Post Job Free

Resume

Sign in

Mechanical Foreman/Senior Mechanical Technician

Location:
Cuta, Batangas, 4200, Philippines
Salary:
Php 30,000.00
Posted:
August 18, 2018

Contact this candidate

Resume:

SIMPLICIO C. BALMES

*** ***** ****** ******

SIMLONG BATANGAS CITY

Mobile Number 091********/090********

E-mail ac6pra@r.postjobfree.com

POSITION APPLIED : 1. MECHANICAL FOREMAN

2. ROTATING MILLWRIGHT

PERSONAL BACKGROUND

Date of Birth : 17th May 1967

Place of Birth : Simlong Batangas City

Civil Status : Married

SSS No. : 04-0788351-6

TIN : 179-606-541

PAG-IBIG No. : 121*-****-****

PHILHEALTH No : 01-051275547-5

EDUCATIONAL BACKGROUND

Undergraduate of BS in Marine Transportation at Lyceum of Batangas

Completed 3 semester of General Radio Communication Operator at Filipino Academy of Scientific Trade

SPECIAL KNOWLEDGE AND SKILLS

Can operate some heavy equipment including forklift

Computer literate on MS Word, MS Excel, MS Power point and other Window based application

Knowledge of Maximo Computerized Maintenance Management System

Work with minimal supervision and can plan job to be done

Able to read and interpret isometric drawing, P and ID, lay-out and erection drawing, cross sectional, part list and other.

Can do gas cutting and arc welding.

Knowledge in pipe fabrication, pipe erection, steel fabrication and erection.

TRAINING AND SEMINARS ATTENDED

Electronics Servicing Technician

Mobile Power Vocational School

14 July 1988, Batangas City

Total Safety Task Instruction

Brown and Roots Industrial Services Philippines Incorporated

18 May 1999

Values and Attitude Enhancement Program

Days Hotel, Tagaytay City

21 May 1999

Maximo Computerized Maintenance Management System

JG Summit Petrochemical Corporation (Maintenance Conference Room)

05 October 1999

Basic Lapping Operation

“Hyprez 24 inches Lapping System EK-610-I”

JG Summit Petrochemical Corporation (Maintenance Workshop)

13 January 2000

Tools Technology (Basic and Precision)

Gokongwei Brother Foundation Technical Training Center

Pasig City

29 March 2000

5S Orientation Seminar

JG Summit Petrochemical Corporation

21 November 2000

Ultra High Pressure Water Jetting System

JG Summit Petrochemical Corporation

Maintenance Workshop

15 December 20000

Restricted Radio Telephone Operator Seminar

JG Summit Petrochemical Corporation

Maintenance Conference Room

21 December 2000

Belzona Machinery and Equipment, Building and Structure Maintenance System Seminar

JG Summit Petrochemical Corporation (Maintenance Conference Room)

11 May 2001

Environmental Safety Seminar

Oil and Chemical Spill Response Act

Philippines Environmental and Technological Systems and Services Incorporated

30 October 2001

Pneumatic Control Technology

JG Summit Petrochemical Corporation

06 February 2002

Hydraulic and Pneumatic Tools and Equipment Maintenance Technical Training

Smart Process Integration Incorporated

JG Summit Petrochemical Corporation (Maintenance Workshop)

20 February 200

BRIEF WORK EXPERIENCES DESCRIPTON

Fifteen solid years of working experiences in the field of mechanical construction and maintenance of mechanical equipment. From foundation preparation, installation to coupling alignment, lubrication, punch list, commissioning and start up, to maintenance of petrochemical and power plant, naphtha cracking, sanitary napkins manufacturing machines, flexible printing line, confectioneries mechanical equipment and facilities.

Sound knowledge in equipment maintenance specially on rotating machineries such as reciprocating and centrifugal compressors, vertical, centrifugal, reciprocating and metering pumps, feeders, fans and lobe type impeller blowers. Sound knowledge in using portable equipment’s monitoring devices from vibration analyzer, surface thermometer,leak detector and laser tachometer. Familiar with equipment’s lubrication and lubrication frequency.

WORK EXPERIENCES

Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED

BUILDSWELL CONSTUCTION AND TRADING

Position : Technical Service Assistant/ Project Supervisor

Duration : 02 August 2017 to 31 July 2018

Company : PACERS TRADING AND SERVICE

Lamao, Libjo Batangas City

Position : Project Coordinator

Duration : 01 April 2017 to 15 July 2017

Company : NIKKERU PLANT MAINTENANCE SOLUTION INCORPORATED

Client : Taganito High Pressure Acid Leaching Nickel Plant (THPal)

Taganito Claver, Surigao Del Norte

Project : Process A and B Minor Shutdown

Position : Mechanical Technician

Duration : 24 February 2017 to 29 March 2017

Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED

Client : Puyat Steel Corporation

Barangay Masaya, Rosario Batangas And

Easy Bio/iFeed Mill Corporation

Banay-banay 1, San Jose Batangas

Position : Project Coordinator/HSE Officer

Duration : 02 November 2016 to 15 February 2017

Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED

Client : JG Summit Petrochemical Corporation- Maintenance

Simlong Batangas City

Position : Senior Mechanical Technician

Duration : 11 October 2015 to 27 October 2016

Company : CASTORAMA MANINVEST SPECIALIST INCORPORATED

Client : JG Summit Petrochemical Corporation-PECEP

Simlong Batangas City

Project : Installation of New Big Bag Machine

Position : Mechanical Foreman

Duration : 24 September 2014 to 10 October 2015

Company : AQUAGEN TECHNOLOGIES INCORPORATED

Client : JG Summit Petrochemical Corporation

Simlong Batangas City

Project : Installation of Additional Nitrogen Compressor and Vent Refrigeration Unit

Position : Mechanical Foreman

Duration : 02 July 2014 to 20 September 2014

Duties and Responsibilities

Responsible for the installation of one unit two stage Kaji reciprocating Nitrogen compressor which includes foundation preparation, actual installation and alignment, accessories installation and preparation for commissioning.

Assist in the fabrication and installation of piping spool for main compressor and after cooler.

Responsible for installation of one unit additional Vent Refrigeration Unit for hydrocarbon recovery at Vent Recovery area which includes foundation preparation, actual installation and alignment, accessories installation and preparation for commissioning.

Company : CPG Contractor Services

Client : Toyo Thai Corporation PLC

Project : JG Summit Petrochemical Corporation

Polyethylene Capacity Expansion Project

Simlong Batangas City

Commissioning and Start-up

Position : Mechanical Foreman

Duration ; 09 April 2014 to 30 May 2014

Duties and Responsibilities

Perform hot alignment of all pelleting equipment including mixer motor to speed reducer, reducer to continuous mixer, melt pump motor to gear reducer, gear reducer to gear pump. pelletizer motor to underwater pelletizer shaft, perpendicularity alignment between die plate to pelletizer knife holder.

Install coupling spacer, provision of lubrication for coupling and install coupling cover on all equipment after hot alignment procedure.

Install equipment accessories, provide lubrication and prepare the equipments for no load operation.

Monitor, takes equipment operation parameter during equipment no load test runs using portable equipment's monitoring devices.

Assist PE operation, equipment vendors and Toyo-Thai commissioning group for the start-up of all pelleting and auxiliary equipment during load and equipment performance run.

Rectifies line leaks, clean suction and discharge filters of lube oil, PCW line and hydraulic system.

Prepare auxiliary equipments for commissioning and equipment start-up.

Coordinates with mechanical inspector for additional works and punch list.

Company : D and Y Allied Services Corporation

Client : Toyo Thai Philippines

Project : JG Summit Petrochemical Corporation

Polyethylene Capacity Expansion Project

Simlong Batangas City

Position : Millwright Foreman (Stationary and Rotating Equipment)

Duration : 02 January 2012 to 25 March 2014

Duties and Responsibilities

Responsible for overseeing the assigned task to my group in our designated place of work such as T2 area, raw material and purification, reactor area, vent recovery, product silos, bagging area, UCAT and pelleting building.

In charge in securing work permits from safety officer and preparation of tools and materials needed for the assigned jobs.

Coordinates with project engineer and supervisor with the day schedule jobs and safety officers for possible job related incidents.

In charge of equipment foundation preparation which includes plotting coordinates and lay-outs together with survey engineer.

Instruct and assist my co-worker in chipping the foundation and installing padding plates.

In charge for the preparation and actual installation of stationary equipments like drums, exchangers, vessels etc. in all areas of the plant like raw materials and purification, pelleting units and vent recovery areas.

In charges also for equipment alignment like centering and leveling alignment of all installed stationary mechanical equipments.

In charge in the preparation, transfer to site, installation and alignment of platform and ladder of every erected stationary equipments.

In charge for the preparation, actual installation and alignment of all mechanical equipment in the vent recovery area including one unit of Burkhart 3 stages reciprocating compressor, suction and discharge pulsation damper, one unit lube oil system, two unit cooling water pumps, vent refrigeration system and auxiliaries, 3 unit multi-stage pumps, condensers and exchangers.

In charge for the preparation, actual installation and alignment of 3 additional aim grade silos, 2 lines of conveying system which includes lobe type blowers, after cooler, discharge filters and product rotary feeders.

In charge for the preparation, actual installation and alignment of one unit 20 tons per hour Kobelco pelleting unit which include continuous mixer, gear reducer, an ABB drive motor and barring unit, melt pump, melt pump speed reducer and motor, melt screen changer, die plate and under water pelletizer, and all pelleting equipments and accessories.

In charge in the preparation, actual installation and alignment of one unit bagging system which includes packing bin, elutriator system, feeders, modifications, pre-commissioning and punch list.

Prepare job accomplishment report for the day and job schedule for the next day and hand over to office staff for encoding. Plot the finished jobs to the project progress report table.

Act as mechanical supervisor and tasked to handle pre-commissioning of all remaining job, punch list and modification, preparation for start-up of all installed mechanical equipments.

Company : D and Y Allied Services Corporation

Client : Daelim Philippines Incorporated

Project : JG Summit Naphtha Cracker Project

Simlong Batangas City

Position : Millwright (Stationary and Rotating Equipment)

Duration : 09 November 2011 to 02 January 2012

Duties and Responsibilities

Involve in the ground assembly and erection of area 700 structural and pipe rack.

In charge in the foundation preparation and installation of mechanical equipments at area 0600,0700, 0800, 0900 and 3100 including foundation lay-out, chipping, padding, actual equipment installation.

Involve in foundation preparation, actual erection and alignment of 9 unit cooling water plate exchangers.

Alignment, centering, leveling, and plumbness of stationary equipments like plant and instrument air holder, sulphuric acid drum, potable water surge tank and other utility stationary equipment at Area 3100.

Involve in the foundation preparation, actual erection and alignment of process high tower vessel, tanks, drums, reactor and exchangers at area 0700, 0600, 0800 and 0900.

Involve also in the foundation preparation, actual erection, centering, leveling and coupling alignment of two motor and one steam turbine driven PAP Air Compressor Package.

Involve in the foundation preparation, actual erection and alignment of process centrifugal pumps at area 0700, 0800 and 0900.

Involve in foundation preparation, actual installation and alignment of three motor and one steam turbine driven centrifugal cooling water circulation pumps.

Involve in the preparation of foundation, chipping and padding, actual installation, centering and alignment of four bowl type sea water supply pump.

Responsible for the foundation preparation, chipping, actual installation of sea water intake facilities such as inlet and outlet travelling screen stop gate, travelling band screen, trash rake and trash rack, sea water pump inlet stop gate and other facilities.

Assists equipment vendor for the commissioning and start-up of all installed equipments in the utilities area such as sea water intake, plant and instrument air, fire water system, desalination and demineralization, cooling water circulation unit, BFO area and other plat utilities.

Company : GAD Builders and Enterprises

Client : Procter and Gamble Philippines

Women’s and Children Care Area

Science Park, Cabuyao Laguna

Project : 2nd LCC Sanitary Napkins Manufacturing Machine Installation

Position : Millwright

Duration : 12 December 2010 to 16 February 2011

Duties and Responsibilities

Erection of enclosure and clearing of jobsite according to client requirements.

Prepare the sites where the equipments will be installed which include plotting of lay-outs and coordinates.

Unload from the shipper, unpacked and transport the equipments in the location where it was going to laid by means of dolly and rollers.

Centering, plumbness, leveling and complete alignment of 1 unit continuous sanitary napkin manufacturing machine.

Accessories installation which includes setting up of gears, fan and timing belts, piping for supplies and exhaust, grounding cables, platforms, rollers and un-winder, conveyors and enclosures side by side by the area and equipment custodian.

Assist in the fabrication, installation, hot tapping, hydro testing of fire water lines and sprinkler systems.

Assist in fabrication and installation of exhaust system, dust collector bins and pneumatic supply to the machine.

Dismantle existing experimental machine and put it in the archive section.

Assist on testing, start-up and commissioning of the installed equipments.

Company : GAD Builders and Enterprises

Client : Consolidated Food Corporation

Flexible Packaging Division

Simlong Batangas City

Project : Installation of Printing, Rewinders, Slitting and Extrusion Machines

Position : Millwright

Duration : 02 August 2010 to 15 January 2011

Duties and responsibilities

Preparation for the arrival of new equipment at site including preparation of tools, lifting paraphernalia’s, drawings and the site where the equipment will be installed.

Transfering of existing equipment into other location to make way for the installation of additional equipments.

Preparation of location where new equipment is to be installed which include plotting of lay-outs and coordinates as per client request and equipment installation drawing.

Laying of stainless plates where the new sets of printing machines will be installed which includes seaming it to each other by means of welding, drilling a hole in the flooring for the anchor bolts of the sheets, welding and grinding the anchor bolts which holds the stainless sheets in its position, and finally, cutting of square holes for the foot of machine insertion.

Unloading, unpacking, tagging of the equipments as its arrive at site and directly installed in the designated location which includes 1 set of Tandem Extrusion Machine, 2 sets of Printing Machines, 5 units of Jumbo Rewinders, 5 units of Slitting, 3 sets of Sealing, and 4 units of Mini rewinding machines.

Centering, plumbness, leveling and complete alignment of all installed equipments, accessories attachment, commissioning and start-up of all installed equipments side by side with the equipment vendors.

Fabricate, installed and commission all utilities and supplies for the said equipment which includes plant air and chilling water supplies.

Assist in fabrication and installation of additional chilled water supply piping main headers and provides insulations and cladding.

Assist in fabrication and installation of additional main headers of fire water piping, hose boxes, fire water pumps, hydro test and commission.

Company : SPI Corporation

Stork Philippines Incorporated

Maintenance and Engineering Department

1 Air Strip, Silangan Industrial State

Canlubang, Laguna

Position : Line Mechanic

Duration : 23 June 2005 to 10 August 2005

Duties and Responsibilities

In charge of day to day monitoring, trouble shooting, quick repair of minor trouble, and overhauling of 1 unit soft candy including its melting drums, cooling tables, texture mixers, roller, form, cut and seal machine, and cooling discharge conveyor.

Also in charge for the safe sound operation of 2 unit hard candy lines including hot melter, steel conveyors, product forming dies, chiller and cooling conveyor, QA/QC conveyor, and wrapping machine.

In charge in the sound operation of product wrapping machines, sorting machines, product counter, weighing and bagging machines.

Assist HVAC technician in ensuring sound operation of all HVAC system, air conditioning units and all chiller.

Prepare shift daily work report, encodes and turn-over to mechanical supervisor.

Assist warehouse man in the inventory and PO’ing machine spare parts and consumables.

Company : JG Summit Petrochemical Corporation

Maintenance and Engineering Department

Simlong Batangas City

Position : Mechanical Technician (Stationary and Rotating)

Duration : 18 November 1998 to 12 September 2003

Duties and Responsibilities

Responsible for the maintenance, troubleshooting, monitoring, trending and overhauling of mechanical facilities in accordance with planned activities of preventive and corrective maintenance based on Maximo Computerized Maintenance Management System.

Experience several times of doing plant wide annual turn-around maintenance of two unit Unipol technology type Polyethylene and one unit Polypropylene plant including reactors and pelleting facilities, it related equipment such as Ebara centrifugal cycle gas compressor and turbine, cycle gas cooler and pumps, lube oil units, Mark 5 type catalyst feeders, valves, product discharge system, Kobelco Continuous mixer, melt pump, pelletizer and other reaction and pelleting equipment and accessories.

Overhauling, reconditioning, and preventive maintenance of Sulzer and Burkhart Vent Recovery, IHI Boil- off Gas, Ebara Ethylene feed, Nitrogen package, Air package and all vertical, horizontal, V-type, process and utility compressor.

Familiar with overhauling, monitoring and lubrication of all horizontal and vertical pumps.

Responsible for the maintenance, trouble shooting, monitoring and overhauling of 3 lines of Haver and Boeker Form, Fill and Seal packaging equipment, 3 unit Beumer Paletpac palletizing machine, one unit Beumer stretch hood and two units Windmoller and Holscher bag making machine.

Responsible for the maintenance, troubleshooting, monitoring and overhauling of all Laboratory equipments which includes of 2 unit Blown Film machines (High Density Polyethylene {HDPE} and Low Linear Density Polyethylene {LLDPE}) line and extruders, 3 unit hydraulic press, 1 unit Blown Moulding and extruder, 1 unit Injection Moulding and extruder, 1 unit of Cast Film machine and extruder and 1 unit Tape film and extruder and other test and utility laboratory equipments.

Perform a 4 times plant wide tour in one 8 hour duty as shifter noticing all machine in operation to ensure no equipment will prematurely and unexpected breakdown during operation.

Always work in coordination with area/ unit supervisor and safety officers about the job to be executed in their respective areas, strictly adhere to health and safety procedure including the permit system.

Company : Brown and Roots Industrial Services, Philippines

Client : Contracted Maintenance of JG Summit Petrochemical Corporation

Post-commissioning, punch list and additional projects

Position : Millwright 3

Duration : 14 May 1998 to 17 November 1998

Duties and Responsibilities

Perform mechanical equipment maintenance on all pelleting, reaction, raw material and purification, OSBL, water treatment and facilities, sea water intake, unloading pier, tank yard, QA/QC laboratory, product bagging and storage area.

Do coupling re-alignment on all overhauled pumps and compressors using basic and precision tools.

Internal and external cleaning of some surge hoppers, purge and surge bins, reactors, PCW tanks, silos and product conveying systems.

Cleaning and servicing of all process piping suction strainers and discharge filters.

Company : Mitsubishi Heavy Industries

Client : JG Summit Petrochemical Corporation Project

Commissioning and Start Up

Position : Millwright

Duration : 15 January 1998 to 15 May 1998

Company : Nippon Express Philippines Corporation

Heavy Haulage and Construction

Client : JG Summit Petrochemical Corporation Project

Mechanical Installation under Mitsubishi Heavy Industries

Position : Millwright

Duration : 03 February 1997 to 24 March 1998

Reference Persons

1.Honorable Rudolfo Mendoza

Barangay Chairman

Simlong Batangas City

2.Honorable Wenilda Caraig

Barangay Councilor

Simlong Batangas City

Contact Person

Mrs. Evelyn A. Balmes

Ms Julieta C. Balmes

120 Sitio Culayo Street

Simlong Batangas City

Mobile Numbers 091*-***-****/091*-***-****

SIMPLICIO CULIS BALMES

Applicant Signature



Contact this candidate