Post Job Free
Sign in

Manager Plant

Location:
Pointe-Claire, QC, Canada
Posted:
August 16, 2018

Contact this candidate

Resume:

Luis Enrique Castillo Eng.

514-***-****

: 514-***-****

:********@*******.***

Senior Member of the Ordre des Ingénieurs du Québec

Trilingual oral and written: French, English and Spanish

PROFILE

Senior Industrial Engineer with many years of experience in the industrial field. Person with an analytical mind, focused on continuous improvement and results, having been very successful in the development, planning and coordination of manufacturing, production and project management activities. Team spirit, leadership, proactive and innovative. Sense of organization, ability to work under pressure, manage priorities and face to the changes. Easy to understand and adapt to new production systems. Ability to coordinate and execute productivity optimization activities and schedule management

QUALIFICATIONS

Project Management,

Excel, MS Projet, Primavera, ERP

Continuous process improvements,

Preventive and corrective maintenance

Results and Performance Analysis KPI’s

Ergonomics in workstattions

Supply chain,

Operations Planning,

Lean, Kaizen, 5S, Kanban, TQC, Six Sigma

Safety and Health CNESST

ISO 9000

PROFESSIONAL EXPERIENCE

Delmar Chemicals 2018-

Contramaitre de Production

Establish production planning as well as production report,

Monitor employees and assigned processes and compliance with CNSST standards.

Establish, control and monitor planned production

Planiform Conveyors. Terrebonne, Montréal 2017

Plant Manager

Establish the production planning in accordance with the deadlines of raw materials (agreements with suppliers) and dates of deliveries to customers;

Estimate and update the inventory;

Assign personnel and verify quality standards and CNESST standards;

Check, monitor and track planned production and perform production reports;

Achievements :

Balanced the assembly lines which allowed a reduction of 15% of the costs.

Paperworks, Rosmar Litho, Montréal

Supervisor / Project manager

2013-2016

Supervisor (60 employees) (1 an)

Follow production planning and react in the event of a breakdown or absenteeism;

Assign personnel to machines (18), check and check for proper operation to achieve planning;

Coordinate with the maintenance department already planned repairs and emergencies;

Enforce and verify, at all times, safety and health standards; CNESST;

Project Manager (Continuous improvements ) (2 ans)

Facilitate the Kaizen and 5S process (verify, control, standardize and support good work practices);

Establish SMED (reduce waiting time between serial changes);

Establish the improvement project in the packaging area (ergonomics in the workstations);

Evaluate production standards and costs to make price estimates (about 200 orders per month);

Achievements:

Reduces the time of about 15% between series changes (presses, cutters and coulters);

Improved facilities and ergonomics of workstations in the packaging area.

Luis Enrique Castillo/ : 514-***-**** / : 514-***-**** / :********@*******.***

CAD Railway, Montréal

Technical Advisor

2012

Redact procedures for the removal and installation of electrical, hydraulic and car interior systems, such as seats, ramps and floors, in accordance with established standards and procedures;

Improve work methods and procedures;

Animate continuous improvements and KPI's (Key Performance Indicators);

Achievements :

Drafted new and improved uninstallations and installations procedures.

DESS Industrial Engineering 2010-2012 Polytechnique de Montréal

Et obtention du permis d’Ingénieur (OIQ)

Nelmar Security Packaging System, Montréal

Coordinator of the production process

Assume responsibility for the coordination, evaluation and continuous improvement of

the department and the team, fostering a positive work climate that encourages overcoming;

2009-2010

Achievements:

Improved profitability and management of employees as needed, while maintaining a safe work environment

Tetisgraf, Lima (Pérou)

Plant Manager

2006-2008

Supervise, lead and control a team of 60 employees;

Lead continuous improvement projects;Lean, Kaizen, Six Sigma, KPI’S (indicateurs de performance);

Achievements:

Planned and organized plant activities with a vision, orientation and development of the plant according to the mission and objectives of the company.

Nelmar, Security Packaging System, Montréal

Production assistant

2005-2006

Assist, control, verify and support the production process.

Genfoot, Montréal

Industrial Engineering Technician and Team Leader

2003-2005

Arrange machines, tools and assign personnel to the packaging process.

EDUCATION

DESS, Industrial Eng. École Polytechnique, Montréal, QC

Industrial Eng. Certificate École Polytechnique, Montréal, QC

Bachelor in Industrial Eng. Lima University (Pérou)

M.I.C.C. Quebec Equivalency

ADDITIONAL FORMATION

Microsoft Projet 2010

CEGEP Saint Laurent

Microsoft Excel

Cegep Saint Laurent

La communication interculturelle

CEGEP Gerald Godin

Luis Enrique Castillo/ : 514-***-**** / : 514-***-**** / :********@*******.***



Contact this candidate