SIMPLICIO C. BALMES
SIMLONG BATANGAS CITY
Mobile Number 091********/090********
E-mail **********@*****.***
POSITION APPLIED : 1. MECHANICAL FOREMAN
2. ROTATING MILLWRIGHT
PERSONAL BACKGROUND
Date of Birth : 17th May 1967
Place of Birth : Simlong Batangas City
Civil Status : Married
SSS No. : 04-0788351-6
TIN : 179-606-541
PAG-IBIG No. : 121*-****-****
PHILHEALTH No : 01-051275547-5
EDUCATIONAL BACKGROUND
Undergraduate of BS in Marine Transportation at Lyceum of Batangas
Completed 3 semester of General Radio Communication Operator at Filipino Academy of Scientific Trade
SPECIAL KNOWLEDGE AND SKILLS
Can operate some heavy equipment including forklift
Computer literate on MS Word, MS Excel, MS Power point and other Window based application
Knowledge of Maximo Computerized Maintenance Management System
Work with minimal supervision and can plan job to be done
Able to read and interpret isometric drawing, P and ID, lay-out and erection drawing, cross sectional, part list and other.
Can do gas cutting and arc welding.
Knowledge in pipe fabrication, pipe erection, steel fabrication and erection.
TRAINING AND SEMINARS ATTENDED
Electronics Servicing Technician
Mobile Power Vocational School
14 July 1988, Batangas City
Total Safety Task Instruction
Brown and Roots Industrial Services Philippines Incorporated
18 May 1999
Values and Attitude Enhancement Program
Days Hotel, Tagaytay City
21 May 1999
Maximo Computerized Maintenance Management System
JG Summit Petrochemical Corporation (Maintenance Conference Room)
05 October 1999
Basic Lapping Operation
“Hyprez 24 inches Lapping System EK-610-I”
JG Summit Petrochemical Corporation (Maintenance Workshop)
13 January 2000
Tools Technology (Basic and Precision)
Gokongwei Brother Foundation Technical Training Center
Pasig City
29 March 2000
5S Orientation Seminar
JG Summit Petrochemical Corporation
21 November 2000
Ultra High Pressure Water Jetting System
JG Summit Petrochemical Corporation
Maintenance Workshop
15 December 20000
Restricted Radio Telephone Operator Seminar
JG Summit Petrochemical Corporation
Maintenance Conference Room
21 December 2000
Belzona Machinery and Equipment, Building and Structure Maintenance System Seminar
JG Summit Petrochemical Corporation (Maintenance Conference Room)
11 May 2001
Environmental Safety Seminar
Oil and Chemical Spill Response Act
Philippines Environmental and Technological Systems and Services Incorporated
30 October 2001
Pneumatic Control Technology
JG Summit Petrochemical Corporation
06 February 2002
Hydraulic and Pneumatic Tools and Equipment Maintenance Technical Training
Smart Process Integration Incorporated
JG Summit Petrochemical Corporation (Maintenance Workshop)
20 February 200
BRIEF WORK EXPERIENCES DESCRIPTON
Fifteen solid years of working experiences in the field of mechanical construction and maintenance of mechanical equipment. From foundation preparation, installation to coupling alignment, lubrication, punch list, commissioning and start up, to maintenance of petrochemical and power plant, naphtha cracking, sanitary napkins manufacturing machines, flexible printing line, confectioneries mechanical equipment and facilities.
Sound knowledge in equipment maintenance specially on rotating machineries such as reciprocating and centrifugal compressors, vertical, centrifugal, reciprocating and metering pumps, feeders, fans and lobe type impeller blowers. Sound knowledge in using portable equipment’s monitoring devices from vibration analyzer, surface thermometer,leak detector and laser tachometer. Familiar with equipment’s lubrication and lubrication frequency.
WORK EXPERIENCES
Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED
BUILDSWELL CONSTUCTION AND TRADING
Position : Technical Service Assistant/ Project Supervisor
Duration : 02 August 2017 to 31 July 2018
Company : PACERS TRADING AND SERVICE
Lamao, Libjo Batangas City
Position : Project Coordinator
Duration : 01 April 2017 to 15 July 2017
Company : NIKKERU PLANT MAINTENANCE SOLUTION INCORPORATED
Client : Taganito High Pressure Acid Leaching Nickel Plant (THPal)
Taganito Claver, Surigao Del Norte
Project : Process A and B Minor Shutdown
Position : Mechanical Technician
Duration : 24 February 2017 to 29 March 2017
Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED
Client : Puyat Steel Corporation
Barangay Masaya, Rosario Batangas And
Easy Bio/iFeed Mill Corporation
Banay-banay 1, San Jose Batangas
Position : Project Coordinator/HSE Officer
Duration : 02 November 2016 to 15 February 2017
Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED
Client : JG Summit Petrochemical Corporation- Maintenance
Simlong Batangas City
Position : Senior Mechanical Technician
Duration : 11 October 2015 to 27 October 2016
Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED
Client : JG Summit Petrochemical Corporation-PECEP
Simlong Batangas City
Project : Installation of New Big Bag Machine
Position : Mechanical Foreman
Duration : 24 September 2014 to 10 October 2015
Company : AQUAGEN TECHNOLOGIES INCORPORATED
Client : JG Summit Petrochemical Corporation
Simlong Batangas City
Project : Installation of Additional Nitrogen Compressor and Vent Refrigeration Unit
Position : Mechanical Foreman
Duration : 02 July 2014 to 20 September 2014
Duties and Responsibilities
Responsible for the installation of one unit two stage Kaji reciprocating Nitrogen compressor which includes foundation preparation, actual installation and alignment, accessories installation and preparation for commissioning.
Assist in the fabrication and installation of piping spool for main compressor and after cooler.
Responsible for installation of one unit additional Vent Refrigeration Unit for hydrocarbon recovery at Vent Recovery area which includes foundation preparation, actual installation and alignment, accessories installation and preparation for commissioning.
Company : CPG Contractor Services
Client : Toyo Thai Corporation PLC
Project : JG Summit Petrochemical Corporation
Polyethylene Capacity Expansion Project
Simlong Batangas City
Commissioning and Start-up
Position : Mechanical Foreman
Duration ; 09 April 2014 to 30 May 2014
Duties and Responsibilities
Perform hot alignment of all pelleting equipment including mixer motor to speed reducer, reducer to continuous mixer, melt pump motor to gear reducer, gear reducer to gear pump. pelletizer motor to underwater pelletizer shaft, perpendicularity alignment between die plate to pelletizer knife holder.
Install coupling spacer, provision of lubrication for coupling and install coupling cover on all equipment after hot alignment procedure.
Install equipment accessories, provide lubrication and prepare the equipments for no load operation.
Monitor, takes equipment operation parameter during equipment no load test runs using portable equipment's monitoring devices.
Assist PE operation, equipment vendors and Toyo-Thai commissioning group for the start-up of all pelleting and auxiliary equipment during load and equipment performance run.
Rectifies line leaks, clean suction and discharge filters of lube oil, PCW line and hydraulic system.
Prepare auxiliary equipments for commissioning and equipment start-up.
Coordinates with mechanical inspector for additional works and punch list.
Company : D and Y Allied Services Corporation
Client : Toyo Thai Philippines
Project : JG Summit Petrochemical Corporation
Polyethylene Capacity Expansion Project
Simlong Batangas City
Position : Millwright Foreman (Stationary and Rotating Equipment)
Duration : 02 January 2012 to 25 March 2014
Duties and Responsibilities
Responsible for overseeing the assigned task to my group in our designated place of work such as T2 area, raw material and purification, reactor area, vent recovery, product silos, bagging area, UCAT and pelleting building.
In charge in securing work permits from safety officer and preparation of tools and materials needed for the assigned jobs.
Coordinates with project engineer and supervisor with the day schedule jobs and safety officers for possible job related incidents.
In charge of equipment foundation preparation which includes plotting coordinates and lay-outs together with survey engineer.
Instruct and assist my co-worker in chipping the foundation and installing padding plates.
In charge for the preparation and actual installation of stationary equipments like drums, exchangers, vessels etc. in all areas of the plant like raw materials and purification, pelleting units and vent recovery areas.
In charges also for equipment alignment like centering and leveling alignment of all installed stationary mechanical equipments.
In charge in the preparation, transfer to site, installation and alignment of platform and ladder of every erected stationary equipments.
In charge for the preparation, actual installation and alignment of all mechanical equipment in the vent recovery area including one unit of Burkhart 3 stages reciprocating compressor, suction and discharge pulsation damper, one unit lube oil system, two unit cooling water pumps, vent refrigeration system and auxiliaries, 3 unit multi-stage pumps, condensers and exchangers.
In charge for the preparation, actual installation and alignment of 3 additional aim grade silos, 2 lines of conveying system which includes lobe type blowers, after cooler, discharge filters and product rotary feeders.
In charge for the preparation, actual installation and alignment of one unit 20 tons per hour Kobelco pelleting unit which include continuous mixer, gear reducer, an ABB drive motor and barring unit, melt pump, melt pump speed reducer and motor, melt screen changer, die plate and under water pelletizer, and all pelleting equipments and accessories.
In charge in the preparation, actual installation and alignment of one unit bagging system which includes packing bin, elutriator system, feeders, modifications, pre-commissioning and punch list.
Prepare job accomplishment report for the day and job schedule for the next day and hand over to office staff for encoding. Plot the finished jobs to the project progress report table.
Act as mechanical supervisor and tasked to handle pre-commissioning of all remaining job, punch list and modification, preparation for start-up of all installed mechanical equipments.
Company : D and Y Allied Services Corporation
Client : Daelim Philippines Incorporated
Project : JG Summit Naphtha Cracker Project
Simlong Batangas City
Position : Millwright (Stationary and Rotating Equipment)
Duration : 09 November 2011 to 02 January 2012
Duties and Responsibilities
Involve in the ground assembly and erection of area 700 structural and pipe rack.
In charge in the foundation preparation and installation of mechanical equipments at area 0600,0700, 0800, 0900 and 3100 including foundation lay-out, chipping, padding, actual equipment installation.
Involve in foundation preparation, actual erection and alignment of 9 unit cooling water plate exchangers.
Alignment, centering, leveling, and plumbness of stationary equipments like plant and instrument air holder, sulphuric acid drum, potable water surge tank and other utility stationary equipment at Area 3100.
Involve in the foundation preparation, actual erection and alignment of process high tower vessel, tanks, drums, reactor and exchangers at area 0700, 0600, 0800 and 0900.
Involve also in the foundation preparation, actual erection, centering, leveling and coupling alignment of two motor and one steam turbine driven PAP Air Compressor Package.
Involve in the foundation preparation, actual erection and alignment of process centrifugal pumps at area 0700, 0800 and 0900.
Involve in foundation preparation, actual installation and alignment of three motor and one steam turbine driven centrifugal cooling water circulation pumps.
Involve in the preparation of foundation, chipping and padding, actual installation, centering and alignment of four bowl type sea water supply pump.
Responsible for the foundation preparation, chipping, actual installation of sea water intake facilities such as inlet and outlet travelling screen stop gate, travelling band screen, trash rake and trash rack, sea water pump inlet stop gate and other facilities.
Assists equipment vendor for the commissioning and start-up of all installed equipments in the utilities area such as sea water intake, plant and instrument air, fire water system, desalination and demineralization, cooling water circulation unit, BFO area and other plat utilities.
Company : GAD Builders and Enterprises
Client : Procter and Gamble Philippines
Women’s and Children Care Area
Science Park, Cabuyao Laguna
Project : 2nd LCC Sanitary Napkins Manufacturing Machine Installation
Position : Millwright
Duration : 12 December 2010 to 16 February 2011
Duties and Responsibilities
Erection of enclosure and clearing of jobsite according to client requirements.
Prepare the sites where the equipments will be installed which include plotting of lay-outs and coordinates.
Unload from the shipper, unpacked and transport the equipments in the location where it was going to laid by means of dolly and rollers.
Centering, plumbness, leveling and complete alignment of 1 unit continuous sanitary napkin manufacturing machine.
Accessories installation which includes setting up of gears, fan and timing belts, piping for supplies and exhaust, grounding cables, platforms, rollers and un-winder, conveyors and enclosures side by side by the area and equipment custodian.
Assist in the fabrication, installation, hot tapping, hydro testing of fire water lines and sprinkler systems.
Assist in fabrication and installation of exhaust system, dust collector bins and pneumatic supply to the machine.
Dismantle existing experimental machine and put it in the archive section.
Assist on testing, start-up and commissioning of the installed equipments.
Company : GAD Builders and Enterprises
Client : Consolidated Food Corporation
Flexible Packaging Division
Simlong Batangas City
Project : Installation of Printing, Rewinders, Slitting and Extrusion Machines
Position : Millwright
Duration : 02 August 2010 to 15 January 2011
Duties and responsibilities
Preparation for the arrival of new equipment at site including preparation of tools, lifting paraphernalia’s, drawings and the site where the equipment will be installed.
Transfering of existing equipment into other location to make way for the installation of additional equipments.
Preparation of location where new equipment is to be installed which include plotting of lay-outs and coordinates as per client request and equipment installation drawing.
Laying of stainless plates where the new sets of printing machines will be installed which includes seaming it to each other by means of welding, drilling a hole in the flooring for the anchor bolts of the sheets, welding and grinding the anchor bolts which holds the stainless sheets in its position, and finally, cutting of square holes for the foot of machine insertion.
Unloading, unpacking, tagging of the equipments as its arrive at site and directly installed in the designated location which includes 1 set of Tandem Extrusion Machine, 2 sets of Printing Machines, 5 units of Jumbo Rewinders, 5 units of Slitting, 3 sets of Sealing, and 4 units of Mini rewinding machines.
Centering, plumbness, leveling and complete alignment of all installed equipments, accessories attachment, commissioning and start-up of all installed equipments side by side with the equipment vendors.
Fabricate, installed and commission all utilities and supplies for the said equipment which includes plant air and chilling water supplies.
Assist in fabrication and installation of additional chilled water supply piping main headers and provides insulations and cladding.
Assist in fabrication and installation of additional main headers of fire water piping, hose boxes, fire water pumps, hydro test and commission.
Company : SPI Corporation
Stork Philippines Incorporated
Maintenance and Engineering Department
1 Air Strip, Silangan Industrial State
Canlubang, Laguna
Position : Line Mechanic
Duration : 23 June 2005 to 10 August 2005
Duties and Responsibilities
In charge of day to day monitoring, trouble shooting, quick repair of minor trouble, and overhauling of 1 unit soft candy including its melting drums, cooling tables, texture mixers, roller, form, cut and seal machine, and cooling discharge conveyor.
Also in charge for the safe sound operation of 2 unit hard candy lines including hot melter, steel conveyors, product forming dies, chiller and cooling conveyor, QA/QC conveyor, and wrapping machine.
In charge in the sound operation of product wrapping machines, sorting machines, product counter, weighing and bagging machines.
Assist HVAC technician in ensuring sound operation of all HVAC system, air conditioning units and all chiller.
Prepare shift daily work report, encodes and turn-over to mechanical supervisor.
Assist warehouse man in the inventory and PO’ing machine spare parts and consumables.
Company : JG Summit Petrochemical Corporation
Maintenance and Engineering Department
Simlong Batangas City
Position : Mechanical Technician (Stationary and Rotating)
Duration : 18 November 1998 to 12 September 2003
Duties and Responsibilities
Responsible for the maintenance, troubleshooting, monitoring, trending and overhauling of mechanical facilities in accordance with planned activities of preventive and corrective maintenance based on Maximo Computerized Maintenance Management System.
Experience several times of doing plant wide annual turn-around maintenance of two unit Unipol technology type Polyethylene and one unit Polypropylene plant including reactors and pelleting facilities, it related equipment such as Ebara centrifugal cycle gas compressor and turbine, cycle gas cooler and pumps, lube oil units, Mark 5 type catalyst feeders, valves, product discharge system, Kobelco Continuous mixer, melt pump, pelletizer and other reaction and pelleting equipment and accessories.
Overhauling, reconditioning, and preventive maintenance of Sulzer and Burkhart Vent Recovery, IHI Boil- off Gas, Ebara Ethylene feed, Nitrogen package, Air package and all vertical, horizontal, V-type, process and utility compressor.
Familiar with overhauling, monitoring and lubrication of all horizontal and vertical pumps.
Responsible for the maintenance, trouble shooting, monitoring and overhauling of 3 lines of Haver and Boeker Form, Fill and Seal packaging equipment, 3 unit Beumer Paletpac palletizing machine, one unit Beumer stretch hood and two units Windmoller and Holscher bag making machine.
Responsible for the maintenance, troubleshooting, monitoring and overhauling of all Laboratory equipments which includes of 2 unit Blown Film machines (High Density Polyethylene {HDPE} and Low Linear Density Polyethylene {LLDPE}) line and extruders, 3 unit hydraulic press, 1 unit Blown Moulding and extruder, 1 unit Injection Moulding and extruder, 1 unit of Cast Film machine and extruder and 1 unit Tape film and extruder and other test and utility laboratory equipments.
Perform a 4 times plant wide tour in one 8 hour duty as shifter noticing all machine in operation to ensure no equipment will prematurely and unexpected breakdown during operation.
Always work in coordination with area/ unit supervisor and safety officers about the job to be executed in their respective areas, strictly adhere to health and safety procedure including the permit system.
Company : Brown and Roots Industrial Services, Philippines
Client : Contracted Maintenance of JG Summit Petrochemical Corporation
Post-commissioning, punch list and additional projects
Position : Millwright 3
Duration : 14 May 1998 to 17 November 1998
Duties and Responsibilities
Perform mechanical equipment maintenance on all pelleting, reaction, raw material and purification, OSBL, water treatment and facilities, sea water intake, unloading pier, tank yard, QA/QC laboratory, product bagging and storage area.
Do coupling re-alignment on all overhauled pumps and compressors using basic and precision tools.
Internal and external cleaning of some surge hoppers, purge and surge bins, reactors, PCW tanks, silos and product conveying systems.
Cleaning and servicing of all process piping suction strainers and discharge filters.
Company : Mitsubishi Heavy Industries
Client : JG Summit Petrochemical Corporation Project
Commissioning and Start Up
Position : Millwright
Duration : 15 January 1998 to 15 May 1998
Company : Nippon Express Philippines Corporation
Heavy Haulage and Construction
Client : JG Summit Petrochemical Corporation Project
Mechanical Installation under Mitsubishi Heavy Industries
Position : Millwright
Duration : 03 February 1997 to 24 March 1998
Reference Persons
1.Honorable Rudolfo Mendoza
Barangay Chairman
Simlong Batangas City
2.Honorable Wenilda Caraig
Barangay Councilor
Simlong Batangas City
Contact Person
Mrs. Evelyn A. Balmes
Ms Julieta C. Balmes
120 Sitio Culayo Street
Simlong Batangas City
Mobile Numbers 091*-***-****/091*-***-****
SIMPLICIO CULIS BALMES
Applicant Signature