Post Job Free

Resume

Sign in

Plant Engineer

Location:
Moradabad, Uttar Pradesh, India
Posted:
August 25, 2018

Contact this candidate

Resume:

Pavan kumar

ac6sy5@r.postjobfree.com

+91-704*******, 797-***-****

Nagar Stone Agarsen Nagar jhalawer road Baran ( Raj )

OBJECTIVE

I would like to be a part of dynamic environment that promotes team effort and provides opportunity for value based growth as well as career advancements while making a significant contribution to the organization.

EDUCATIONAL QUALIFICATIONS

1B.Tech in Mech.Engg. (Hons.) with 72.53% from Jaipur Engineering College and Research Centre jaipur (JECRC) affiliated to Rajasthan Technical University kota, Rajasthan. (Pass out 2013)

23 Year Diploma (Mech.Engg) with 66.65% from Government Polytechnic College Kota affiliated to Board of Technical Education Jodhpur Rajasthan. (Pass out 2007)

TECHNICAL SKILLS:

1Power Plant Operation & Maintenance Engineer

2Operation & Maintenance of 240 TPH PF and 300 TPH CFBC Boiler.

3Operation & Maintenance of 48 MW and 60 MW Steam Turbines

4Experience in handling centralized air system, DM plant, WPT, ETP, Cooling tower & CHP

5Preparation of MIS.

6Carry out various modification jobs. & Shutdown planning

7Well versed in operating plant thorough D.C.S.

WORK EXPERIENCE 8 Year

1 Jubilant Life sciences Ltd. Gajraula from December 2016 to till date

Designation: - Asst. Manager

2 DCM Shriram Ltd. (SAC) Bharuch from July 2014 to December 2016

DCM Shriram Ltd. (SFCL)kota From April 2008 to July2010

3 Thermax Ltd. (Power Division). 1Year

4 Chambal Fertilizers & Chemicals Ltd. CFCL Gadepan, Kota (Rajasthan) 1Year

Roles and Responsibilities:

1Start up, Shut down (normal and emergency) of plant/process within operating envelope.

2Start up of boiler from cold position/bottled up position after shutdown/low load to increased load demand.

3Regular monitoring of proximate analysis of coal, fineness of coal, water and steam analyses, cooling water analyses flue gas analyses and unbent analysis

4Regular monitoring of load distribution in order to nullify unutilized load status.

5Condition monitoring of equipments

6Coordinating with other section i.e. D.M. plant, Coal handling plant, Mechanical Maintenance, Electrical and Instrument Dep’t. For various O&M jobs.

7Acts as a site controller in case of any emergency as per emergency response plan.

8Isolation of running equipment, charging of auxiliaries of equipments

9Issuing of permit to work to concerned Dep’t. For maintenance (preventive/corrective) as per B.S.C Norms.

10 Efficiency monitoring of boiler, turbine &equipments

Experience Summary:

Boiler: (BOILER CAPACITY- 320 TPH, MAKE- BHEL, P.F. FIRE BOILER)

HEATING SURFACE AREA-10313 M 2 WITH – 102.5 KG/CM2, 540 C

DCS-YOKOGAWA & HONEYWELL

Turbine: 80 MW & 48 MW condensing with extraction steam turbine make BHEL

Project:-

Commissioning of 300 TPH Boiler, make ISGEC and 66 MW BHEL steam turbine

Software Exposure:-

Operating System - Windows- 98/2000/XP/2007/2010 & MS-Office.

ERP System - SAP, SAP-HANA

Personal Details:

1Date of Birth: 09 August 1986

2Marital Status: married

3Current CTC: 8.85 lacs/annum

Reference: It may be provided on request

I certify that above information is correct as per best of my knowledge.

Date: 02/06/2018

Place: Gajraula (Pavan Kumar)



Contact this candidate