Post Job Free
Sign in

Manager Project

Location:
Palm Bay, FL
Salary:
90k to 165+k annually
Posted:
August 26, 2018

Contact this candidate

Resume:

Danny E. Woodring RCDD

**** ****** *** **.

Palm Bay, Florida 32905

Home 321-***-****

Mobile 1-321-***-****

Email **********@*****.***

Objective

Seeking short term or long term Consulting Management positions allowing me to use my 25+ years of successful management and project management skills, proven by my successful, on time and profitable projects and management assignments, both domestic and international.

Profile

Motivated, personable business professional with multiple Technical courses, college degree (BS in Telecommunications), Registered Communications Distribution Designer (RCDD) and a successful track record in Telecommunications and IT, OSP infrastructure projects as well as small business ownership. Demonstrated history of producing accurate, timely reports and meeting stringent client guidelines. Have a good knowledge of contracts and statements of work.

Flexible and versatile – able to maintain a sense of humor under pressure. Poised and competent with demonstrated ability to easily transcend cultural differences. Thrive in deadline-driven environments. Excellent team-building skills.

Skill Set

Level

Corporate Management (VP, Director)

Advanced

Program Director (PMO)

Advanced

Program Manager/Project Manager

Excellent

Registered Communications Distribution Designer (RCDD)

Excellent

Engineering Management

Advanced

OSP/ISP Implementation/Construction Manager

Excellent

Structured Cabling Systems

Excellent

Network Infrastructure Design

Advanced

Accomplishments

I have brought projects in on time and on or below budget. I have extensive large construction project experience including Airports, High Rise and multiple campus buildings and facilities and am well versed in all MEP and network infrastructure issues, WiMax, 4G implementations, contracts, Security CCTV, Intrusion detection systems design review and Access Control systems, identifying risks and problem solving. I have completed several Contracts, and project management courses through the companies I have worked for and follow the PMBOK methodologies. This has given me the experience and practical knowledge needed to bring projects in on time and on budget.

Project

Location

Title

Value

Conclusion

Dulles/National Airports

Washington DC

Senior Engineer / Operations Manager

14 Million Both airports

On Time /On Budget

KLIA Airport

Kuala Lumpur

Design Manager

21 Million

On Time /On Budget

Curacao Intl Airport

Curacao Latin America

Special Systems Design Manager

2.5 Million

On Time /On Budget

Petronnas Towers

Kuala Lumpur

IT Project Manager

51 Million

On Time /On Budget

Guam Govt. WAN

US Territory Guam

Dir. of Deployment

8 Million

On Time /On Budget

AT&T R&D Labs

Middletown Md.

IT Project Manager

12 Million

On Time /On Budget

NDIA Intl. Airport

Doha Qatar

Special Systems Design Manager

151 Million

Ongoing Contract

Science and Technology Center

Doha Qatar

Program Manager

7 Million

On Time / On Budget

Professional Experience

Freelance Consulting / Self

3/2012 to Present

Developing Tender Specifications, Tender Technical Evaluations, Work Processes and engineering road maps. Developed infrastructure estimating program with Excel. Worked on Security and airport system Masterplans for new greenfield airports in South America. Other short term projects New Abu Dhabi port consulted as Engineering Manager.

Currently consulting on Oman’s New Airport in Salalah, Oman for passive network infrastructure for total new airport and New Terminal Building, several services facilities and Fiber Optic Backbone for a complete AWAN, LAN, WLAN, internal WiFi, Navaids and Scada networks. Due for contract completion July 31st, 2014

Site Development Project Manager EVDO/Construction Manager

1/2010 to 2/2012 Adex/Ericsson

Oversaw T1 and IP circuit installs to increase bandwidth on Sprints existing CDMA network in Alabama, Tennessee and Georgia Markets. Duties included verification of funding, circuit FOC dates, equipment order verification, equipment received verification and site completion ON AIR status. Monitoring risks to keep sites on target for turn up.

Construction Manager

Oversee construction of the new Clearwire 4G and WiMax network build in Washington DC and work in Miami market. Did quality punch walks, ESH management of sub-contractors, monitored procurement so equipment was received on time, uploaded into Clearvision closeout pictures and documentation. Oversaw Site Acquisition – leasing, zoning, design, permitting

Program Manager of Projects 3/2008 – 12/2009 EDS Gulf States an HP company Doha, Qatar

Leading project implementation efforts, tendering to vendors, Contracts administration technical compliance evaluations. Qatar Foundation Science and Technology Center multiple buildings including Data Centers. Overseeing infrastructure specifications development, SOW's, Contracts, RFP’s and reviewing subcontractor tender response submittals, Ensuring compliance to the EIA/TIA and ISO standards. Oversee quality audits and projects are on schedule and within budget. Attend and chair client and EDS PMO meetings. Working with multiple senior project managers for all facets of work.

2/2000 to 3/2008 BECHTEL Corporation

Design Manager Special Systems Hamad International Airport (NDIA)

Overseas Bechtel Incorporated, Doha, Qatar

Leading special systems design efforts, tendering to vendors, Contract administration technical compliance evaluations. Developing specifications, SOW's, Contract schedules, BOQ's and reviewing subcontractor submittals for the New Doha International Airport (NDIA), Managing a team of 5 designers doing CCTV, Infra red Perimeter intrusion detection systems review, Access Control LAN, WAN, AODB, FIDS, MATV, Public Address, Structured cabling, and ULV equipment rooms submittal reviews. Ensuring compliance to the EIA/TIA and ISO standards. Oversite 57 project Managers. Attend and chair client design meetings.

Sr. Systems Consultant Bechtel Civil, Curacao, Curacao

Designed Telecommunication, LAN, W-LAN, Security infrastructure for the New Curacao International Airport. Developed the RFP's and held the Pre-bid conferences for the Voice, Data, Security, CUTES and MUFIDS systems. Contracts negotiations.

Baghdad Airport Reconstruction Manager Bechtel Corp. BSII Division, Baghdad, Iraq

Managed reconstruction of all Civil, MEP, Telecommunications CCTV, Access control, Perimeter detection and Airport systems at the now Baghdad International Airport. I had total responsibility for all associated budgets and costing. Provided sub-contract and Contract management for the Iraqi contractors.

Market Manager Cingular GSM Overlay Bechtel Corp. Telecom Division, Nashville, Ten

Market Manager for Tennessee GSM Overlay and new build for Cingular. Responsible for all walkdowns, Site Acquisition – leasing, zoning, design, permitting,T1 installations, Psax 911 and GPS installation, sub-contractor Contract management and implementation of cell sites. TDMA sites were co-sited with the GSM radios sharing the same antennas. brought market in at better than 40%GM.

Global OSP/ISP Implementation Manager Bechtel Corp. Telecom Div., Frederick, Md

Working as Director level Functional design and engineering manager for 100 + project engineers on both domestic and international telecommunication network builds of OSP / ISP and Wireless projects. Developed fiber specifications and implementation standards. Provided Six Sigma support in PIP development. Developed career road maps for the GBU engineering department and performed annual reviews of the engineering staff.

Director of WAN/LAN Deployment 6/1999 - 3/2000 ESA, NY, NY

Director of Deployment for the Government of Guam’s new Wide area Network. We worked with the Guam Telephone Authority in using their OC48 fiber optic backbone. We leased an OC3 provided by GTA on the OC48 ring. Supervised and coordinated all sub-contractor and Telco efforts. Directly interfaced daily with the Gov Guam officials and technical support personnel. Project complete March 2000

Sr. IT Project Manager 5/1997 - 6/1999 Shen Milsom & Wilke, NY, NY

IT project manager over the design, engineering, Contract management and implementation of all data, voice, video, cellular systems and their associated infrastructure . The project consisted of the two tallest office towers in the world ( Petronnas Towers ) with a five story retail center and concert hall linking them together. The horizontal cabling used was a composite cable with 3 - Category 5 and two multi-mode fibers to more than 20,000 locations. Project managed the design and implementation and migration of the New AT&T research and development complex in Middletown NJ. covering 2 million square feet also the new regional NOC in Parsippany NJ.

Operations Manager / Sr. Distribution Engineer 4/1995 - 5/1997 HARRIS CORP., Melbourne, FL

Responsibilities included infrastructure design for airport expansion, compiling subcontractor statement of work, monitoring subcontractor’s implementation progress and providing engineering support. Promoted to Operations Manager over Harris ACS Shared Tenant Services operation at Dulles and National Airports using Nortel switches tied together with an OC -1 Sonet ring, Access Contol, CCTV systems and Structured Cabling Systems. $ 17 Million Operations Budget Transferred to Senior Design engineer at Kuala Lumpur International Airport project in Malaysia working OSP/ISP fiber optic and copper cable distribution Design review. Involved in implementing Malaysia’s first ATM and SDH campus network. Heading up an all trades taskforce for problem solving.

Education

Bachelor's Degree in Telecommunications (OLDP)

Business Management and Business Law Park College

BICSI (RCDD) Registered Communication Distribution Designer

Currently studying for PMP certification



Contact this candidate