Post Job Free
Sign in

Project Manager

Location:
Chennai, Tamil Nadu, India
Salary:
S$6000
Posted:
August 18, 2018

Contact this candidate

Resume:

Page * of *

CURRICULUM VITAE

MANIKANDAN.A Mobile: +91-805**-*****

E-mail: ***********@*****.**.**

*******.***@*****.***

Manager Engineering & Operation

... Specializing in Extra Low Voltage-Integrated Building Management System & Automation Design & Projects... Result oriented professional 14 + years of expertise in the field of Extra Low Voltage like Building Management System, Fire Alarm, CCTV, Public Addressing & Intercoms, Access Control, Intruder Systems, Perimeter, Home Automation and Process Control Instrumentation Design (5+ Years) with verifiable track record for the successful completion with rapport support with stakeholders, end user/clients, consultants, Project Engineers and vendors. PROFILE

Employment Exposure

A. Asst. General Manager –Integrated Services (TurnkeyContractingCompany) M/s. Vector Projects India Pvt Ltd - Chennai, India. June 2017 to till date.

Responsibilities

• Installation contract execution of Electrical, ELV and Fire Fighting System from the start of mobilization of site till commissioning, training and handing over of the entire Turnkey Project Packages.

• Installation of all types of Electrical Items. Making Electrical Plan and Detailing shop drawings of all Systems.

• Supervise the project schedules and implement its plan as per approved, deadline and Client's specification.

• Monitors work progress of each project at every stage of construction phase and coordinates with Client.

• Have full knowledge of the following ELV services and sufficient knowledge of Electrical and HVAC with other coordination of turnkey projects.

o Electrical – Low Tension sub-stations, Electrical Rooms, LV cable laying, industrial and commercial electrification including the Telephone & Data Networking/ Audio Visual and its cabling system. o BMS, Fire Alarm, Public Address, Access Control, CCTV, Rodent Repellent, Water leak, Etc with other ELV works.

o MEP Services – Co-ordinate with HVAC, Plumbing, Fire Fighting’s system both water and Gas, Fit out and Interior Contractors for the main Aesthetic Design o Achievement designed by Architect as per approved drawing / layout of entire project.

• Conducted successfully the safety and work procedure trainings on all site for Staff and entire Work Force.

• Assist Project Management in appointment of manpower by properly conducting interviews and scrutinising the requirement of Electrician’s / Foreman’s / Supervisor’s based on nature of site work to be implemented. Project Handled

• Code mantra (Publishing Company), Chennai – Turnkey Contract: Handing Services like HVAC, Electrical, Networking, ELV and Sprinkler system.

• Renault Nissan Business Centre, Mahindra City, Chennai (Car Manufacturing Company-Office Fit out) Chennai – Turnkey Contract: Handing Services like HVAC, Electrical, Networking, ELV and Sprinkler system

• Caplin Point Laboratories Pvt Ltd (Pharma HQ office –Fit out), Chennai – Turnkey Contract: Handing Services like HVAC, Electrical, Networking, ELV and Sprinkler system.

• Wipro Technologies (Master Data Center) (office –Fit out), Chennai – Turnkey Contract: Handing Services like HVAC and Sprinkler system.

B. Sr. Manager-ELV & Automations

M/s. Brayan Automations Pvt Ltd - Chennai, India.

Dec 2011 to June 2017.

Responsibilities

• To lead ELV (IBMS/Automations) projects team comprising of Design, Execution & Commissioning personnel and ensure timely turnover and collection.

• Manage the client stakeholders, team members or contract personnel to design a solution and establish associated project timelines and budgets that allow for the delivery within the project constraints

• Set Project deadlines for the team and explain the cost implications of slippages to the team

• Technical training (design, engineering, software, commissioning) and development of new recruits

• Understand basic revenue models, Profit/Loss and cost-to-completion projections and make decisions accordingly.

• Understand our pricing model and billing procedures

• Accurately forecast revenue, profitability and margins Page2

• Ensure project legal and statutory compliances and manage project budget

• Determine appropriate revenue recognition, ensures timely and accurate invoicing and monitors receivables for project

• Follow up with clients when necessary regarding unpaid invoices

• Evaluate all key project deliverables, as well as final product to ensure traceability of requirements, high quality and client acceptance

• Responsible for quality & standardisation of Engineering & Installation Drawings, Design & Project Technical Documentation

• Discuss project quality, client and team satisfaction, and project success metrics during regularly scheduled and ad hoc project review meetings with the GM-Operations

• Track and report weekly on percent complete, budget burn, turnover, unexecuted order value, billed value, collection, slippage, and duration to complete and other key project metrics.

• Coordinate with consultant, client & Architect

Project Handled

• Classic Mall Development Co. Pvt Ltd, Market City (Phoenix Mall), Chennai - IBMS Package (BMS, FAS, PAS

& CCTV System).

• Anand Citi Centre Holding Pvt Ltd, Chennai (ETA)-IBMS Package BMS, FAS, PAS & CCTV System

• ETA Properties and Investment Pvt Ltd, Chennai (ETA)-Fire Fighting Package Sprinkler, Hydrant, Fire Alarm & Public Address System

• ETA Techno Park Ltd, Chennai (ETA) - Additional BMS System.

• DLF Mico Commander’s, Egmore-Chennai (L & T ECC Division) - FAPA System

• TNEB Data Centre-Chennai H.Q- Fire Trace tube co2 gas suppression System

• Renault Nissan Car Factory; FAS, PAS, ACS, CCTV & Fire Rated Access Door in various sector like body shop, Trim & chassis, Heat treatment Area, office Building and Warehouse units. C. Design Lead-IBMS

M/s. Johnson Control India Pvt Ltd - Chennai, India. July 2010 to August 2011.

Responsibilities

• Design and Estimation - Effective costing, Estimation and pre-design activities

• Preparing Bill of Quantities with Technical specifications.

• Critical Technical Bids to be focused and discussed with the sales managers.

• Pre-bid drawings to be made ready for large projects

• Technical Bid Analysis, Inspection, As-Built Documentation and Project Closeout Finalization of system configuration.

• Team leaders are to be in place along with support engineers / draftsmen.

• Identification of design team -Technical support / Value engineering - Constructible feedback for the deliverables.

• Coordinate with consultant, client & Architect

Project Handled

• TRIL Info Park, Chennai - IBMS Package (BMS, FAS, PAS & CCTV System).

• Frontier Life line Bio Science Hospital, Chennai - IBMS Package (BMS, ACS, PAS & CCTV System).

• HP, Chennai- IBMS Package 3rd Floor in FAS & PAS. D. Senior Design Engineer-IBMS

M/s. Air Treatment Engineering Pvt Ltd - Chennai, India. Feb 2009 to July 2010.

Responsibilities

• Prepared IO Summary, Bill of Quantities, Cost Estimation, Product specification Matrix, Technical specifications for IBMS System, Tender Documents, Certification of Test report, Performance rating and Engineering Documents

• Prepared Design, Engineering and installation drawing of Building Management System, Safety and Security System.

• Handled Both Design & Project Execution.

• System approved with Client / Architect /Engineer / other Authorities for approval.

• Codes and Standards: -Carrying out Design works in accordance with appropriate International standards such as UL, BS, NBC, NFPA etc.

Project Handled

• Beliciaa Tower, Chennai-Building Management System in 2 towers.

• E-Bay, Chennai- Building Management System in 5 & 6th Floor. Page3

• Lister Technologies, Chennai-Project executed the 8’Th Floor –BMS, FAS, ACS, CCTV and, Fire Suppression System (FM 200).

• TCS E Serve International Ltd, @DLF, Chennai-Project execution in 9th Floor, 9th Block –BMS, FAS, ACS, CCTV, WDS, VESDA and Fire Suppression System (FM 200).

• CTRLS Data Centre, Hyderabad -Prepared Building Management system design -Tendered

• AMRI Hospital, Kolkata/Bhubaneswar -BMS, FAS, PAS, ACS & CCTV System. -Tendered

• Sir H.N. Hospital, Mumbai - BMS, FAS, PAS, ACS, Visitor management System, Asset Tracking system, Gate Automation System, Perimeter Surveillance system-design. E. Senior Design Engineer-IBMS

M/s. Vaishnav Intelligent Building Automations Pvt Ltd, Chennai, India. Dec 2006 to Feb 2009.

Responsibilities

• Engineering Documents like BMS (DDC controller selection, Internal wiring Diagram, Cable Schedule with tag details) Safety and Security System.

• Coordination with BMS/IBMS vendors, Consultant and Architect.

• Prepared the Technical specification, data sheets, coordinate diagrams, Logic diagrams and system architecture drawings using with ACAD.

• Prepared Engineering Documents/Drawing (Technical Submittal/As Build Technical Submittal, field sensor, detectors and readers, camera mounting drawing and Handing over Documents). Project Handled

• Gold Souk International Limited, Cochin- BMS, FAS, PAS, ACS (Boom Barrier) and CCTV System.

• Ashok Leyland, Chennai-Building Management System.

• Ceebros IT Park, Chennai-BMS, ACS, FAS, CCTV and Guard Tour system F. Mechanical & Electrical Co-ordinater- FAS

M/s. Hock Lian Seng Infrastructure Pte Ltd, Singapore. July 2004 to July 2006.

Responsibilities

• Coordinate with sub-contractor for the Fire Alarm System as per the schedule for our s main contractor.

• Survey daily activities and report to our Manager in construction site.

• Drawings coordinate with Client / Architect /Engineer / LTA other Authorities for approval.

• Technical discussions with sub-contractor/LTA

Project Handled

• Kim Chuan Depot, Singapore -Fire Alarm System

G. Research and Development Engineer-Process Control Instrumentation M/s. Tropical Electronic Equipment Co, Mumbai, India. March 2002 to April 2004.

Responsibilities

• Prepared BOQ for process control instruments like temperature controller, temperature transmitter, pressure transmitter, timer, counter and water flow meter.

• Get approval of calibration certificate for each instrument from the central institute.

• Designing printed circuit board for all the instruments. Handled Instruments

• Temperature controller, Temperature Transmitter, Timer & Counter H. Service and sales Engineer-Process Control Instrumentation M/s. Nippon Instruments India Pvt Ltd, Mumbai, India. March 2000 to Feb 2002.

Responsibilities

• Prepared quotation and achieve sales target at maximum.

• Attending troubleshoot in process control instruments like Temperature transmitters, Temperature Controller, Timer, Counter, Pressure switches, Flow meters, RPM indicator and PH indicator and PLC, PID, data logger.

• Prepare data for our instruments like pharmacy industry, industrial automation, air-conditioning, machinery and public utility

Handled Instruments

• Temperature controller, Temperature Transmitter, Pressure Switch, ph indicator, timer & Counter. Page4

I. Network Engineer

M/s. Logic Computers, Mumbai, India.

Nov 1998 to Feb 2000.

Responsibilities

• Installation of computer with software and Hardware.

• Troubles in India Today Press-Annual Maintenance Contract Handled - Integrated Building Management Systems, Safety & Security Systems

• Honeywell Automation: Building Management Systems (Tritium/Niagara Software, IO 30P, PUL6439, WEB 201 & Field Devices), Integrated Security Solution [Access Control system-NS-2, surveillance (CCTV) with perimeter], Fire

& Life safety Solution [Morley,Esser & Notifier].

• Siemen’s Building Technologies: Building Management Systems [Desigo software, System Integrator (PXG 80N), DDC Controller (PXC Series) with Field Devices].

• Johnson Controls: Building Management Systems [Metasys s/w, System Integrator (NAE Series & NCE), DDC Controller (FEC Series IOM 4711, IOM 2711 & IOM 1711) with Field Devices].

• Schneider Electric: Building Management Systems [TAC Vista s/w, System Integrator (Xenta Series), DDC Controller (Xenta Series & IO Modules) with Field Devices] Handled – Process Control Instrumentation Systems

• Nippon Instruments: Temperature, pressure level and Flow Sensors & switches.

• Waree Instruments: Temperature, pressure level and Flow Sensors & switches. Certificate Course: Project Management in line with PMP

• Project Planning

• Resource Management, Training & Development

• Client Management

• Project Accounting and Finance

• Project Control & Quality

• Internal Project Reporting and Administration

Education

B.E., Instrumentation & Control (1994 – 1998) Adhiyamaan College of Engineering, University of Madras, India. Personal

Father’s Name : Ayyasamy

Date of Birth : 01.05.1977

Sex : Male

Nationality : Indian

Marital Status : Married

India Driving License : F/TN/32/002886/2006 Valid up to 21-08-2026 Passport : H9981225 Expiry on 19-04-2020

Language Known : Tamil, English and Hindi

Address for Communication : BF2, Skyline Elegance Apartments, Plot: 1,2,3, Sri Lakshmi Sarathy Nagar, Behind: CBI Police Officer’s colony,

Vengaivasal, Chennai-73. India.



Contact this candidate