Haleem Qaiser, BS Engineer, MBA-Management

Cell: +1-832-***-**** Email: *****************@*****.***

** *****’ experience (EPC Projects, Petrochemical, Refineries, Oil & Gas, Fertilizers, QA/QC and HSE), Objective: Seeking position of Lead Electrical Engineer in construction project, Oil & Gas, Powers sector, Petrochemical and high-rise buildings.

Career Summary: Provided leadership and direction to teams of multi-discipline, planning, monitoring and control for accomplishment of objectives of project. Coordination within project, among different departments, such as engineering, HSE, construction, quality, procurement, Commissioning & handover.

Reviewed drawings, vendor documents, procedures of FAT, SAT, pre-commissioning, commissioning and walk through for mechanical completion. EPC Projects of Oil & Gas, Petrochemical, Phosphate plant, Warehouses equipped with automation, high security buildings, e.g. airports and hotels. Analytical review of schedule, planning, material, machinery, skilled manpower and smart cost decision for reduction of cost. Preparation of quality control plans, checklists, ITP, procedures for inspection, evaluation of competency of contractors. Installation, testing and commissioning of electromechanical equipment and indoor/outdoor Substations.

Accomplishments:

Delivered safe, workable, reliable and economical power distribution system, fed from 230kV substation (client’s substation).

Delivered, Process control and monitoring system from control room and field.

Resolved hanging critical issues and made satisfied to client and design engineer.

Being a leading part of PMT, successful completion of multibillion Project,”IR II DBN Mega Project” at Yanbu, Saudi Arabia. ($2,100,000,000.00)

Additional DAP Warehouses & Associated Facilities, Ma’aden at Ras Al Khair, Kingdom of Saudi Arabia ($700,000,000.0)

Completion of challenging Project, which was 50% delayed and out of scheduled time.

Played exemplary role in Project Management received a certificate from higher management.

Reduced cost of projects and saved budget of company.

International travel to represent companies in different countries for meetings and FAT.

Critical Skills:

Detail presentation for President and VP about achievements of critical milestones and further plans.

Strong interpersonal skills to work with multiple disciplines and managers.

Strong experience of dealing with multiple cultures, people, languages and nations.

Computer Skills (MS word, Excel, PowerPoint, Java Programming & Software Solution).

Excellent team leader & member; target oriented, customer focused.

Languages: English, Urdu, Punjabi, Hindi and Arabic).

Implementation of safety policies; 20 Million Safe Man Hours without any human loss or serious injury.

In depth knowledge of International standards, e.g. NETA, NEMA, API, OSHA, NEC, IEC, UL, ANSI, IEEE, ISA and Saudi Aramco, Sabic, Maaden standards, McDermott International Inc. (iDoc, iShare).

Traveled internationally, domestically to represent Company to evaluate contractors and vendors.

Registered Engineer with Pakistan Engineering Council.

Registered Engineer with Saudi Council of Engineer.

Education:

2007 - BS Electrical Engineering.

1997 - Associate Degree, Electrical Engineering.

2017 - MBA-Management.

Professional Experience:

McDermott International

Job Title: SR. Electrical Engineer-Technical services, April 2018 to July 20, 2018.

LACC Project, Westlake, Louisiana.

Provided technical services to construction teams of electrical and instrumentation, resolved their technical issues with safe, workable and reliable recommendation accordingly.

Resolved clashes of overlapping/insufficient clearance among different disciplines’ construction installation.

Extremely serious issues work not done as per drawings are resolved by convincing to client and design engineer with expert logics and technical arguments.

Cable termination of RIE, CCB and E-House and related activities.

Resolved installation issues and deficiencies of packages material, provided by vendors, e.g. Recycle Comp. (C-115), Reclaim Comp. (C-230), Thermal Oxidizer (U-910) and water treatment (U-550), Analyzers (Sheltered, Field Mounted) by acceptable opinion accordingly.

13.8kV, E-House fed from 230kV substation of Lotte Chemical.

Coordinated with vendors and suppliers to avert any delay in completion of project.

Meetings with client and subcontractors regarding RFI’s.

Coordinating with vendors, suppliers and sister companies for availability of material on site in time to avoid any delay in project activities.

Attended meetings with client and design engineers for multiple issues and found acceptable solutions accordingly.

Proposal for technical issues which had been hanging prior to my joining and resolved them.

Application of engineering standards and safety procedures to avert any loss of human life and property.

Safety is the priority.

Saudi Arabian Mining Company. December 2013 - October 2017

Job Title: Senior Project Engineer

Provided leadership and direction to engineers for review of SOW, design drawings, documents, procedures for electrical/Instrumentation, HSE policies and quality documents.

Led, managed and monitored installation of electrical/Instrumentation indoor and outdoor equipment, e.g., Power & control cables, Panels, transformers, switchgears, control gears, motor control centers, UPS, battery rooms, generators, compressors and pumps, motors’ solo run test, loop wiring of instruments, field junctions boxes, consoles, Marshaling cabinets, CCR, etc.

Reviewed electrical/Instrumentation project quality plan and cheek-lists for inspection as per standards.

Reviewed project documents for implementation of quality procedures as per standards.

Direction for material storage, handling and preservation of electrical/Instrumentation equipment, components, cables, hardware, etc.

Managed, directed the teams for executions of electrical/instrumentation, pre-inspection, pre-commissioning and energizing of substations.

AC & DC motor drives, PLC’s, I/O hardware, MCCs, industrial control networks, analog and digital I/O devices and wiring.

Managed and monitored activities: Grounding/Breaker Installation/Terminations/Continuity checks/ instrument installation / Loop checks / System Function checks / P&ID check outs / of contractor’s works execution during Capital Project installation.

Bench and field calibration of pneumatic and electronic instruments, e.g. pressure, flow, temperature, level, transmitters, etc.

Fire alarm system, public address system, CCTV, communication system and networking systems.

Senior project Engineer September 2010-November 2013

IR II DBN Mega project at Ibn Rushd, Yanbu, kingdom of Saudi Arabia

Reviewed design drawing, documents, specification data sheet, method statement, I&TPs and procedures for Electrical, Instrumentation and communication.

Planned schedule, provision of material, manpower, machinery and safety for construction activities of project.

Led the contractor for their specific activities, method of statements and provided technical support to them and chaired meetings with contractors and vendors.

Directly and indirectly monitoring of all activities of construction, pre-commissioning, commissioning and final handed over to client.

Developed policies for safety training and equipped all site engineers and workers with necessary training for the safety of human lives and materials.

Introduced specific ID card and training for those who participated in energizing of substations and outdoor electrotechnical equipment.

Other Companies.

Company: Saudi Aramco Berri gas plant, Jubail, Saudi Arabia July 2008 – August 2010

Position: Senior Project Engineer.

Kurimoto Limited – Japan, CP-I, Rehabilitation of Gates. May 2007 – July 2008 Position: Electrical Engineer

AirSys ATM – UK, at (Airport – Lahore, Pakistan), March 1999 – March 2002

Position: Senior Engineer – QA/QC.