Resume

Sign in

Engineer Project

Location:
Abu Dhabi, Abu Dhabi, United Arab Emirates
Posted:
September 01, 2018

Contact this candidate

Resume:

NATIONALITY

Indian

BORN

October **, ****

NAME

Gauri Shanker Singh

CURRENT LOCATION

Abu Dhabi, UAE

TOTAL EXPERIENCE

>30 years

CONTACT DETAILS

Aria Boutique Block –A, Flat No-504 Electra Street, near New NMC Bldg, Abu Dhabi, UAE

Mobile no. 009****-*******, Phone no: 009***-*******

Email - ac6v52@r.postjobfree.com, ac6v52@r.postjobfree.com

PASSPORT. NO

G0698207

COUNTRY EXPERIENCE- India, Kuwait, UAE and France

EDUCATIONAL, PROFESSIONAL TRAINING AND SAFETY CERTIFICATES

Bachelor of Engineering (Chemical), Regional Engineering College (NIT) – Durgapur (India), 1987

Practical Training in Indian Oil Corporation Limited (IOCL) Guwahati-India for 3 (Three Months)

PROFESSIONAL STANDING

Member-ID:1317902, International Association of Arson Investigators (IAAI- Chapter)

Training in Petrofils Co-operative limited Gujarat, India

Supervisory Development Programmes by Baroda productivity council, Baroda, India.

Self-Development Programmes by Baroda productivity council, Baroda, India.

Training in Engineers Limited, New Delhi, India

Water Injection System

Enhanced Oil Recovery

Offshore structures and upstream facilities

Facilities on an oil field process platform complex

Infrastructure required on off-shore platform

Offshore Safety

Training in Kuwait National Petroleum Company-Kuwait

Environmental Management System (EMS) by TUV in KNPC, Kuwait.

Behaviour Based Safety (BBS) by TUV in KNPC, Kuwait

Occupational Safety by TUV in KNPC, Kuwait

Training in Technip-Abu Dhabi-UAE

Intermediate Construction Safety Training by TUV Middle East Abu Dhabi.

Pre-commissioning & Commissioning Data Base- OPERCOM & ICAPS by TOTAL FINA ELF

Take-Over XP training in house by Technip Middle East Abu Dhabi.

Training in NPCC-Abu Dhabi-UAE

In plant Safety training at Um Al Nar Refinery (Abu Dhabi)

SUMMARY OF EXPERIENCE

A qualified Chemical Engineer having more than 30 years of extensive experience in the oil refining and Gas processing (Oil Refineries, Onshore pipelines, Gas facilities & offshore platforms) and currently works as a Lead Process Safety Engineer, in specializing Process Safety Design (Loss Prevention), Process Design, Plant Operation/ optimization area. More recently, I has been involved in strategic projects in the energy industries, reviewing and improving department manuals

Additional most recently I was nominated as a Project Engineering Coordinator at the enquiry stage for the two strategic projects in the energy sector in UAE

I was also worked for 15 years in India with IOCL’s, GAIL, MRPL, ONGC, and UAE with Gasco, Dolphins and ADMA, FINA (now total) -Abu Dhabi in variety of Commissioning and plant operation roles.

CORE SKILLS

Commissioning Management & Leadership in executing the pre-commissioning, commissioning, installation, Testing, and Maintenance of various Systems of major Oil & Gas. Rich experience of liaising with the Clients, Subcontractors and Suppliers and supervision of all Project related activities from the initial stages of the project till guarantee run and handing over of the Facilities.

Process, Plant Operation and shutdown Trouble Shooting

Man Management, team building training and coaching

Software skill

PHA Works for HAZOP/HAZID study.

DNV Pro 97 for HAZOP/HAZID study.

DNV Pro 5 for HAZOP/HAZID study

HAZOP PC Ver5.0 for HAZOP/HAZID study.

PRODES (In-house) for Process Design.

OPERCOM for pre-commissioning, commissioning, start-up and handover

ICAPS by TOTAL FINA ELF for pre-commissioning, commissioning, start-up and handover

TAKEOVERxp 3.2 Technip Italy, for pre-commissioning, commissioning, start-up and handover

CARRIER OBJECTIVE:

To achieve a challenging and progressive career utilizing my potential to lead a Multidiscipline Commissioning Team for Oil and Gas based Onshore and Offshore Projects.

EMPLOYMENT HISTORY:

2010- Present Lead Safety Engineer, NPCC (National Petroleum Construction Company)-UAE

Current role involves leading the safety engineering discipline, preparation of technical safety reports, review of technical reports prepared by safety team, mentoring of the team members by providing on the job training, review of FEED documents, FEED design endorsement, review of Enquiries / Tender packages, provides inputs to Engineering groups and Detailed engineering. Have been involved in the following major projects in UAE as Safety team lead:-

ARAMCO two Slip over project for 4 and 8 WHPs.

ZCSC Demothballing Flare-B Project ADMA-OPCO, Abu Dhabi, UAE

ADMA-OPCO +100 MBD Upgrade Project, Abu Dhabi, UAE

ADMA-OPCO Pipeline replacement project, Abu Dhabi, UAE

ADMA-OPCO Pipeline up gradation project, Abu Dhabi, UAE

ARAMCO Project of the Arabiyah-Hasbah Field Development, Saudi Arabia

PDO (OMAN) Saih Rawal Depletion Compressor Project,

PDO (OMAN) 3rd Stage Depletion Compression Project (Y3DC)

ADMA Zakum Oil Lines Replacement Project (Phase-1),Abu Dhabi, UAE

ADMA Demothballing Project,Abu Dhabi, UAE (sour service, H2S)

OOCEP (OMAN) Musandam Gas Plant Project

DETAILED RESPONSIBILITY

Lead the team comprising of 3 (three) safety engineers (full time) and two draft man (part time) to performed the following scope;-

Detailed HAZOP, HAZID and SIL studies

SIL verification

Development of Project HSE philosophy

Development of Project HSE Plan

Development of HSE Design basis

Development of Risk register

Development of safety layouts

Gaseous (FM-200) suppression system design development

Development of Fire fighting and lifesaving equipment specification

Participates in the design review

Participates in the 3D model review

Review of Formal Safety Assessment (FSA) studies done by HSE consultant. The FSA include the following detailed studies:

QRA study

FRA study

Dispersion analysis

Dropped object study

Non-flammable Hazard Analysis including ship Collision Analysis

Emergency System Survivability Analysis

Emergency, Evacuation and Rescue Analysis

Temporary Refuge Impairment Analysis,

Safety Critical Element (SCE) Identification Report

Performance standard for submission to verification bodies

Written scheme of examination for submission to verification bodies

Fire water system design and P&IDs development including calculation of fire water demand, sizing of fire water mains, preparation of fire water specifications and Data sheet, selection of fire water pump;

CFD modelling, Noise study, Ergonomic /Human Factor

Provide inputs to other disciplines in the development of the facility orientation (for process and non-process building), general layouts (architectural features with escape routes, emergency lighting system, safety signage etc.), flare system design, shut down and blow-down philosophy, fire and gas layouts,

2001-2003 safety Engineer assigned to NPCC Abu Dhabi from EIL New Delhi India.

Role involves Safety Engineering support to the NPCC safety engineering team. The support provided for the following major project in UAE, Iran and Qatar

Reinstatement of WHT US94-ADMA-OPCO.

UMM AL QUWAIN gas field-off-shore platform (unmanned) project.

Unleaded Gasoline/Low Sulphur Gas Oil Project (ABU DHABI OIL REFINERY).

SATAH desalting/ dehydration & sour water treatment facilities- ZADCO ABU DHABI

BAB UMM-AL NAR refinery crude oil pipeline project- GASCO ABU DHABI

BAB field production facilities expansion project- ADCO ABU DHABI

Upgrade of BHUHASA production facilities- ADCO ABU DHABI

NPCC Accommodations Camp capacity (1200 peoples) at Mussafah Abu Dhabi.

NAFT SAZEH QESHM FABRICATION YARD PROJECT- IRAN.

(NEAD) phase I development project at Al Dhabbiya accommodation camp an Al Dhabbiya yard (ABU DHABI-UAE)

Scribed HAZOPs for BUL HANNE FIELD WHJ BH-MO5 DEVELOPMENT PROJECT- QATAR GENERAL PETROLEUM CORPORATION.

DETAILED RESPONSIBILITY

Assigned as a safety engineer to NPCC from EIL to review FEED and Detailed Engineering Consultant documents;-

Participates and review Detailed HAZOP, HAZID and SIL studies reports

Review SIL verification report

Review Project HSE philosophy

Review Project HSE Plan

Review HSE Design basis

Review Risk register

Review safety layouts

Review Gaseous (FM-200) suppression system design provided by vendor

Review Fire fighting and lifesaving equipment specification

Review of Formal Safety Assessment (FSA) studies done by HSE consultant. The FSA include the following detailed studies:

QRA study

FRA study

Dispersion analysis

Dropped object study

Non-flammable Hazard Analysis including ship Collision Analysis

Emergency System Survivability Analysis

Emergency, Evacuation and Rescue Analysis

Temporary Refuge Impairment Analysis,

Safety Critical Element (SCE) Identification Report

Review Performance standard for submission to verification bodies

Review Written scheme of examination for submission to verification bodies

Review Fire water system design and P&IDs development including calculation of fire water demand, sizing of fire water mains, preparation of fire water specifications and Data sheet, selection of fire water pump;

Review CFD modelling, Noise study, Ergonomic /Human Factor reports

Provide inputs to other disciplines in the development of the facility orientation (for process and non-process building), general layouts (architectural features with escape routes, emergency lighting system, safety signage etc.), flare system design, shut down and blow-down philosophy, fire and gas layouts,

2006-2010 Senior Commissioning Engineer – Process Support- Technip-UAE

Role involves review of tender packages; provide inputs to tender, preparation of documents such as pre-commissioning, commissioning and operating start-up manual for the following projects;

Additional Boosting Facilities Kharir Basement Phase-1- Total Yamen

Offshore Khuff Gas Project- Total ABK, Total Yamen

Lead Commissioning team Pre-commissioning, commissioning, start-up and handover of 320 Km Qatar Gas pipeline to Dolphins Taweelah (Abu Dhabi) receiving facilities and distribution to consumers (GASCO) Abu Dhabi, UAE

Lead Commissioning team for Gas Processing Facilities project-ADMA –OPCO, Abu Dhabi UAE

ADGAS (SAS) full fill development project-ASAB 2, 3 &4- ADCO, Abu Dhabi UAE

New Water Injection Platform-Capacity upgrade project-ADMA-OPCO, Abu Dhabi UAE

DETAILED RESPONSIBILITY

Lead the team comprising of 3 (three) commissioning engineers including one ICAPS Engineer -process support (full time) ICAPS operator (part time) to performed the following scope;-

To lead a Multidisciplinary Commissioning Team including Process, Electrical and Instrument & Mechanical Engineers.

Preparation of Overall Commissioning schedule and Mobilization schedule.

Review of engineering documents.

Review Project Schedule.

Preparation of Operation Test procedure

Preparation and Review of Commissioning Deliverables including Vendor documents, Commissioning Procedures, Run Test procedures, Operational Test Procedures etc.

Coordination with Construction team to highlight Commissioning Priorities.

Nitrogen Helium Leak testing for Topsides.

Technical preparation and deliverables

System identification and preparation in the P&IDs

ICAPS and system/Subsystem mark-up: Upon issuance of approved project P&IDs and system list for any EPC job, the commissioning lead organises the preparation of necessary subsystem mark-up drawings with the help of the section draftsman. These AUTOCAD generated drawings becomes the basis for ICAPS data base population and subsequent progress monitoring reference.

Preparation of operating manual

Preparation of pre-commissioning manual

Preparation of Commissioning manual,

Preparation of Start-up Manual

Preparation of Hand over manual

Vendor assistance and mobilization plan.

Pre-commissioning Execution

Punch list

Permit to work

Commissioning Execution

Start-up and test run execution

Facilities Handover

Interface

Preparation of commissioning spare part list.

Preparation of test equipment’s requirements.

Conducting FAT, SAT for DCS, ESD, F&G systems and other package items

Good understanding of Integrated Commissioning and Progress System implementation on Projects.

Involved in providing extensive Field Engineering support to the Home engineering team, Leading and Managing the Construction and

Commissioning activities & developing good rapport with Clients.

Conversant with Oil & Gas Industry (Onshore / Offshore), Petrochemicals, and Refinery etc. related standards and practices.

2004-2006-Process Safety Engineer-KNPC (Kuwait National Petroleum Corporation)

Role involves Safety Engineering support to the KNPC engineering team. The support provided for the following major project in KNPC-Kuwait

Mina Al Ahmadi and Shauiba Refinery Kuwait

Two marketing terminal Sabhan and Ahmadi.

Future third marketing terminal depot

DETAILED RESPONSIBILITY

Hazops and safety audits of three Refinery and their marketing terminals and petrol filling stations.

Risk assessment of fire fighting system of two marketing terminal Sabhan and Ahmadi.

Technical evaluation of New “Vapour Recovery Unit” for two marketing terminals sabhan and Ahmadi

Hazops for Truck loading facilities at Shuaiba Refinery.

Process/safety verification study done for increasing flow rate for each loading arms at two marketing terminal depot Sabhan and Ahmadi.

Feasibility study for Future third marketing terminal depot & leak detection system of cross-country pipelines and presented management the requirement of leak detection system of the existing pipeline.

1996-2004 Manager Plant Operation and Safety-EIL (Engineers India Limited)-India-Delhi

Role involves leading the commissioning and safety engineering discipline, preparation of technical commissioning and safety reports, review of technical reports prepared by commissioning and safety team, review of Enquiries / Tender packages, provides inputs to Engineering groups. Have been involved in the following major projects in India, Kuwait, UAE as commissioning and Safety team lead:-

SRU (Revamp Project), Merichem unit LPG gasoline treatment for FCCU, LPG treatment for FCCU, ATU for FCCU, FGSU for FCCU, Haldia, India

CRL Cochin, India DHDS unit & MRL, Madras India DHDS unit

IOCL (Panipat) India, HCU, FCCU, H2, Xylene fractionation, Tatoray, Parex, Isomer, Shell Sulfonate, NHT, CCR Platforming Regeneration and Recovery Plus, Benzene Toluene Extraction Fractionation Units.

Crude Distillation Unit/New Crude Distillation Furnace, KUWAIT (Mina Al-Ahmadi Refinery).

Unleaded Gasoline/Low Sulphur Gas Oil Project ABU DHABI (Abu Dhabi Oil Refinery).

US94 well head tower (unmanned Platform) ABU DHABI (MARINE OPERATING COMPANY).

Bab-Umm-Al-Nar Refinery crude oil pipeline 127 Kms long pipeline ABU DHABI.

US94 well head tower (unmanned Platform) during Basic engineering ABU DHABI MARINE OPERATING COMPANY (ADMA-OPCO)

Sour Water Stripper Unit/LPG Facility, Bharat Petroleum Corporation Limited, INDIA (Mumbai).

Hydrocracker Unit, Indian Oil Corporation Limited, INDIA Panipat.

Fluidised Catalytic Cracking Unit, Indian Oil Corporation Limited, INDIA (Panipat/Haldia).

Hydrogen (H2) Unit, Indian Oil Corporation Limited, INDIA (Panipat).

Diesel Hydro De-Sulphurisation Unit, INDIA (Madras/Cochin Refinery limited).

Flue Gas Scrubbing Unit for of Fluidised Catalytic Cracking Unit, Indian Oil Corporation Limited, INDIA (Haldia)

Gas supply to Taweelah ‘A” Power and Desalination plant (GASCO). Abu Dhabi (UAE)

Amine Treatment Unit for of Fluidized Catalytic Cracking Unit, Indian Oil Corporation Limited, INDIA (Haldia).

LPG treatment for Fluidized Catalytic Cracking Unit, Indian Oil Corporation Limited, INDIA (Haldia).

Merichem Unit LPG & Gasoline treatment for Fluidized Catalytic Cracking Unit of Indian Oil Corporation Limited, INDIA (Haldia).

Sulphur Recovery Unit (Revamp Project) Indian Oil Corporation Limited, INDIA (Haldia).

Numaligarh Refinery Marketing Terminal (Assam) and Haldia Petrochemicals Limited India. BPCL (Bombay) India SWS, LPG Augmentation facility

DETAILED RESPONSIBILITY

Lead the team comprising of 2 (two) safety engineers (full time) and one scribe (full time) to performed the following scope;-

Facilitates HAZOP and HAZID workshops

Prepare safety philosophies

Develop HAZOP and HAZID tracking registers

Provide safety engineering support for onshore oil and gas projects during design and operation phases

Preparation of tender documents (including CTSs) for contracting assignments on safety engineering.

Role involves pre-commissioning, commissioning, plant operation, pipelines, start-up, guarantee run and hand over for the following projects;

The 1250-km Jamnagar-Loni LPG pipeline of Gail (India) Ltd is the world's longest exclusive LPG pipeline.

Digboi Refinery Modernisation Project, IOCL & Numaligarh Refinery Project, BPCL (Assam, India), CDU/VDU/DCU/U&O.

In-situ combustion project Oil & Natural Gas Corporation Limited (ONGCL), Santhal and Balol-I, Mehsana (Gujarat, India) & New LPG sphere for Central Processing facilities Gandhar Phase-I (ONGCL, India).

Gas dehydration unit, Condensation Fractionation Unit, Gas sweetening Unit and Kerosene Treatment Unit of ONGCL, Hazira, Phase-IIIA.

Bongaigaon Refinery Petrochemical Limited (BRPL), Assam, India, DCU/ LPG bottling plant.

GAIL-Lakwa (Assam, India), LPG Recovery unit.

CPCL (Chennai, India) expansion project, CDU/VDU/DCU/U&O/ H2/ SRU/SWS/HCU/Merox.

New Delayed Coker Unit (NDCU) of Digboi Refinery, Indian Oil Corporation Limited (Assam).

Delayed Coker Unit (DCU-1) LPG Recovery section 2nd stage caustic wash of Bongaigaon Refinery Petrochemical Limited (BRPL) and LPG bottling plant of BRPL (Assam, India).

ARU Revamp & Offsites Modernization Indian Oil Corporation Limited (Mathura, India).

Expansion Project CDU/VDU/U&O/ H2/ SRU BPCL (Bombay, India) & DHDS/Offsite project CRL, (Cochin, India).

DETAILED RESPONSIBILITY

Lead the team comprising of 8-10 commissioning engineers including site construction team (full time) to performed the following scope;-

COMMISSIONING

To lead a Multidisciplinary Commissioning Team at site including Process, Electrical and Instrument & Mechanical Engineers.

Preparation of Overall Commissioning schedule and Mobilization schedule.

Review of engineering documents.

Review Project Schedule.

Preparation of Operation Test procedure

Preparation and Review of Commissioning Deliverables including Vendor documents, Commissioning Procedures, Run Test procedures, Operational Test Procedures etc.

Coordination with Construction team to highlight Commissioning Priorities.

Nitrogen Helium Leak testing for Topsides.

Technical preparation and deliverables

System identification and preparation in the P&IDs

Preparation of operating manual

Preparation of pre-commissioning manual

Preparation of Commissioning manual,

Preparation of Start-up Manual

Preparation of Hand over manual

Vendor assistance and mobilization plan.

Pre-commissioning Execution

Punch list

Permit to work

Commissioning Execution

Start-up and test run execution

Facilities Handover

Interface

Preparation of commissioning spare part list.

Preparation of test equipment’s requirements.

Conducting FAT, SAT for DCS, ESD, F&G systems and other package items

Good understanding of Integrated Commissioning and Progress System implementation on Projects.

Involved in providing extensive Field Engineering support to the Home engineering team, Leading and Managing the Construction and

Commissioning activities & developing good rapport with Clients.

Conversant with Oil & Gas Industry (Onshore / Offshore), Petrochemicals, and Refinery etc. related standards and practices.

PROCESS DESIGN

Numaligarh Refinery Marketing Terminal for process design package. The facilities include storage of Naphtha, HSD, LDO, LPG and product loading facilities.

Haldia Petrochemicals Limited for process design package. The system included the feed storage (Naphtha, LPG), intermediate products handling (Propylene, RPG, HPG, C5-C6mix) including storage and dispatch facilities and the product storage and product loading facilities for Butadiene, propylene, CBFS, Benzene etc. The system also included Propylene refrigeration system and Benzene recovery system.

1992-1996 –Management Trainee-Petrofils Co-operative Limited India-Baroda Unit

Role and responsibilities involves the followings:-

Joined as a Management trainee, got in plant training and made direct responsible for running the shift and routine operation of the Polycondensation Unit for Petrofils Co-operative Limited, Vadodara Unit, Gujarat.

The other units associated with this Plant are:

Marlotherm heating Unit.

Storage facilities for DMT (Di-Methyl Terapthelate) and EG (Ethylene Glycol).

Chilling Unit.

Utilities like Plant air, Inst air, Steam, Cooling water.

1989-1996 –Senior Process Engineer-Petrofils Co-operative Limited India-Ankleshwar Naldhari Unit

Role and responsibilities involves the followings:-

Precommissioning and Commissioning, Startup of Utilities like compressed air system, nitrogen plant, cooling tower, cooling water system, DM water system, chilling system, Boilers and ETP.

Precommissioning and Commissioning, Startup of Spinning of Nylon-6 plant.

Precommissioning and Commissioning, Startup of Nylon-6 plant.

Worked as a shift engineer in Spinning section of Nylon-6 plant.

Worked as a shift engineer in Ploycondensation section of Nylon-6 plant.

The other units associated with this unit were:

Dowtherm heating unit.

Storage facilities for caprolactum.

Nylon-6 chips dryer.

Utilities like plant air, inst air, nitrogen, steam, cooling water and chilled water system.

Precommissioning and commissioning, Startup of polyster plant and worked as a shift engineer in the same plant.

The other units associated with this unit were :

Marlotherm heating unit

Storage facilities for DMT/PTA

Storage of Polyster chips

Utilities like plant air, inst air, nitrogen, steam, cooling water and chilled water system.

Initiated minimizing waste generation, sludge transfer, toxic and catalyst handling,

Initiated process controls, trouble shooting, optimization of utility consumption & Heater -fire control.