Luis Enrique Castillo Eng.
:********@*******.***
Senior Member of the Ordre des Ingénieurs du Québec
Trilingual oral and written: French, English and Spanish
PROFILE
Senior Industrial Engineer with many years of experience in the industrial field. Person with an analytical mind, focused on continuous improvement and results, having been very successful in the development, planning and coordination of manufacturing, production and project management activities. Team spirit, leadership, proactive and innovative. Sense of organization, ability to work under pressure, manage priorities and face to the changes. Easy to understand and adapt to new production systems. Ability to coordinate and execute productivity optimization activities and schedule management
QUALIFICATIONS
Project Management,
Excel, MS Projet, Primavera, ERP
Continuous process improvements,
Preventive and corrective maintenance
Results and Performance Analysis KPI’s
Ergonomics in workstattions
Supply chain,
Operations Planning,
Lean, Kaizen, 5S, Kanban, TQC, Six Sigma
Safety and Health CNESST
ISO 9000
PROFESSIONAL EXPERIENCE
Delmar Chemicals 2018-
Contramaitre de Production
Establish production planning as well as production report,
Monitor employees and assigned processes and compliance with CNSST standards.
Establish, control and monitor planned production
Planiform Conveyors. Terrebonne, Montréal 2017
Plant Manager
Establish the production planning in accordance with the deadlines of raw materials (agreements with suppliers) and dates of deliveries to customers;
Estimate and update the inventory;
Assign personnel and verify quality standards and CNESST standards;
Check, monitor and track planned production and perform production reports;
Achievements :
Balanced the assembly lines which allowed a reduction of 15% of the costs.
Paperworks, Rosmar Litho, Montréal
Supervisor / Project manager
2013-2016
Supervisor (60 employees) (1 an)
Follow production planning and react in the event of a breakdown or absenteeism;
Assign personnel to machines (18), check and check for proper operation to achieve planning;
Coordinate with the maintenance department already planned repairs and emergencies;
Enforce and verify, at all times, safety and health standards; CNESST;
Project Manager (Continuous improvements ) (2 ans)
Facilitate the Kaizen and 5S process (verify, control, standardize and support good work practices);
Establish SMED (reduce waiting time between serial changes);
Establish the improvement project in the packaging area (ergonomics in the workstations);
Evaluate production standards and costs to make price estimates (about 200 orders per month);
Achievements:
Reduces the time of about 15% between series changes (presses, cutters and coulters);
Improved facilities and ergonomics of workstations in the packaging area.
Luis Enrique Castillo/ : 514-***-**** / : 514-***-**** / :********@*******.***
CAD Railway, Montréal
Technical Advisor
2012
Redact procedures for the removal and installation of electrical, hydraulic and car interior systems, such as seats, ramps and floors, in accordance with established standards and procedures;
Improve work methods and procedures;
Animate continuous improvements and KPI's (Key Performance Indicators);
Achievements :
Drafted new and improved uninstallations and installations procedures.
DESS Industrial Engineering 2010-2012 Polytechnique de Montréal
Et obtention du permis d’Ingénieur (OIQ)
Nelmar Security Packaging System, Montréal
Coordinator of the production process
Assume responsibility for the coordination, evaluation and continuous improvement of
the department and the team, fostering a positive work climate that encourages overcoming;
2009-2010
Achievements:
Improved profitability and management of employees as needed, while maintaining a safe work environment
Tetisgraf, Lima (Pérou)
Plant Manager
2006-2008
Supervise, lead and control a team of 60 employees;
Lead continuous improvement projects;Lean, Kaizen, Six Sigma, KPI’S (indicateurs de performance);
Achievements:
Planned and organized plant activities with a vision, orientation and development of the plant according to the mission and objectives of the company.
Nelmar, Security Packaging System, Montréal
Production assistant
2005-2006
Assist, control, verify and support the production process.
Genfoot, Montréal
Industrial Engineering Technician and Team Leader
2003-2005
Arrange machines, tools and assign personnel to the packaging process.
EDUCATION
DESS, Industrial Eng. École Polytechnique, Montréal, QC
Industrial Eng. Certificate École Polytechnique, Montréal, QC
Bachelor in Industrial Eng. Lima University (Pérou)
M.I.C.C. Quebec Equivalency
ADDITIONAL FORMATION
Microsoft Projet 2010
CEGEP Saint Laurent
Microsoft Excel
Cegep Saint Laurent
La communication interculturelle
CEGEP Gerald Godin
Luis Enrique Castillo/ : 514-***-**** / : 514-***-**** / :********@*******.***