Post Job Free
Sign in

Supply-chain Management, Project Management, DMIAC

Location:
New Port Richey, FL
Salary:
60000
Posted:
September 04, 2018

Contact this candidate

Resume:

Aditya Bochare

813-***-**** ac6xjx@r.postjobfree.com www.linkedin.com/in/aditya-bochare

Current Address: ***** ***** * ***** **** Apt 4107 Tampa, FL 33647, FL 33647

EDUCATION

Master of Science in Industrial Engineering Aug 2016 - May 2018

College of Engineering – University of South Florida Tampa, FL Specialization- Project Management, Process improvement, Supply Chain, Total Quality Management.

Bachelor of Engineering in Automotive Engineering Aug 2012 - May 2016

Rajiv Gandhi Proudyogiki Vishwavidhyalaya Indore, India

Relevant Coursework: Automotive Transmissions, Quality Control, Operation Research

SOFTWARES AND SKILLS

Key competencies: Supply-chain Management, Project Management, Value Stream Mapping, DMAIC, FMEA, Inventory Optimization, Heijunka, kaizan, 8 wastes, 5s, Lean Manufacturing, CPM/PERT, Gantt Charts, Strategic Planning Scheduling, Cash Flow Management, Material Requirement Planning, Inventory Optimization, labor Cost Analysis, Financial Analysis.

Statistical & Analysis tools: Minitab, MS Excel, R Studio,SAS studio.

Visual Presentation Software: Tableau, MS Visio, MS PowerPoint.

Management Software: MS Project, SAP MM.

Database Software: PostgreSQL, Oracle SQL, MS Access.

Other Software: VBA (excel), AutoCAD, Solid works

Certifications: Six Sigma Green Belt, Project Management Simplified.

Publication: 4-Wheel Steering System Mechanism Using DPDT

EXPERIENCE

Aramark (Food & Beverage Assistant) AUG’16 - APR’18

• Maintained production and inventory sheets.

• Communicated with the employees and managed data for improvising shift scheduling.

Prashanti Engineering Ltd (Quality Compliance Intern) JUN’17 - JUL’17

• Reducing the changeover time by 15% and redesigning workflow map along with employee schedules.

• Applied DMAIC processes and QMS – ISO / TS:16949 for process improvement on non-conventional machine lines.

• Drafted work instructions & SOP’s (statement of purpose) forms for other departments to obtain data in an easy manner.

Field trip Expedition Pvt Ltd (Operations Project Coordinator) MAY’13 - APR’16

• Engaged and Built strong working relationships with clients and customers.

• Developed, maintained, and reviewed all project/program documentation (including status reports and reviews).

• Assisted the project managers with monitoring, controlling, updating, and coordinating changes to existing programs and projects.

• Prepared and presented alternate cost-saving approaches for teams and clients.

Volvo Eicher Commercial Vehicle Ltd (Vehicle Prototype Development Intern) JUN’15 - JUL’15

• Stacked & categorized data log of components for all systems in 6X4 and 10X2, tippers and RMCs.

• Edited requirement for all systems in 6X4 and 10X2, tippers and RMCs weekly and reduced process time by 20%.

• Surveyed machine line for improved production forecasting and employee management.

Force Motors Ltd (Machine shop Intern) MAY’14 - JUL’14

• Volunteered for design and manufacturing of the dual mass flywheel under a project initiated by Daimler, India.

PROJECTS

Medical Appointment No-show

• Reduced No-show by 10% and employed Analytical Tools like R-studio for analysis of data.

• Analyzed significance of defects by using Pareto Analysis chart and generated Fish-bone diagram for highlighting the defects.

• Designed Value Stream maps for current state and employed changes for the future state of projects.

Statistical Analysis and Quality Monitoring in a Cookie Manufacturing Plan

• Developed reports by analysis of quality control data and deploying X-bar chart, S-bar chart and Normality distribution.

• Generated Fish-bone diagram for listing Quality Monitoring Failures of Cookie manufacturing.

• Demonstrated results by using statistical tools from Minitab and Tableau.

Financial Statement Analysis

• Performed Financial Statement Analysis to calculate Net Present Value of 10 most valued companies of United States.

• Executed SWOT and PEST analysis to list out 4 most financially healthy and stable companies out of the lot.

• Graded company’s financial health and estimated the percentage of funds to be invested in 4 selected companies.

Specialty Packaging Corporation’s sales forecasting

• Performed long-range forecasting of sales of containers for 2017 based on 8 years of sales data.

• Identified most accurate forecasting method by comparing results.

• Employed 3 different forecasting methods of moving average, exponential smoothing and linear regression.

Housing Contractor Case Study

• Developed CPM/PERT Model to complete the project in 45 days with the probability of 90%.

• Minimized the project cost using crash analysis and crashing the Project cost.

• Reduced the project completion term by 15% and cost by 10% by applying analysis method using MS Excel.

Raytheon – Management of Technological Changes

• Presented Raytheon transformation in pre-owned client network called Rmail and highlighting Importance of Management.

• Highlighted Kotter’s Principal of change and importance of Management.

ISNEE National Go-Kart Championship

• Develop a foldable go-kart in a team of 20 for national level completion organized by Indian Society New Era Engineers.



Contact this candidate