Post Job Free

Resume

Sign in

Project Engineer

Location:
Lagos, Nigeria
Posted:
August 15, 2018

Contact this candidate

Resume:

Name

:

Etu, Bassey Egbe (MNIMechE)

Address

:

*, ***** *****, ******* ****, Ikorodu, Lagos State.

Tel: 080********, 080********, 080********

E-mail: ac6omu@r.postjobfree.com,ac6omu@r.postjobfree.com

Sex

:

Male

Date of Birth

:

28th June, 1978

Marital Status

State of Origin

Nationality

:

:

:

Married

Cross River

Nigerian

EDUCATION:

(a) B Eng. In Mechanical Engineering, University of Port-harcourt, River State-In View

(b) Higher National Diploma (HND) in Mechanical Engineering with option in Power/Plant Engineering Technology, Petroleum Training Institute, Warri, Delta State. Nigeria [Lower Credit] – August, 2003.

(c) National Diploma (ND) in Mechanical Engineering, Petroleum Training Institute, Warri, Delta State. Nigeria [Upper Credit] – April, 2001

PROFESSIONAL MEMBERSHIP:

Corporate Member, Nigerian Institution of Mechanical Engineers (A Division of the Nigerian Society of Engineers) (MNIMechE No. E00013) – May, 2007.

Proficiency:

AutoCAD, Autodesk 3D Inventor

PDMS, QuantaCAD, Navis-works

Microsoft Office

Summary:

Experience spanning over 12 years in offshore & onshore piping and pipeline engineering design and maintenance of oil and gas facilities which include but not limited to:

Implementation of codes, standards, regulations and practices applicable to the design and construction of onshore and offshore structures / production facilities which include but not limited to API, ANSI, ASME, ASTM, NACE, DNV, etc

Generation of mechanical / piping / pipeline engineering design deliverables which include but not limited to piping and instrument diagrams (P&ID), general arrangement drawings (GA), piping and equipment isometric drawings, plot plans, as-built drawings, equipment specifications, bill of engineering measurement and evaluation (BEME), material take-off lists (MTO), hazard operability analysis (HAZOP), valve data sheets, technical studies, pipeline stress, free span, expansion, lateral buckling, crossing, wall thickness, corrosion cathodic protection

Interpersonal and organizational skills acquired from working in large Integrated, multi-racial, multi-discipline project teams within the oil & gas industries.

I am equally, familiar with international standards and codes relevant to the execution of projects: ASME B31.3, B31.4, B31.8, B16.5, API 5L, API 1111, etc. Also, I am skillful in the use of these engineering software’s: AutoCAD, Autodesk Inventor, PDMS,etc.

CERTIFICATION COURSES:

Introduction to the Basic use of Microsoft Project as a planning tool- Amazon Energy Ltd, July, 2009.

Pipe Design and Stress Analysis (ASME B31.3 & 16.5), Zories Solutions – February, 2008.

Plant Design Management System (PDMS) Equipment & Piping Design, Aveva Solutions Ltd, High Cross, Madingley Road, Cambridge CB3 OHB, United Kingdom- August, 2007.

PDMS Oil and Gas Facilities Dummy Project, Lonadek Oil and Gas Consultant-August- September, 2007.

Contractor Employee Health, Safety and Environmental Training (HSE Level 2 & 3), Nigerian Institute of Safety Professionals, SPDC Accredited- July, 2007.

Training on the use of AutoCAD Engineering Design, Petroleum Training Institute- June, 2005.

NON CERTIFICATION COURSES:

Training on Introduction to Oil & Gas Engineering- Amazon Energy Ltd, 2009.

Training on Material Selection in the Oil & Gas Sector- Amazon Energy Ltd, 2009.

Ltd,2009.

AutoCAD 2000, 2002, 2004 AND 2007 Engineering Drafting Utility- Amazon Energy Ltd, 2009.

Quality Management and Safety Site Engineers/Supervisors Training- Huawei Technology Co. Ltd/Skarf Ltd, 2006.

3D Modeling tool Autodesk Inventor- National Oilwell Varco (NOV) & Crestech Engineering Ltd, 2013

March, 2018 – To Date

National Engineering & Technical Company-NETCO (subsidiary of NNPC)

Project Handled: FEED and EPCI Cost Estimates for the Replacement of Crude and

Products Pipelines and Depots Upgrade Project

Client: NETCO (Subsidiary of NNPC)

Project Outline : The project scope of work shall involve the following:

Feasibility Study

Front End Engineering Desing (FEED)

Development of Scope of Work for EPCI

EPCI Cost Estimate

Preparation of ITBs

Position: Senior Piping Designer

Responsibilities:

Preparation of As-Built Drawings

Backdrafting and prepation of piping drawings, such as:

-Plot Plan Drawings,

-Equipment Layout Drawings,

-General Arrangement Drawings,

-Isometric Drawings

August, 2017 – February, 2018

Chevron Nigeria Limited – Homik Engineering Limited

Project Handled: Provision of Crude Oil Tank Repairs and Upgrade Services

(TANK 2)

Client: Homik Engineering Limited

Project Outline : The project scope of work shall involve the following:

Dismantling and disposal of the fixed roof plate on one (1) 200,000 Bbl fixed cone roof crude oil tank;

Conversion of the fixed cone roof tank to double deck floating roof with double seal (primary and secondary seals) with new catenary foam dam system including all support columns

Install new tank bottom support pads (foundation) consisting of sand fill, HDPE liner, and fibre reinforced concrete floor for the tank.

Install new annular and new bottom plate with leak detection system.

Containment area and bund wall repairs, re-grading, and resurfacing (outside with concrete while inside with HDPE Liner).

Modifications of tank piping, appurtenances and installation of wear plates at pipe support/ piping interfaces.

Construction of maintenance access road with concrete pad for crane access to tank roof.

Replace internal pipework, inlet spreader box and roof water down pipes

Erection, operation, and dismantling of Temporary Facilities as required for executing the work. The Temporary Facilities shall include construction camp, temporary workshops, temporary storage containers and sheds..

Modification of stairs, handrails, and walkways

Construction of swale and upgrade of drain pits within containment

Replace drain pipes across bundwall to 8” and change sluice gate valves.

Carry out shell plate thickness test and visual inspection on the internal shell plate after cleaning and perform welding repair on areas with internal corrosion found on the plate

Make good any drain requirements changed due to elevation of pipes

Position:PDMS Designer

Responsibilities:

Modeling of structural bond walls

Modeling of tank

Prepation of piping drawings, such as:

-Plot Plan Drawings,

-Equipment Layout Drawings,

-General Arrangement Drawings,

-Isometric Drawings

May, 2017 – August, 2017

Worley Parson(Intecsea)-Consortium(Crestech EngineeringLtd)

Project Handled: Bonga South-West,Aparo

Project: BSWA SURF Re-FEED Project

Client: Shell Nigeria Exploration and Production Conmpany Limited(SNEPCo)

Project Outline : The scope of this project covers the following:

2 x 10” Production Flowline Loops

1 x 14” Water Injection Flowline

flowline jumpers connected to PR-PLETs, WI-PLETs and in-line Sleds

1 x 12” Gas Export Pipeline

1 x 12” Gas Export Rigid Riser at EA RP-A

1 x 12” Gas Export Rigid Riser Tie-in Spool at EA RP-A

Position: Senior Piping (PDMS)Designer-SURF

Responsibilities:

Preparation and updating of SURF drawings,

Preparation of field Layout

Design of Mooring And Hawsers drawings

Preparation of Floating Hose Drawing

Preparation of Hull Riser Interface Drawing

Drawing of Oil Offloading Risers FPSO Hang-Off System

Preparation of Prod, Riser Elevation Drawing

Preparation of Riser Installation Drawings

Drawing of Subsea Field Layouts

Updating of Subsea Layout Approach to FPSO drawing

Updating Subsea Control System Diagram

Preparation ofOil Offloading Riser General Arrangement Drawing

Drawing of Oil Offloading Risers SPM Hang-Off System.

Aug, 2015 – November,2016

DGS Integrated Project Limited(Allied Mechanical & Pipeline Service Limited)

Project Handled: EPCI and Commissioning of NGC Compressors at Sapele

Project: EPCI and Commissioning of NGC Compressors at Sapele

Client: Nigerian Gas Company (NGC)

Project Outline : Engineering, Procurement,Construction and Commissioning

Position: Senior Piping Designer

Responsibilities:

Preparation of Plot Plan Drawing,

Equipment Layout Drawing

Piping General Arrangement (plan and elevation).

Tie-in list.

Piping MTO and Specialty item list.

Valve Data Sheet

Piping Support Location Drawing.

Production of Piping Isometrics.

Sep, 2014 – March, 2015

Kaztec Engineering Ltd/ Sinopec Addax Petroleum Nigeria Ltd / /IESL

Project Handled: Antan Field Development

Project: Antan Field Development

Client: Kaztec Engineering Ltd/ Sinopec Addax Petroleum Nigeria Ltd

Project Outline :

• Full field FEED engineering.

• 4-pile well jacket complete with power gen to support ESPs

• Brownfield tie-ins at Ebughu Pipeline and riser engineering

• Executed in Houston and Lagos

Position: Piping/Structural Engineer

Responsibilities:

Design and Production of Shop/Cutting Plans/Drawings

Elaborating sketches and ideas into drawings

Developing drawings into detail design

Monitor and supervise fitters and mates on site

Document handling in compliance with internal standards and systems

Quality and timely delivery of drawings

Collaboration with other project members

Reporting results to Lead and Project Engineer

Ensure that drawings take full regards of all health and safety requirements.

Aug, 2013 – June, 2014

National Oil Varco APL (NOV) / Crestech Engineering Ltd

Project Handled: EGINA OLT/BLT – Bouy Turret Loading

Project: EGINA OLT/BLT – Bouy Turret Loading

Client: Total E&P Nig., Ltd

Project Outline : EGINA is a deep offshore oil and gas project in Nigeria,

Located 150km from the coast. Development in 1500 m water

Depth includes a moored FPSO, an offloading calm buoy,

Production loops and injection lines. Gas is exported via

Pipeline.

Position: Autodesk Inventor 3D Designer

Responsibilities:

Design and modeling of Calm bouy structural parts

Ability to independently make a technical setup of drawings (concept to detail and method statements)

Elaborating sketches and ideas into drawings.

Developing drawings into detail design

Document handling in compliance with internal standards and systems

Quality and timely delivery of drawings

Collaboration with other project members

Reporting results to Lead/Senior Designer and Project Engineer

Ensure that drawings take full regards of all health and safety requirements.

June, 2012 – Aug, 2013

Crestech Engineering Ltd-Technip Nigeria

Project Handled:

Project: Ehra North Phase 2 (ENP2) project (FPSO Topside modifications)

Client: Esso Exploration and Production Nigeria Limited / Globestar

Project Outline :

Position: PDMS Designer

Responsibilities:

Equipment Location Drawing,

Extraction of Piping Isometric Drawing

PDMS 3D Model Drawing

Extraction of Equipments using PDMS Draf.

Clash checking and resolution using QUANTACAD.

Creation and Modification of Support on Pipes, Cable Tray and other

Structural members using MDS (Multi-Discipline Supports)

Dec., 2011 – June., 2012

Crestech Engineering Ltd-Technip Nigeria

Project Handled:

Project: Ofon Phase II EPCC 2 Project

Client: Total E&P Nig., Ltd

Project Outline : Detail Design for Installation of two wellhead platforms (OFD3 &OFD5) and two access bridges (OFP1-OFP2 & OFQ-OFP2).

Position: Piping Designer

Responsibilities:

Plot Plan Drawing,

Preparation Piping General Arrangement (plan and elevation).

PDS 3D Model Drawing

Preparation of Tie-in list.

Preparation Piping MTO and Specialty item list.

2009 – 2011

Amazon Energy Engineering Ltd, Lagos

Project Handled:

Project: Iyak “SE” Slot Add.Project (Post-IFC Modification)

Client: Mobil Producing Nigeria

Project Outline : The Scope of the Post-IFC effort involves modification of the existing Iyak SE Slot Addition IFC Package to align with the design and modification of EPC4B project on Iyak SE Wellhead Platform.

Position: PDMS Designer

Responsibilities:

3D Model Review,

Preparation of Emergency Escape Route Drawing

Preparation of Safety Equipment Arrangement on the Cellar Deck.

Preparation of Equipment Arrangent on Cellar Deck.

Preparation of Gaslift Piping MTO.

Generation of Piping Isometrics Drawings from the Model.

Preparation of Valve Data Sheet and Tie-in list

Review Piping documents and drawings.

Monitor progress work in designated area

Attending design review /Bi-weekly meetings

Project: Utorogu-Ughelli East Domgas Pipeline Project

Client: SPDC / Daewoo Nigeria

Project Outline : The Scope of Work comprises Engineering, Procurement, Construction And Commissioning of a new bulkline ( 12” x 12.5 km) and testline ( 8” x 12.5 km) for Ughelli East- Utorogu Pipeline System project (including all associated tie-in and manifold works). It also includes replacement of flow lines (6” x 5 km) and corrosion inhibition lines ( 2” x 6 km) at Ughelli-East.

Position : Piping / Pipeline Engineer

Responsibilities:

Pipeline and Mechanical Feed Review,

Preparation of mechanical/Piping/Pipeline documents feed reports,

Material take-off, valve list, valve data sheets, tie-in lists, isometrics and drafting and preparation of Piping General Arrangement.

Preparation of Pipeline Material Specification.

Production of pipeline typical detail drawings.

Review all Piping and Pipeline documents and drawings

Monitor progress work in designated area

Attending design review meetings

Project: Utonana Facilities Upgrade Project

Client: Chevron Nigeria Ltd

Project Outline : The Scope Identified in the Utonana Facilities Upgrade Consists of the following: (1) Design of New Fire Water System and Support Platform. (2). Demolition Scope of the damaged Production (Bulk) Separator and Test Separator Vessels (MBD-200 and MBD-202). (3). The Installation of a Multi-Phase Flow Meter (MPFM) for well testing. (4). Bridge between Fire Water Platform and Utility Platform. (5). Boat Landing Platform.

Position: Piping Engineer

Responsibilities:

Piping material take-offvalve list,

valve data sheets, tie-in lists, isometrics and drafting.

Setting out the plot plan, key plan and general arrangement drawing for each facility

Assurance of ensured design compliance to project specified codes and standards

Pipe routine study and design

Review all Piping documents and drawings

Attending design review meetings

Wall thickness calculation

Review of vendor Packages and Drawings.

Project: Iyak “SE” External Well Development Project

Client: Mobil Producing Nigeria

Project Outline : Detailed engineering of platform extension including structural extension, addition of production, test and gas manifolds, flow lines, gas lift and injection lines, flow lines and drain lines and tie-in to existing facilities.

Position : Piping Engineer

Responsibilities:

Generating Stress Analysis of Piping System using CAESAR II

Preparation of Pipe Support Detailed Design

Preparation of Piping Flexibility Design

Generation of Piping General Arrangement (G.A.) Drawings

Generation of Sectional Drawing from G.A. Drawings

Preparation of Pipe Support Location & Detail drawings.

Preparation of Equipment Layout Plan

Generation of Piping Isometrics Drawings

Preparation of Elevation Drawing

Routing the drain line and the blow down lines.

Interface with Civil Engineering group, for New Deck Extension

Develop & establish project deliverables list / register

Project: Brownfield Verification for Satellite Fields Development Phase 2 Project.

Client: Mobil Producing Nigeria

Project Outline: The primary purpose of the project is to conduct verifications that will allow the tie-in of risers and installation of receivers and launchers on Production and Riser platforms that will receive production from or deliver high pressure gas to future wellhead platforms.

Position: Piping / Mechanical Engineer

Responsibilities:

Preparation of primary tie-in lists,

Routing of pipes and Checking of material take-off.

Assurance of Ensured design compliance to project specified codes and standards

Pipe study and Design using PDMS for the Modules

Stress Analysis of Modules Critical Lines Pipe and Piping Component using CAESER II

Checking consistency of design with Mobil's GPs (Global practice), for acceptable proper access and safety etc.

Complete documentation packages and produce drawing sets

Project: Swamp Area Gas Gathering for N-LNG Gas Supply for T4/5 EPC for Upgrading of Ogbainbiri Flowstation N.A.O.C- Nigeria

Client: N.A.O.C- Nigeria/ Daewoo Nigeria Limited

Project Outline: Construction of a gas pipeline from Tebidada to Ogbainbiri, expansion/upgrading of Ogbainbiri flow station, construction of gas pipeline from Ogbainbiri to Ob/Ob gas plant and upgrading of Ob/Ob gas plant with additional new facilities.

Position: Piping Engineer

Responsibilities:

Preparing As-built for piping GAs and Equipment Layout Drawings

Preparing Demolition Drawings, using Process P&ID

Design of Equipment Layout

Preparing Piping Isometrics.

Pipe Support MTO.

PREVIOUS WORK EXPERIENCE:

2007-2009

Bitwell Engineering Ltd

Project Handled:

Project: UMUSADEGE EPF UPGRADE – MIDWESTERN OIL AND GAS

Position: Piping Engineer

Responsibilities:

Production of plot plan using AutoCAD

Underground planning study using AutoCAD

Development of Equipment Datasheets for the major pieces of equipment and packages.

Equipment Drafting using PDMS and AutoCAD

Review and update of Critical Stress Line List to reflect Isometrics drawings submitted by subcontractor.

Project: UBIT “GE” AND “GI” SLOTS ADDITION PROJECT – (MPN)

Position: Piping Engineer

Responsibilities:

3D Equipment modeling using PDMS

3D Pipe routing using PDMS

Production of Isometrics for stress analysis using PDMS

Verification of Nozzle load Stress results as submitted by Sub-contractor.

Liaison with the Equipment Vendors on General Arrangement of Package Equipment, such as Pumps/Turbines and Installation Procedures

Assurance of Ensured design compliance to project specified codes and standards

Project: GAS SUPPLY TO MIX AND BAKE, WEMPCO AND EKHA - (NGC)

Position: Trainee Piping/ Mechanical Engineer

Responsibilities:

Preparation of Equipment Layout Plan

Generation of Piping Isometrics Drawings

Preparation of Piping MTO

Vent Line Design

Pipeline Tie-In List

Preparation of Alignment Sheet

2005-2007

Skarf Telecommunication Ltd

Project Handled:

Project Outline: Ijebu-ode-Lagos 300km fibre optic cable route

Client: MTN Telecommunication ltd

Position: Project/Site Supervisor

Responsibilities:

Preparation of as-built drawings.

Supervision of laying of fibre optic cable.

Carried-out planning project controls and scheduling cost estimations

Active involvement in pricing and procurement of bill of engineering materials

Active involvement in preparation of tender documents and project supervision to ensure conformance with design specification and quality control

Organizing safety meeting.

Project Outline: Laying of Fibre Optic cables around Benin (Edo State) Metropolis.

Client: Globacom Telecommunication ltd

Position: Site Supervisor

Responsibilities:

Preparation of as-built drawings,

Supervising laying of fibre optic cable

Active involvement in supervision of workers on site.

Coordinates personnel at work sites

2004-2005

Government Comprehensive School, Ogbadibo Local Council, Otukpa-Benue State

Position: National Youth Service Corp (NYSC)

Responsibilities: Teaching of Mathematics and Physics in the Senior Class

2000-2001

Edias (Nig.) Services.

Position: Industrial Trainee

Responsibilities:

Maintenance and repairs of industrial pumps.

Preparation of engineering drawings for the factory equipment.

Referees: To be provided on request.



Contact this candidate