CURRICULAM VITAE
SUBODH SINGH
B.E (ELECTRONICS & COMMUNICATION ENGINEERING)
Present address:
GVK POWER & INFRASTRUCTURE LTD C!-12 Goindwal sahib, Tarn- Taran, Punjab, 143422
Mobile No.819-***-****/940-***-****
Email ID:*************@*****.***
Working Experience:
1.Current job :
Organization: GVK Power Goindwal Sahib Ltd(2X270MW)
Period: From 9- NOV-2015 to till date
Designation: Sr. Engineer, Electrical
Description: Working as a Sr.Engineer (Electrical), Looking operation & Maintenance of 800TPH coal handling plant Electrical equipment like (LT & HT Motors, Stacker Reclaimer, Wagon Trippler, Travelling Trippper, Transformer, Compressor) and Ash handling plant. Evaluated electrical system, component and equipment by performing system analysis. Applied knowledge of electrical system to improve system efficiency and energy conservation. Perform maintenance of BTG, DM, CHP and AHP electrical system as part of system performance improvement project. Prepared reports by collecting, analyzing and summarizing information and trends. Ensured stability of equipment’s operation by following OEM instruction and standard procedure. Perform preventive, predictive and break down maintenance of all electrical equipment of BTG, CHP and AHP and BOP also. Plant and Executed annual/opportunity shut down maintenance of electrical equipment’s. Planning of operation and maintenance computerize in denting and inventory control software SAP. Handled basic engineering and detailed engineering of electrical system. Managed technical contract, QAP, EPC Protocols and O&M technical paper Handled erection and commissioning of BTG electrical equipment including Generator, transformers, HT / LT motors, PCC, MCC and switch yard as per industry standards. Co-ordinated with vendors and reported to management for smooth flow of project work. Handled shop floor as well as on-site inspection of electrical equipment. Co-ordinated with O&M team for transfer of office from EPC to O&M. Assisted the department HOD (EPC) with contract closure activity Ensured stability of equipment operation by following OEM instructions and standard procedures. Handled activities related to synchronization of unit, maintaining of PF, distribution of load and demand side management. Handled preparation of MIS reports, technical diary and generation report as part of documentation for O&M department.
2. Organization: ENERGO ENGINEERING PROJECTS LIMITED.
Period: From Aug 2012 to OCT 2015.
Designation: Sr. Engineer, Electrical.
A) PROJECTS: Sanjay Gandhi thermal power station; Birsinghpur (MPPGCL)
Erection and commissioning of Second phase ash bund of (4X210MW+1X500MW)
Description:
Working as a site Incharge of 4 X210MW plant. Responsible for execution of assigned projects. Responsible for day to day supervision of work, planning, scheduling, monitoring of projects. Ensures effective coordination of all project execution activities taken up by different functions Mechanical, Electrical and Instrumentation.1.5 km 33 kv transmission line erection & commissioning work done.1000/630 KVA transformer erection & commissioning work. Assist Project Head in the preparation of project execution schedule and assigning and allocating resources for project to ensure successful completion of project meeting time, quality and cost parameters. Assists Site Head in mobilization of resources such as manpower, plant & machinery, funds, site facilities etc. for smooth execution of project. Co-ordination with the design department Modify & Development of drawings as per site condition. Erection and commissioning of recovery water pump house and barge and its auxiliaries. Cable laying. Erection & commissioning of LT motor up to 200 KW.
B) PROJECTS: ESSAR REFINARY JAMANAGAR, 325MW.
DESCRIPTION: Working as a Sr.Engineer (Electrical)
Operation and maintenance of coal handling plant of Maintenance of heavy equipment’s like crusher, roller screen, belt feeder, paddle feeder, inline magnetic separator, travelling Tripler, coal feeder, stacker cum reclaimer. Calibration of Field Instruments. Maintenance of Electrical Sub Stations (Panels etc.).Maintenance of HT & LT motors.Different Electrical Drives & Protection Switches and VFD drives.
3. Organization: McNally BHARAT ENGINEERING COMPANY LIMITED.
Period: From Aug 2008 To–AUG2012.
Designation: Engineer, Electrical.
A) PROJECTS: SAGARDIGHI THERMAL POWER PLANT, 2X300MW (WEST BENGAL).
Description: Working as an Engineer. Operation and maintenance of coal handling plant Maintenance of heavy equipment’s like crusher, roller screen, belt feeder, paddle feeder, inline magnetic separator, travelling Tripler, coal feeder, stacker cum reclaimer. Calibration of Field Instruments. Maintenance of Electrical Sub Stations (Panels etc.).Maintenance of HT & LT motors.Different Electrical Drives & Protection Switches.
B) PROJECTS: Naively lignite corporation limited 2X125MW (RAJSTHAN).
Description: Working as an Engineer. Erection and commissioning of all electrical equipment like crusher, shuttle feeder, reversible shuttle feeder stacker reclaimer and transformer. Perform preventive, predictive and break down maintenance of all electrical equipment of BTG, CHP and AHP and BOP also.
Personal Details:
Fathers name: Shri Jamadar Singh
Permanent Address: MIG-355 Sanjeev Nagar Police Society, Nevari karond bypas Bhopal
Date of Birth: 15th February 1986
Language Proficiency: English, Hindi,
Computer Skills: MS Office (Word, Excel, Power point)
Nationality: Indian,
Marital status: Married
Total experience: 9 years
Notice period: 30 Days
Current ctc:6.1 Lac PA
Passport no: R3719554
Declaration: I here by declare that all the above information given is true and correct to the best of my knowledge and belief.
Date -14.11.2017 Signature
Subodh Singh