall be transferred to the Sea Island via marine pipelines originating from shore for export.

AL-Zour Refinery Project (Subsea Pipelines Installation, Unit 93), Brief description of subcontractor scope of work is as follows

Installation of 4 x 30Inch-sub-sea pipelines (approx. 17.5km)

Installation of 1 x 10 Inch-sub-sea pipeline (approx. 17.5km)

Installation of 4 x 30 Inch-Risers

Installation of 1 x 10 Inch-Riser

Installation of 4 x 30 Inch-sub-sea tie-in spools

Installation of 1 x 10 Inch-sub-sea tie-in spool

Installation of 2 x 10 Inch-J-tube

Installation of four (4) Fiber Optic Cable (FOC) between onshore junction box and offshore junction box.

Project: FLOATING PRODUCTION, STORAGE AND OFFLOADING (FPSO CYRUS)

Organization: UNISON ENGINEERING & CONSTRUCTION PRIVATE LIMITED

Client: AVANTGARDE AND TUFF OFFSHORE (A&T), Pretorian Development Co. (PEDCO).

Vessel: OCEAN 303/Hyundai-1000/Jaya Pearl-South pars Oil Field Iran.(Offshore)

Position: Quality Engineer /Field Welding Inspector

Period: Since June 2016 to July 2017

Project Overview: Avantgarde &Tuff Offshore (A&T) has been awarded the contract to construct Floating Production, Storage and Offloading (FPSO) facility for the South Pars Oil Layer project by PEDCO. The scope of contractor is to install Riser Balcony at Well Head Platform (WHP) of SPOL A2, 12 point mooring system of FPSO Cyrus and then hook up completion work of the flexible risers from FPSO in the South Pars Oil Field, 100Km off the coast of Iran.

The Mooring system configuration comprises of 12 mooring lines (820m of chains Ø124mm stud less R4 with 27T MA5P Mooreast Anchor each) laid in spread moored manner (3 lines per cluster X 4 clusters) at a distance of 750m from the chain stoppers onboard the FPSO. Length of the Mooring lines will be 820m in all from the fairlead with symmetrical anchor pattern, with an angular difference of 5 with each other. The FPSO will be positioned at 315 (clockwise to Global North), at a distance of 100m from the WHP SPOL A2 existing structure in the field.

The Flexible Risers & Umbilical will be installed between the WHP (SPOL A2) platform and the FPSO.

Riser Balcony Fabrication & Installation

Preset Mooring Installation & Proof Load Testing.

FPSO Cyrus Installation.

FPSO Cyrus Hook up of Riser piping spools at WHP of SPOL A2.

Installation of the Flexible Risers & Umbilical (12’’production line-Length 170m, Water injection- Length 179m & Test header- Length 155m)

Chain Length is 820m/ Ø124mm.

Fluke Angle of the Anchor was set at 32, 41& 50 Degree.

Fabrication and Installation of Top-Side Piping Spool.

Ø90 (Cable) Umbilical installation- Length 179m & Weight element assembly

I-Tube Bottom flange connect with BSC; Top Flange connect Hang-Off split flange.

All flanges shall be aligned with bolts and gasket.

Check all activities related to gasket installation and bolt tightening of flange joint connections.

Project: MUMBAI HIGH SOUTH REDEVELOPMENT PHASE-III PROJECT-III(MHSRD-III)

Organization: VCS QUALITY SERVICES PVT.LTD

Client: OIL AND NATURAL GAS COPORATION Ltd. (ONGC)

Vessel: SAPURAKENCANA-SK-900/SEA JAGUAR

Position: Inspection Engineer

Period: 1st September 2015 to May 2016

Installation of 3 Well head platforms RS-18, RS20 & RS21, Clamp On Structure on RS2 &RS11 Well Head Platforms.

Installation of the underwater conductor Guides

Installation of the conductor Protector

Installation 30’’Diameter conductors

Installation of Deck Extension & Piping.

Checking for consistency with P & I.D, piping plan and isometric drawing as per size, rating and material.

Inspection on materials with test certificate as per the requirements.

WPS and PQR as per ASME section 1X.

Inspecting fit up and welding as per client specification and ASME B31.3.

Monitoring welding as per proper WPS.

Monitoring welding consumables, storage and usage as per project specification.

Knowledge in fittings flanges ASME 16.5/16.47/16.9/16.11

Familiar with TEST Pack, RFI, NCR.

Familiar with MT, PT and RT film interpretation.

Supervision and inspection Welding, Pre-heat and Post Weld Heat Treatment of weld.

Project: HEERA REDEVELOPMENT PROJECT (HRD –II PROJECT) & APP PROJECT

Organization: LEIGHTON WELSPUN CONTRACTORS PVT.LTD

Client: OIL AND NATURAL GAS COPORATION Ltd. (ONGC)

Vessel: LEIGHTON ECLIPSE

Position: Lead Quality Engineer / Offshore Pipeline

Period: 1st July 2012 to June 2015

HRD-II Project Overview : Oil and Natural Gas Corporation Limited, is engaged in exploration and exploitation of oil & gas fields intends to argument its exploitation program by re-developing Heera field.

The scope of work for Heera RD Phase-II Pipeline Project includes surveys (pre-engineering, pre-construction/pre-installation and post-installation) design, engineering, procurement, fabrication, load out, tie down / sea fastening, tow-out / sail-out, transportation, installation, hook-up, testing, pre-commissioning and commissioning of entire facilities for the following: Laying of 11 segments of subsea pipelines (Rigid) of various sizes/services totaling 54.6 Km including subsea tie-in. Laying of 6 segments of subsea pipelines (Flexible) of various sizes/services totaling 19.95 Km. Topside modifications at 13 no. platforms

APP - Project Overview : Oil and Natural Gas Corporation Limited, here in after called as “Company” is engaged in exploration and exploitation of hydrocarbon in Western Offshore field in the Arabian Sea on the continental shelf of Western India.

The scope of work for the Tender shall include in general but not limited to Surveys (pre-engineering, pre-construction/pre-installation and post-installation) Design, Engineering, Procurement, Fabrication, Anticorrosion & Weight Coating, Internal coating ( Wherever applicable), Load out, Tie down / Sea fastening, Tow-out / Sail-out, Transportation, Installation, Hook-up, Testing, Pre-commissioning and commissioning(as applicable) of entire facilities as described in the bidding documents for the following:

Laying of 7 segments of subsea pipelines (Rigid) of various sizes/services totaling

76 Km (approx.) including subsea tie-in.

Laying of 1 segments of subsea pipelines (Flexible) of various sizes/services totaling

1.3 Km (approx.)

Topside modifications at 15.no. platforms.

In addition to above, the scope of work includes 17 Nos. riser removal work from

MHN Pipeline Project.

Project: PIPELINE REPLACEMENT PROJECT-3

Organization: LEIGHTON WELSPUN CONTRACTORS PVT.LTD

Client: OIL AND NATURAL GAS COPORATION Ltd. (ONGC)

Vessel: Regina 250.

Position: Lead Quality Engineer /Offshore Pipeline

Period: 1st July 2012 to June 2015

Project Overview: The Leighton India Contractors Pvt. Ltd. has been awarded the EPC Contract for Pipeline Replacement Project -3. Engineering, pre-construction/pre-installation and post-installation) Design, Engineering, Procurement, Fabrication, Anticorrosion & Weight coating wherever thermal insulation applicable and internal coating (wherever applicable), Load out, Tie down / Sea fastening, Tow-out / Sail-out, Transportation, Installation of submarine pipeline, Laying operation of Piggyback pipeline, internal coating lines, risers and I/J tubes, modifications on existing facilities, Hook-up,,Testing, Pre-commissioning and commissioning (as applicable) of entire facilities in offshore Mumbai.

Included Pipe Laying & completion of 2 Nos thermal insulated pipeline segments.

Laying of 31 Segment of subsea Pipeline (Rigid & Flexible) of various size/service totaling 197.76 Km.

Project Management & Responsibility:

PIPE MANUFACTURING PLANT:

Inspection carried out Vollourec & Mannesmann Tube, Germany for Manufacturing of SMLS Pipes

Fully conversant with AUT, Manual ultrasonic inspection of SMLS pipes of various sizes & grades under third party inspection.

Fully convergent with on-line X-ray/gamma ray of pipe weld &interpretation of radiographs.

Coordinating with third party inspectors.

Fully convergent with magnetic particle testing of pipe bevel ends.

Responsible for overall activities during the shift.

Responsible for preparation of NDT test procedures of different NDT working stations as per the respective code / customer’s technical specification.

Responsible for preparation of QAP & test procedures of different working stations as per the respective code / customers technical specification.

Responsible for Raw material inspection.

Responsible for pipe manufacturing initial & final stages inspection.

Knowledge in destructive testing methods.

Preparing calibration samples as per customer requirement.

Preparing work instructions & maintaining consumables.

Exposure to final stage inspection of SMLS pipes of different size & grades.

Vendors documents review and approval (WPS, PQR, WQT, weld repair and Surface preparation and painting), Review all NDT (RT, AUT, UT, PT and MT) results and approving final results for repairs and review the results. Testing & witness of WPS, PQR & Welders qualification of Subsea pipeline. Receipt inspection in line with the Purchase Order requirements, test certificates review & tractability of same.

Filling, solid Polyurethane Foam Filling, NDT, Pipe Book and Completion Certificate.

TOPSIDE & HOOK UP; PIPING & STRUCTURE

Worked in the modification of piping in Water injection, well fluid, lift gas, fire water, and drain line in Heera Field.

Project Management & Responsibility:

Checking for consistency with P & I.D, piping plan and isometric drawing as per size, rating and material.

Inspection on materials with test certificate as per the requirements.

Inspection on welding consumables on arrival & during process.

Inspection in Dimension wise as per drawing requirements.

Visual Inspection on Before, during &after Welding as per needs.

Conducting Welding Procedure Specification (WPS) & Generate Procedure Qualification Record (PQR).

Witness of Welder Qualification Test (WQT) according to ASME Section IX.

Material tractability (Fitting, Pipe & Consumable Material).

Responsible for the spool marking and welds mapping.

Inspection of piping fabrication and erection according to client’s specification and ASME Code B31.3 & ONGC Specification.

Control of welding material (Electrode, Filler Wire) backing of Low Hydrogen Electrode.

Monitor welder performance and welding activities to ensure work is being carried out in accordance with the approved welding procedure.

Interpretation of radiographs according to ASME B31.3.

Paint inspection of piping according to procedure and specifications.

Inspection of Hydro test, Leak test, Pneumatic test, Flushing/Air Blowing and Reinstatement.

Project: MRPL-SPM AND ASSOCIATED FACILITIES PROJECT

Organization: LEIGHTON WELSPUN CONTRACTORS PVT.LTD

Client: ENGINEERS INDIA LIMITED.

Vessel: Leighton Eclipse & Gal Constructor

Position: Quality Engineer/ Welding Inspector

Period: 1st June 2011 to June 2012.

Project Overview : The MRPL Pipeline and SPM project involves Installation, Testing and Commissioning of Single Point Mooring System (CALM BUOY) and 48-inch Offshore Pipeline including installation of 17,400m of 48” diameter concrete weight coated crude oil pipeline from shore to an SPM located in around 32m water depth, as well as installation of the PLEM, SPM, Approx. 500m, 48’’Dia, concrete weight coated onshore piping works to Booster pumping station. Offshore & Onshore pipeline include hoses and tie in spool and pre-commissioning and testing of the system.

Project Management & Responsibility:

Review all NDT (RT, UT, PT and MT) results and approving final results for repairs and review the results of advanced NDT such as IRIS, ET and MFL and recommend correct mitigation action. Testing & witness of WPS, PQR & Welders qualification of Subsea pipeline. Receipt inspection in line with the Purchase Order requirements, test certificates review & tractability of same.

Inspection of LSAW & Nace pipe at Pipe mill as per API 5L Code & Customer Specification.

Verification of documents, review of material test certificates for plates, filler materials, flex, electrodes, witnessing of welder qualification tests, manufacturing procedure qualification tests, procedure qualification tests as per the client’s requirements. Monitoring of welding parameters, Review of all NDT reports, witnessing of plate UT, Final UT, hydro test witnessing as per client requirements. Interpretation of Radiographic Films as per API 5L.

Witness and inspection of Hydro test as per SBM Guide line & SBM drawings. (PLEM, Subsea hose & floating hose) Supervising and inspection of Subsea Hose & Floating Hose assembly. Inspection & Co-ordination with of Anchor Pile, PLEM Pile & PLEM Installation.

Project: PIPELINE REPLACEMENT PROJECT-2

Organization: Leighton Contractors India P. Ltd

Client: OIL AND NATURAL GAS COPORATION Ltd. (ONGC)

Vessel: Leighton Eclipse & Smit Borneo

Position: Quality Engineer/Welding Inspector

Period: 4th Feb 2009 to 30th May 2011.

Project Overview: ONGC, the field is well developed with an extensive infrastructure of well head platforms, process platform and pipelines. With ageing of field, condition of some its existing pipeline has deteriorated.Planing for replacement of these pipeline. Scope of work includes laying completion of 39 segments, 208.8km including Rigid & Flexible Pipelines.

Rigid Riser with varying diameter from 6”to 24” In Mumbai High N&S & Neelam Fields, All risers will be installed by adopting the Stalk on Method. Pipeline end will be lifted above the surface by multiple Davit lift line, Riser will welded/Stalked on in sections & riser pipeline assembly will be lowered to sea bed.

Fabrication of Riser & Tie in joint, Platform initiation & laying operations of flexible Pipeline.

Inspection and Monitoring of the various activities in CTE Coating, Braslate Anode Installation, Concrete Weight Coating, Fabrication of I-Tube, Flush type Anode, Bell mouth, Flange, Thread- O- let Assembly. Monel Sheathing and ensure that the quality of the product is according to the given specification.

Project Management & Responsibility:

Coordinating with Third party agency, Preparation of Inspection reports, Verification of test reports and Completion of inspection booklets.

Review of material test certificates, as per Codes, Standards and Client specification.

Review of Welding Procedure specification and Welder Qualification records as per Codes, and Client Specifications.

Responsible for fabrication, welding inspection as per Codes, and Client Specifications.

Review of Procedure Qualification records and Welding Procedure specification of sub-contractors.( PQR, WPS )

Visually inspecting the weldments in structural and piping.

Co-ordination in radiographic interpretation with clients.

Responsible for Welding Processes Viz. SMAW, SAW, GTAW, GMAW & FCAW

Testing & witness of WPS, PQR & Welders qualification of piping. Receipt inspection inline with the Purchase Order requirements, test certificates review & tractability of same.

Final inspection (Cut back, Holiday inspection, Coating thickness, marking).

I/J-Tube Fabrication & Installation

Worked on 12'', 20”, 24’’ And 28” I/J-tube installation for Water Injection Line and Composite Cable for

ONGC-Heera and Bombay High Field.

Project Management & Responsibility:

Carrying out welding procedure qualification and Welder Qualification as per AWS D1.1 & Client Specification.

Monitoring the Pipe section and slot as per the drawing.

Carrying out Ultrasonic and MPT inspection.

Verifying Anode Installation as per drawing.

Preparing the documentation for Fit -Up, Weld Visual, NDT, Joint History Sheet and Completion Certificate.

Project: BINA REFINERY PROJECT

Organization: Leighton Contractors India P. Ltd

Client: BHARAT OMAN REFINERY LTD.(BORL)

Vessel: Leighton Stealth

Position: Quality Engineer/ Welding Inspector (Offshore & Onshore pipeline)

Period: 20th August 2008 to January2009.

Project Overview: The BORL Pipeline and SPM project involves Installations, Single point Mooring (SPM) & 48’’pipeline including installation. 48” Diameter concrete weight coated crude oil pipeline from shore to an SPM located in around 32m water depth,14.870km Long Submarine pipeline, with concrete coating including Approx.2.6km Shore pull.48’’Dia. 3LPE pipeline approx. 2.0km long Onshore pipeline include terminal piping works at COT. Offshore & onshore Crude oil pipeline from SPM to COT, Crude oil is Received through Ocean tankers, as well as installation of the PLEM, SPM, hoses and tie in spool and pre-commissioning and testing of the system.

Project Management & Responsibility: Involved in different activities viz. PQT, WQT inspection, incoming inspection of SMAW pipe, and preparation and review of ITP, WPS, WMS & formats.

Monitoring & inspection of 3LPE coating, Concrete weight coating application, Anode fabrication inspection and thermal resistance welding Inspection & expediting the work at vendor’s premises and co-ordination with TPI for approval as per approved project specification & ITP requirements are strictly adhered during execution. Monitoring & physical verification of sub-contractor’s fabrication erection NDT activities. Review and approve vendor quality procedures.

Project: MIDIA PIPELINE PROJECT

Organization: Leighton Contractors Singapore P. Ltd

Client: ROMPETROL VAN OORD OFFSHORE B.V

Vessel: Leighton Stealth

Position: Quality Engineer

Period: July to 2008 August 2008.

Project Overview: Installation of 8.6km pipeline Dia.40’’x20.6mmWT Concrete coated pipeline API-5L-X52, offshore pipeline & flood, clean, gauge & Hydro test of laid offshore pipeline.

Project: JAMNAGAR EXPORT REFINERY (JERP)

Organization: Leighton Contractors India P. Ltd

Client: Reliance Refinery P. Ltd.

Position: Quality Engineer

Period: June 2007 to July2008.

Project Overview : The Reliance Pipeline and SPM project involves Installation, Testing and Commissioning of Single Point Mooring System (CALM BUOY) and 2X48&4X30 inch Offshore Pipeline including installation. 48” diameter concrete weight coated crude oil pipeline from shore to an SPM located in around 32m water depth, 30’’Dia. Concrete weight coated crude oil pipeline from onshore to SPM located in around 32m water depth Two 30’’Dia. line export And other two line, One is water line & Second one is Gasoline, as well as installation of the PLEM, SPM, hoses and tie in spool and pre-commissioning and testing of the system.

Project Management & Responsibility: Witnessing welding procedures & welder’s qualification tests of contractor’s Onshore/offshore 30” & 48” pipeline welding inspection, Field Joint coating, stinger frame fabrication, material inspection & Testing. Sub Sea & floating hoses, PLEM pile drilling inspection & Hydro testing & installation.

Inspection of Installation of SPM, New Riser Platform-D, piling work, piping spool fabrication, Sleeper Installation, Installation & Grouting of Anchor Piles. Inspection of Free span correction of Sub Sea lines.

Project: KOCHI SPM & Offshore Pipeline Installation. (Project 48" Oil Pipe line)

Organization: Leighton Contractors India P. Ltd

Client: Barath Petroleum Corporation Ltd (Kochi Refineries Ltd)

Vessel: Leighton Stealth

Position: Quality Inspector

Period: January 2007 to May 2007.

Project Overview : The KRL Pipeline and SPM project involves Installation, Testing and Commissioning of Single Point