HEMANT KUMAR SINGH

E mail : ac6rip@r.postjobfree.com, ac6rip@r.postjobfree.com Cell : 987-***-****

Carrier digest:

over all 34 yrs experience in the field of project, operation & maintenance (Elect. + utility + Instrumentation), developments, energy conservation & cost control method, utility services, renovation of system & drives, up gradation of system & technology with steel, paper, petrochemical & rubber industries. An effective leader, having strong communication, coordination, analytical & trouble shooting skills, track record of delivering project in record time frame. Rich skilled in equipment engineering, for achieving best plant performance & output. Presently associated with M/s Madhya Bharat Papers Limited Champs as Chief Engineer ( Electrical & Instrumentation since Sept 04, 2017.

EXPERTISE: project & maintenance, automation, AC/DC drives, Large rating DC motors > 500 KW, captive power plant 8 MW (O & M), energy conservation / value engineering / cost reduction.

Educational Qualification

Bachelor of Engineering (Electrical) in Year 1983 (5 Year integrated course, regular from Govt. Engineering College Bilaspur (M P) affiliated to Pandit Ravishanker University Raipur. Over all marks 60 %

H S S C in 1976 (from M P Hr. Secondary Board Bhopal over all marks 67 %)

Carrier Summary: Total Experience: 34 Years

Exposures: Power Projects, Project & operation division of Paper & Petrochemicals Industry, Project & operation division of Hot rolling and Cold rolling (steel strips) Industry involving designing of following electrical installations: AC Drives (Standalone & Sectional) of Siemens,ABB,Danfoss,Mitsubishi, Yokogawa,Telemecanique, DC drives of Siemens, ABB, Eurotherm, KEC, NALCO, AEG, L & T, GE, PARKER-SSD; HT POWER TRANFORMERS (220/7.2KV, 66KV/11KV & 11KV/6.6KV with OLTC) & LT Transformers (Distribution & Converter duty), NGRs, HT (11KV, 6.6KV & 5 KV) motors & LT Motors; PLCs (ABB-XA-800, Siemens-S7 400/S7, 300 /S7 & S5, Schneider, Mitsubishi Q-Series, L & T LX-Series/984 series, GE 6000 series, AEG A500/ (AKF-35 Package); HT(11KV, 6.6 KV & 5 KV) Distribution Panels up to 40KA Fault level & LT Panels, HT & LT Cables; DG Sets (up to 1 MVA capacity); Alternators; LAVT Panels, AVRs; Synchronisation Panels; SCADA system; LT & HT capacitors; Scanners; HT & LT Protection relays (of ABB, L & T, AREVA, C & S, Siemens, ALSTHOM. ) & their coordination, Over Head cranes ; Battery Chargers; UPS (In parallel operation, Hot swap) ; ACB ; VCB; Soft Starters; Complete range of HT & LT Switchgears; All type of Earthling & Grounding Networks; Lightening arresters; VAM-Air-conditioning network; Bus ducts ( HT of 1650 A & LT up to 4000A), Different type of Lighting network; Compressors; H-Plants; 220KV, 66KV & 11KV Switch yards; complete automation system & Instrumentation (of steel strip hot & cold rolling mill, seamless & E R W pipe plant, Paper, rubber & petrochemical industries) Designing, execution & commissioning of complete electrical installations of new plants & their maintenance; various aspects of Project management with in defined time, cost & quality; Vender management-Tendering, negotiations, ordering, erection & commissioning, verifications of operational efficiencies of all electrical equipments; All latest tools e.g. TPM, TQM, ISO 9001, EMS 14001, OHSAS 18001, ERP, Inventory management, Instrumentation & Preventive maintenance through ERP . Material handling system, complete process automation & Q C S (Metso make) of paper mill

Profile:

Operation and maintenance of complete electrical network for plant machinery, 220 KV & 66 KV Substation & allied equipment with advanced protection network.

Supported by skilled team of 15 persons.

Planning of Electrical distribution system of 20 MW LT Network.

6.6 & 5.5 KV Power Distribution system.

Execution of all project activities with- in time & Cost.

Control of site activities as planned.

Sizing of Electrical Accessories

Ensure compliance with environmental policies, systems and processes

Negotiation with Vendors.

Resource planning, Guide and monitor continual improvement in the operational parameters of plant.

Plan and ensure availability of all the inputs for smooth and efficient operation of plant

All liaisonning work related to State Electricity Board, IEX for bidding power through open access, Industrial safety, pollution control and other agencies also Liaisonning with all Govt. agencies for statutory approvals as per requirements

Up gradation of various existing systems and technology

Selection of energy efficient equipments and electrical motors, system and technology.

To maintain system power factor 0.996

Cost reduction without affecting quality and quantity.

Good utilization of existing resources and man power.

Coordination with purchase, store, mechanical maintenance, project & planning & tool room also to assist mechanical & production people to solve their problems.

Ensure for Electricity and maintenance cost within budget, also safe working & zero incident within the department.

Have leadership quality & good in people management. Excellent inter-personal and cross-cultural communication skills.

Good in time management & ability to handle pressure very well.

Complete dedication to maintain the down time within the limit as specified by management presently I am maintaining 0.25 % down time while limit specified for our Electrical & Automation Department is 0.75 %

Energy conservation using advance automation system & technology.

To execute all the preventive, predictive & breakdown maintenance in ERP System. Good exposure in ISO: 9001 -2008, EMS 14001 -2004, OHSAS 18001 -2007 & ERP / SAP.

To implement improvements suggested by efficiency cell to improve the operational parameters of the plant.

Co ordinate with specialist team / maintenance team to develop suitable solution for key issue/ problems observed during the operation of the plant.

Guide the team in addressing regular operation problems / issue, faced by plant.

To ensure reduction in down time of the machinery / equipment.

To co ordinate timely completion of preventive maintenance.

To assist in addressing any maintenance problems arising.

Good communication towards my optimistic approach to take new challenges.

Manage the responsibility of the entire operation of the department within the boundaries of the budget & showing developing plans to save on operational & maintenance costs.

Talent for proactively identifying & resolving problems, ramping up project activities within time deliverables & maximizing productivity.

Possess strong communication, collaboration & team building skills with proficiency at grasping new concepts & utilizing the same in a productive manner.

Effective interpersonal skills with abilities to meet deadlines & work under pressure.

Ability to work accurately and pay attention to details

Ability to available 24 Hrs for plant even ability to guide to team over phone in case of out of station for solving the problems.

Business stragary

Exposure:

Complete Electrical Project job of 12 MW Thermal Power plant (coal based), 80 tons/hr rotary hearth & pusher type furnace and 55 tons/hr W B F, Erection & commissioning of two stage gasifier (3 x 3.4 mtr dia) to produce gas for 80 T / hr reheating, pusher type furnace. Installation & commissioning of 5000HP(6.9KV) Synchronous motors, 4000 HP DC motor, complete automation system of seamless hot rolling pipe mill & hot rolling medium size steel strip mill, NDT Machines, UT Machines, EOT Cranes up to 60 T capacity, large AC and DC drives, SCADA, PLC, DCS, Instrumentations and various field devices & complete process automation

Last Employer: New Bombay Paper Mills private Limited

Worked as Head (Electrical & Instrumentation) since April 24, 2017 To 31 August, 2017 for limited period.

During short period of employment with New Bombay Paper Mills Pvt Ltd worked as HOD of Electrical & Instrumentation Deptt, plant automation, project, development & energy conservation also active member of core team for condensation recovery, up gradation of system & Technology & ERP, SAP & Safety team

Employment

details

EMPLOYER NAME & ADDRESS

POSITION HELD

PERIOD

EMOLUMENTS

JOB RESPONSIBLITIES

Madhya Bharat Papers Limited Champa (C G)

Chief Engineer (Electrical & Automation)

Working Since 04/09/2017

INR 9.0 Lakhs / Annum

Working as HOD

New Bombay Paper Mills Pvt Ltd

Head ( Electrical )

24/04/2017 to 31/08;2017

INR 6.0 Lakhs / Annum

Worked as HOD, independent commissioned Siemens & ABB stand alone & group VFD

Shree Ajit Pulp & Paper Limited, VAPI

Manager(Electrical &Instrumentation)

10/06/2016 to 31/12/2016 short duration in contractual basis

INR 11.0 Lacs per Annum

Worked as HOD of Elect & Instrumentation. Also looking after power plant DCS & Elect maintenance, core team member of ERP & Risk Management & safety

Avon steel Industries Pvt Limited, Ludhiana

Sr Manager (Electrical & Automation)

12/02/2010 to 05/06/2016

INR 9.75 Lacs per Annum CTC

Worked as HOD of Elect & Automation & did various improvements /optimization in process & cost control

Maharashtra Seamless Limited

Dy Manager (Electrical)

01/03/2006 to 14/02/2010

INR 36000.00 P M + semi furnished House

Project, maintenance, instrumentation, automation & energy conservation of 14 seamless pipe plant

Shah Paper Mills Ltd, III Phase, GIDC, VAPI (GUJRAT)

Electrical Engineer

December

2000 - Oct 2003

Rs. 24,000 p.m.

Gross + House

Project, maintenance, automation and spare parts inventory & worked as H O D

Avery Cycle Industries Ltd, (Hot Rolled Strip Div) Ludhiana (presently Avon Ispat & power ltd)

Electrical Engineer \ Manager Electrical

March 1998 Dec 2000 & Jan 2004 Feb 2006

Rs. 21,000 p.m.

Gross

Rs. 31000 p m

Worked as head of Electrical, instrumentation & Automation department & co ordination with various agencies also team member of Safety & MIS

Panchshila Rubber Ltd. Malanpur (MP)

Maintenance manager (Electrical)

Dec94-Feb98

Rs.15,000 p m

Gross

Worked as head of Electrical department & active member of safety committee.

Oriental carbon and chemicals ltd. (Carbon black div) Ghaziabad

Electrical Engineer

Apr90 Dec94

Rs.10,700 p m Gross

Project, maintenance and operation of 3.5 MW Power Plant and Process Automation, Analysis of root cause of break downs & its remedy.

Hindustan Dev. Corporation Ltd. G.E.W. Unit Bharartpur (Raj)

Assistant Electrical Engineer

Jul 87 - Apr 90

Rs.5800 p m Gross

Project, maintenance, spare parts inventory and energy conservation

Orient paper Mills Ltd. Brajrajnagar (orissa)

Assistant. Electrical Engineer

Dec 85 - Jul 87

Rs 2400 p m + house

Maintenance, Development & modification of D C Drives also co ordination with mechanical, production & planning Deptt.

Madhya Bharat paper mills ltd. Champa (C.G.)

Assistant Electrical Engineer

Jul 83 - Dec 85

Rs. 1750 p m + house

Project, Maintenance & Up gradation of D C Drives

Training:

1.Participated in 3 days workshop on GUIDE LINE FOR ENERGY AUDITING.OF THERMAL POWER PLANTS" @ National power training institute Nagpur, organized by central electricity authority & gtz

Under INDO GERMAN ENERGY PROGRAMME

2.Participated in 2 days training program on "IMPROVEMENT OF WORKING CONDITION & PRODUCTIVITY" organised by Regional Labour Institute Kanpur from 04.03.1997 to 05.03.1997

3.Special managerial training on " FINANCIAL MANAGEMENT " conducted by Small Industries service Institute New Delhi (Ministry of Industry) from 07.09.1992 to 19.09.1992

4.Special training on "ELECTRONICS CIRCUITS & GENERAL MAINTENANCE & OPERARTION OF THYRISTORISED D C DRIVES" at DEBIKAY ELECTRONICS WORKS CALCUTTA from 23.09.1985 to 27.09.1985

Emoluments:

Last CTC: 9.0 lacs per annum

Ready to relocate

Minimum notice period for attending the interview: 5 days

PERSONAL DETAILS

Name: Hemant Kumar Singh ( D O B : Aug 14, 1958)

Father s Name: Late Thakur Ranchhor Singh

Present Residence Address: FLAT # ND / 6, Staff colony, Madhya Bharat Papers Ltd

Village : Birgahni, Post : Champs (Chhattisgarh)

Pin :495671, Distt : Janjgir- Champa

Permanent Address C\O - Dushyant Kumar Singh

Gopi band Para, PANDARIA

Distt : KABIRDHAM (Chhattisgarh)

Pin : 491559

References Colleague

1 Mr. Jitendra Goswami 2 Mr. Rajnish Rai

Head (Engineering) Sr Manager (E & I)

Avon steel Industries Pvt Ltd Shahi Group of Industries

Ludhiana (Punjab) cell : +91-961*******

Cell:+91-991*******

Achievements with Avon Steel industries Pvt Limited (Formely known as AVON ISPAT & POWER LTD)

1.Reduced specific power consumption from 160 KWH /T to 118 KWH/T. w/o affecting quality & Qty

2.Improved system power factor from 0.933 To 0.996

3.Good & efficient functioning of Electrical & Automation Deptt even on reducing 35% man power

4.Reduced per annum maintenance Expenditure of elect & automation deptt from Rs 69 lacs to 22 lacs

5.Reduced electrical down time from 2.5 % to 0.25 %

6.Established better cooperation & communication between various deptt

7.Up graded the various system & technology

8.Ensure safe operation & zero incidents within department.

9.Implemented EMS 14000 & OHSAS 18000 system

10.Ease & upgraded the various process systems & automation to maintain quality products.

11.Reduced specific coal consumption in 2 stage Gasifier from 125 kg to 87 kg / T of production

12.Increased condensate recovery in power plant from 72 % to 84 %

13.Reduced Auxiliary consumption in power plant from 18 % to 14%



Contact this candidate