Post Job Free

Resume

Sign in

General Superintendent

Location:
Springfield, MO
Salary:
85000.00 (open)
Posted:
September 07, 2018

Contact this candidate

Resume:

Ernest J. Miller

**** *. ******** **.

Ozark, MO 65721

Cell: 417-***-****

General Superintendent: 20 years experience

Highest Education: 4-Year College Degree

ac6yr6@r.postjobfree.com

Excelling in Commercial Construction.

Main Objective: Bringing all assigned projects in on time, safely and under budget. Zero Lost Time Accidents.

Work Experience:

HGL Construction Inc. Ft. Leonard Wood, MO Superintendent, SSHO Aug. 2017-Jan. 2018

Overseeing installing new chilled water lines to all barracks in Ft. Leonard Wood.

Completed on time and within budget.

Titan LLC Naval Air Station Jacksonville, FL Jan. 2016-Aug. 2017

Superintendent, Safety/Quality Control & Health Manager

SSHO Pouring a ten - acre aircraft parking lot (10’ slab) for (The U S Army corps of Engineers).

Contaminated soil (aircraft fuel) Removed 30 dump truck loads while pouring aircraft parking lot.

Supervised renovating 2 water towers (1-150,000 gallons and 1-250,000 gallons) (The US Army Corps Of Engineers).

Geo-technical Engineer was on site during contaminated dirt removal.

Gridiron Construction, Millington, TN General Superintendent Aug’2015-Dec 2015

Supervised reroofing Navy Exchange Building 752 (750 Squares) with modified bitumen roofing and insulation system, equipment curbs. (The US Army Corps Of Engineers)

Removal and disposal of old asbestos roofing, replaced defective roof decking.

Curtis, Manes, & Schulte, Inc. Ft. Leonard Wood, MO General Superintendent May`14-May `15

Supervised renovating Drew Pippin Grade School (12,000 sq. ft.) & Truman Education Center (225,000 sq. ft.) with modified bitumen roofing and insulation system, including metal flashing, drainage system, exhaust fans, rooftop heat pump units. (The US Army Corps Of Engineers)

Supervised new construction on Shooter 7,000 sq. ft. (classroom) and Stryker Buildings 5,000 sq. ft. (classroom).

J&S Construction Company, Whitman Air Force Base, Knob Noster, MO General Superintendent

Feb.’13 – May `14

New construction 8,000 sq. ft. Logistics Readiness Center with modified bitumen roofing (The US Army Corps Of Engineers).

Supervising the field construction of the project, including its organization, planning, and scheduling in order to complete project on time and within the budget and to the quality specified.

Removed one acre (12 ft. deep) of contaminated dirt. Contaminated dirt had fuel and garbage. Hauled to a contaminated dumpsite. Contaminated area was roped off and red flagged.

Geo-technical Engineer on site during contaminated dirt removal.

DWG & Associates, Scott AFB, IL Safety Manager Jan '12 - Jan '13

Supervised safety renovating Building # 450 (800,000) sq. ft. aircraft maintenance facility with new modified bitumen roofing system including metal flashing, drainage systems, exhaust fans, rooftop heat pump units. (The US Army Corps Of Engineers)

Ensuring compliance with all applicable federal, state, and local code concerning environmental health and safety.

Applied Energy Management Inc., Branson, MO Quality Control/Safety Manager Oct '10 - Jan '12

Dewey Short Visitor Center Branson, MO 17,158.00 sq. ft. (The US Army Corps Of Engineers).

Implemented safety regulations. No injuries on jobsite.

Removed contaminated soil and replaced with 120 dump truck loads of good dirt fill.

Maintained the quality and reliability of product and determined if finished products were of a specified quality.

Geo-technical Engineer on site during contaminated dirt removal.

Range and Civil Construction, LLC, Ft. Leonard Wood, MO General Superintendent Sep '09 - Oct '10

Range 21 (45 cal. pistol range) new construction (7 classroom buildings, bleachers and a control tower).

Range 21 had contaminated soil (aviation fuel) in the watershed area. Removed and replace contaminated soil

Geo-technical Engineer on site during contaminated dirt removal.

Supervising the field construction of the project, including its organization planning and scheduling in order to complete project on time and within the budget and quality specified. (The US Army Corps Of Engineers)

Manson & Hanger, Inc., Kansas City, MO General Superintendent

Ft Stewart, GA, Grand Prairie, TX Ft. Leonard Wood, MO Apr '08 - Aug '09

Completed 47,475 sq. ft. vehicle (tank) maintenance facility, with modified bitumen roofing and insulation system, metal flashing, drainage system, exhausts fans, and rooftop heat units. New construction of 8,084 sq. ft. (fiber optics) company operations office building Ft. Stewart, GA. (The US Army Corps Of Engineers)

New construction 250,000-gallon water storage tank supervised the field construction of project. Ft. Stewart, GA.

Completed 25,000 sq. ft. US Army Corps of Engineers Reserve Center Grand Prairie, TX.

Burns & McDonnell Carswell Navel Air Station FT. Worth, TX General Superintendent Feb '07 - Mar '08

Supervised building 600,000 sq. ft. aircraft hanger & equipment facility, with bitumen roofing (insulation of metal flashing and drainage system, exhaust fans, rooftop heat pumps with equipment curbs).

Supervised the field construction of the project, including its organization, planning, and scheduling in order to complete project on time and within the budget. (The US Army Corps Of Engineers)

Verified safety compliance with all trades-men, enforced safety and quality control polices.

Area building site had been a refueling station for jet aircraft. Removed five acres of contaminated soil (contaminated with aviation fuel) Most of removal site was twenty feet deep.

Geo-technical Engineer on site during contaminated dirt removal.

CMC, Inc. Branson, MO General Superintendent July 1998-Jan 2007

Supervised new construction on 18 story hotel and resort in Santarem, Brazil

New construction 120 bed hospital in the Virgin Islands

Renovated Blue Angels Flying Team hangers Pensacola, FL (The US Army Corps Of Engineers).

BlueScope (Butler Contraction) Kansas City, MO General Superintendent May 1982 - Jan 1998

Supervised building Super K-Mart (900,00 sq. ft. which included food market and restaurant) Vernon Hills, IL

Supervised building: 2-Wal Mart distribution centers, one million plus sq. ft. each with modified bitumen roofing and insulation systems which included metal flashing, drainage systems, exhaust fans, rooftop heat pumps. (Brookfield, FL, Columbus, Ohio).

Aerospace Plants (400,000 sq. ft.- 600,000 sq. ft.). 2 in Texas, 4 in Arkansas, 2 in Alabama all with modified bitumen roofing and insulation systems.

Removed contaminated soil. Removed one entire acre of contaminated soil that had been a pervious landfill site

Ace Hardware Distribution Center 700,000 sq. ft. Maumelle, AR,

Education

Bachelor Degree

University of Wisconsin Structural Engineering, Architecture

Saulk Valley College, John Deer, IL Construction Management Degree

Skills

Certified with The US Army Corps Of Engineers Safety Code (EM385-1).

The US Army Corps Of Engineers Construction Quality Control For Management

OSHA 10 & 30 Hour, CPR/FA/AED Certification, Working From Heights Fall Protection,

Hazard Identification, ECATTC Certificate (Environmental), Lockout Tag out



Contact this candidate