Curriculum Vitae
Harpreet Singh
Father’s Name: S. Avtar Singh
Q.No.D-31 Thaper Colony,
JCT Limited Hoshiarpur,
Punjab Chohal-146024
Mobile. No 094***-*****
Email:- *****.***@*****.***
Objective Looking for a position where I can contribute my skills to the growth
Of the organization through my knowledge to be professional working
With leading technologies in the field of mechanical engineering.
Education:- 1High school examination passed in 1995 with 2nd division in U.P Board.
Intermediate examination passed in 1997 with 2nd division in U.P Board.
I.T.I in Steam turbine with 82% in 2000 from Murad Nagar Govt. I.T.I
college (Ghaziabad).
Diploma in Mechanical engg. IASE university Sardarshahr Rajasthan in 2010
with 1st division
Experience 17.0 Years. BOILER AND TURBINE OPERACTION&MAINTENANCE
Testing & Commissioning:
1)Erection, Testing & Commissioning of power plant
2)Manpower planning at site.
3)Preparation of weekly erection schedule.
4)Preparation of Commissioning Schedule&Sequence of Commissioning.
5)Monitoring day-to-day erection activities.
6)Preparation of Project Report & status clearly indicating Areas of concern.
INDIVIDUAL JOB RESPONSIBILITY AS :-
# Running plant & preventive maintenance of all Type of pumps & gear box and fans.
# Running plant & preventive maintenance complete all documents
# Fault finding in DCS operation and all mechanical equipments (machine)
# Fault finding in utility area operations maintenance
# Discussion and negotiation with vendors.
#Critical maintenance and breakdown work in plant.
InstallationBoilerErection: - feed pumps,ID,FD,PA Fans,Pressure parts,Super Heater,
APH,Smoke Drum Ducting erection and Boiler commissioningBoiler Feed water
Pumpcommissioning pressure make up. BoilerHydraulic, Steam pipelines Erections, ash &
fuel handling system, Alkali boil out, slowfiring, Boiler
Commissioning& running, boiler performance checking.
TurbineErection: - Turbine erection activities which includes-
FLS {Filter LubeOil System},steam piping, oil piping,drain piping,Alternator erection, cabling, bus ducting,electrical & instrumentationPanelErection.Dump condenser, PRDS steam control valves drain piping&packingCooling tower work, high speed coupling& low speedCouplingRedial andThrust bearing polishing & Oil sump and AOP MOP EOP CEP CW PumpCommissioning Woodward governor 2301 & 505Esolenoid trip Safety devices hand trip oversee trip remote trip
Involved of 6MW steam based power plant 38TPHAnd 65kg/cm2 AFBC under bed fired Thermax boiler with ABB DCSControl running on rice husk, Indian coal, Sarkanda, cow dung cakes, Gawar husk, and khudi husk, and Triveni make 6.0 MW extractions cum
Bleed cum condensing turbine commissioning and having 505EWoodward Governor control Skada system at JCT Hoshiarpur Punjab
Maintenance Carried out in-house maintenance which include:-
1.} Open inspection of turbine reduction gear box ejector and
Surface condenser
2.} Manual cleaning of turbine blades, ejector nozzles, tubes and
Surface condenser tubes
3.} Radial and thrust bearing polishing
4.} Turbine generator heat exchanger maintenance andLeakage attending
5.} Interstage leaf spring checking, labyrinth gland clearance
6.} Checking steam alignment chocked orifice feeding
7.} Maintaining day to day operational and generation
9.} Parameter of Steam turbine and boiler
Presently:- Power plant Control room operation and maintenance engineer of 6MW
Power Plant JCT Limited (filament Div.)Hoshiarpur (Pb.) From Oct 2008 to till date
Turbine Make:- Triveni 6 MW
PLC Make Rockwell automation
Boiler Make Thermax 38TPH 65kg/cm2 and Cheema 08 TPH
Experience
1 Erection &Commissioning of 12 MW TRIVENI make back pressure turbine in Chadha Sugar Ltd.,Dhanora from June 2000 to Sep. 2000. under S.K.S Techno Power.
2 O&M 5 MW KAWASAKI make condensing turbine in Shri Acid Ltd.,Gajrola From Sep2000 to june2001 under S.K.S Techno power.
3 O&M 1.5 MW APPE BALLIS make back pressure turbine in A B C Paper Mills LTd.,Sailakhurd Distt. Hoshiarpur. From July 2001 to June 2002 Under S.K.S Techno Power.
4 O&M 10 MW SIEMENS make condensing Turbine in power plants Jalkheri Distt. Fathegarh Sahib From June 2002 To May 2003. under S.K.S Techno power.
5 Worked with Satia Paper Mills Ltd. Muktsar on 5MW SIEMENS and 5MW DLFSKODA make condensing turbine synchronised with Grid from June 2003 to 28 Oct 2006 as a turbine Engineer.
Strength:- Positive attitude, Hard Working, Good Communication skill,Commitment to teamwork, Skill development, Good manpower handling
Languages Punjabi,Hindi,English
Date of Birth 09thApril,1982
Married status Married
Sex Male
{HARPREET SINGH}