Post Job Free
Sign in

Engineer Electrical

Location:
United States
Posted:
August 26, 2018

Contact this candidate

Resume:

Farid R Elagamy

** * **** **, ******, NH *****

Cell: +1-440-***-**** : ***.*****@*******.***

Profile

Electrical Engineer With 10 years experience in [Installation electrical Utility -Control, Maintenance,Protection of Electrical Substations-Create Preliminary Interconnect Drawings, equipment DC schematic drawings, Relay Schematic Drawings, Three Line Diagrams, All Electrical Substation Drafter -Marketing for Electrical Utility-Design layout,3D Renditions, Electrical Calculations and Drawing of Solar Energy projects-Designing Electrical Transformers, Inductors,Reactors,etc]

Areas of Expertise

•Design Automatic Control Circuits

•Maintenance of Medium Voltage Cables

•Maintenance of Electrical Transformer

•installation of Electrical transmission lines

•development of electrical design of power distribution System

•Microsoft Office

•Logo Siemens Program-Hitachi Software "Actwine " "PLC"

•Matlab Programming Language

•Optimized Program Service “OPS”

•Motor Control

•PLC Ladder Programming

•Installation of Medium Voltage Cables

•Create Electrical Substation drawings

•Create the Relay Schematic Drawings

•calculations of [Voltage Drop-short circuit-load flow -lighting ]

•AutoCAD

•Microsoft Visio

•LabView Programming Language

•ATP Program

•Google sketch up Program

•Dialux Program

Professional Experience

Electrical Design Engineer

Feb 2015 till now

Warner Power-Warner,NH,USA

Responsible for “Design Electrical transformer (Control & Power Dry Type Transformers low &medium voltage TR, Single & Three Phase -Reactors - AC and DC Instructors - Harmonic Filter Reactors, Isolation TR.-Auto TR –Scott T, Water Cool TR,High Reactance TR, Elevator Application TR, Data Center Application TR, ..etc)

Define and document bills of materials and process routing steps - Work with test and manufacturing teams to resolve floor issues, Design special Products .Review Designs .

Electrical Design Engineer

March 2014 to DEC2014”

AFP Transformers Corporation -Edison, NJ,USA

Responsible for “Design Electrical transformer (Control & Power Dry Type Transformers, Single & Three Phase -Reactors - AC and DC Inductors - Harmonic Filter Reactors, Isolation TR.-Auto TR –Scott T..etc)

Define and document bills of materials and process routing steps - Work with test and manufacturing teams to resolve floor issues – Prepare the Mechanical Design for the Transformers.

Electrical Design Engineer

May 2012 to Sep 2013”

Transformer Engineering (Trenco)-Cleveland, OH,USA

Responsible for “Design Electrical transformer (Control & Power Dry Type Transformers, Single & Three Phase -Reactors - AC and DC Inductors -Air Core Inductors, Harmonic Filter Reactors, Isolation TR. etc)

Define and document bills of materials and process routing steps - Work with test and manufacturing teams to resolve floor issues - Design and develop manufacturer products that are cost competitive and in adherence to the material standardization strategy “

Electrical Design Engineer

October 2011 till April 2012

Yellowlite – Cleveland, OH, USA

Responsible for "Design of PV Systems (both grid connected & off-grid) which includes System Layout(2d&3d), System Configuration, Electrical Connections, DC & AC Cable sizing, Solar Array sizing - Prepare schematic, single line diagram (SLD), power flow diagram of the complete system - Develop specifications for various components and required for Solar PV Systems - Site supervision which includes supervising Installation, Commissioning and Maintenance works of Solar PV Systems”

Electrical Maintenance Engineer

September 2010 to July 2011

National Library and Archives "Ministry of Culture – Cairo, Egypt

Responsible for “Primary technical resource for maintenance of all low/medium voltage electrical equipment such as switchgear, transformers, emergency generator and distribution systems - Monitor Preventive/Predictive maintenance program and ensure timely resolution of all identified issues - Assist in Corrective-maintenance, Preventive maintenance and/or Project cost estimation.”

Electrical Engineer

March 2010 to June 2010

K$Y Contracting Company – Doha, Qatar

Responsible for Marketing the ( Electrical Distribution Boards-Circuit Breakers-Technical Reports –study the Market -Technical Support,… etc.)

Electrical Power Engineer

March 2008 to February 2010

South Cairo Electrical Distribution Company – Cairo, Egypt

At the Control Dispatch Center Responsible for" Monitoring -Trouble Shooting –Maintenance Procedures -Control (Voltages, Currents, Power) values". At Medium Voltage Grid Responsible for "Maintenance of (Medium Voltage Cables-Power Transformer –Distribution Boards –transmission lines-Installation –protection,..etc.) - System studies including power flow, stability, short circuit and others - Work flow management - support high voltage substation and transmission protection and control - Monitor Preventive/Predictive maintenance program and ensure timely resolution of all identified issues”

Installation Engineer

October 2007 to February 2008

Elwatanyia for Trading and Engineering – Cairo, Egypt

Responsible for “Sales and Installation of (Power factor correction Boards-Capacitors,… etc.) - representing the product to customers and at field events - Able to respond to functional and technical elements - Able to convey customer requirements to Product Management teams “

Education

Helwan Engineering College 2007

Helwan, Cairo, Egypt

Electrical power and machines Engineering,BSEE

Ain shams Engineering College 2010

Ain shams, Cairo, Egypt

Electrical protection and Breaker equipment, Post graduate Diploma in Engineering



Contact this candidate