Post Job Free

Resume

Sign in

ARCHITECT ENGINEER

Location:
Cairo, Cairo Governorate, Egypt
Posted:
August 08, 2018

Contact this candidate

Resume:

Curriculum Vitae

C . V

Abstract Personal data Number (1)

c.v

Mohammed Saber

Zaki Radwan

Architecture eng

** **** **********

Mop / 011********

Home / 013*******

Mo job /

012********

Address/ El manzalaa

- Tookh - Qualubia,Egypt.

Email:

dido_moh2010@yaho

o. com

Name : Mohammed Saber Zaki Radwan

Nationality : Egyptian

Date of birth : 1/1/1985

Religion : Muslim

Place of birth : El manzalaa - Tookh - Qualiubia

Marital Status : single

iD. No : 285*********** Tookh - Issue

date : Qualubia 2001.

Passport number : A20059378

Driving Licens : 040***********

Job : / Architecture eng

Trade union record number :

military status :final exception

-1-

•Email:

dido_moh2010@yahoo. com

Mobile /

011********

Home / 013*******

work Mobile

:012********

This resulted in the Bachelor

of Engineering, Department

of Architecture, 2016 and its

equivalent. In the field of

industrial education,

Department of Architecture,

2007, in accordance with the

decision of the Supreme

Council of Universities No.

562 of 2011 on the equation

of graduates of materials

from the Faculty of

Industrial Education,

Faculty of Engineering

Address / El manzalaa - Tookh - Qualubia

Mobile of work / 011******** & 012********

Tel Home / 013*******

E-mail : ac6la5@r.postjobfree.com

Others person to connect : Saber Zaki Radwan

Mobile No : 012********

- Bachelor of Engineering, Architecture Department, Safwa High Institute of Engineering and Technology.

- Specialization / Architectural engineer

- General estimate / good//

- Graduation Year / 2016

- graduation project / Syndicate of Engineers Syndicate in Shorouk, Social and Sports Club, Chamber of Commerce and a group of banks, malls and hotels.

- Estimate the graduation project /very good

Bachelor of Industrial Education Beni Suef University.

- Specialization / Architectural

- General estimate / good//

- Graduation Year / 2007

graduation project / A study on the development of the northern area of the citadel of Salah al-Din in the historic city and the operation of the walls and towers of the northern region and make it (culturally oriented and urban).

- Estimate the graduation project/ Excellent

-2-

Abstract contact information Number (2)

Abstract Academic Qualifications Number (3)

The development of the

northern region, the Citadel

project

Site Engineer

Specializing in surface works,

quality control of piling works

and supervision of the

implementation of finishes

Address 15 / Abdel Salam Aref

St. Off El Guish St. in El

Mansoura City

2- It is responsible for

overseeing the implementation

work and handing it over to

the supervisor

Address / Al Rehab City Sector

3- Responsible for the

implementation work for the

period and the technical office

and the direction of

supervision of some of the

work of the company

Address / Heliopolis behind

Super Jet Station

4-Site manager, architectural

designer and author of the

technical office

Responsible for reviewing the

designs and their work

sometimes and review the

work on the site and delivered

to customers and the receipt of

works from contractors

3- Diploma in technical institutes and industrial Banha

- Specialization / technical office

- General estimate / very good

- Graduation Year / 2004

- graduation project / Design a school for basic education with the preparation of drawings and details of the executive (construction and architectural project

- Estimate the graduation project /Excellent

1- Arab Company for Development of Al- Urban in

Mansoura (Eng / Mustafa Ammar)

- Title / Site engineer

- Timing / 1/6/2007 - 30/12 /2007

- Activity / In the fields of piles and exterior finishes 2- Alexandria Construction Company (TMG)

- Title / Site engineer

- Timing / 1/1/2008 - 30/4 /2008

- Activity / Al-Rehab City Project (B) in the fields of reinforced concrete and interior and exterior finishes 3- Modern Integrated Systems Company (ISO).

- Title / Site engineer & Technical Office

- Timing / 1/5/2008 - 30/9 /2009

- Activity / Areas of concrete finishes and Technical Office 4- vision For Real Estate Investment & Contracting

- Title / Senior Engineer& Technical Office

- Timing / 1/10/2009 - 30/3 /2016

- Activity / The field of construction, finishing and real estate investment

General Contracting (Construction - Architectural Design - Maintenance)

-3

Abstract The Practical experience Number (4)

6 - Senior engineer :It is

specialized in executing the

tasks entrusted to the company

by the company and

supervising the works and the

work of the technical office

Address / El Malika Farida

sreet, Mearag El Maadi

xperience: 9 - 11 years

Location: Egypt

Job: Architect

Role: Set Engineering,

Architect

Basic Skills: Efficient work

and stress tolerance in the

fields of work Architecture

Execution - Supervision of

implementation and

architectural design

Business All objects of

architectural and construction

works Ability to work

5- Ghamry Co. For General Contracting & Real Estate Investment(G.C.C.G)

- job / Senior Engineer& Technical Office

- Timing / 1/7/2016 - TO DAY

- Activity/ General Contracting & Real Estate

1- Skills for Computer :

- ( Word Excel Power point )

- auto cad ( 2d&3d )

- rivet architecture

- 3D max

2- Skills for Devices cadastral

- Total Station - Balance

3- Key Skills:

- Fluent works of technical office (inventory - assays - abstracts - WORK SHOP Drowing

- Mastery of architectural design using computer programs

- The possibility of strict implementation and speed at a lower cost and the ability to understand the ideas and translate them into reality

- The ability to find quick solutions and mobility between alternatives, and choose the optimal solution in terms of time And the best method of implementation

The possibility of concluding contracts and legal agreements and the conditions necessary for them, And to preserve the company's rights and capabilities, And to know the performance rates of employment and technical, And the possibility of drafting timetables, Manage

- execute and manage business sequences Without disrupting the movement of work

- Ability to lead a team and work within the group with its

-4-

Training Skills Number (5)

Technical office and

management of technical

projects Construction

Site Engineer, Technical

Office Engineer

excellent and efficient ability

- Is able to visualize how to communicate between each of the building of the other rewarded parts And thus the ability to sequence the business of the project

- - Ability to understand and accommodate customer requirements Their requirements are programmed into reality

1- Arab Company for Development of Urban in Mansoura

(Eng / Mustafa Ammar):-

Abu Bakr al-Siddiq Mosque in the Great Mahalla at 3000 meters.

The headquarters of the company phase factory for garments Mahala.

Foundations and finishes of a group of residential and commercial buildings in Mahalla and Mansoura.

Foundations of mosques and buildings in Mansoura.

Foundations of the Nuclear Radiology Center attached To the Child Cancer Hospital 57357

2- Modern Integrated Systems Company (ISO)

- Creation of two reservoirs of land capacity of 7000 M3 water / desert 18 war plant.

- Execution of a number of barns (metal installations) in the 18th plant to liquidate the production of industrial drainage station.

- Completion of the finishing work of the industrial wastewater treatment plant 7000 m3 / day. All finishing materials include flooring, walls, electricity, insulation, iron fabrication, paints, carpentry,

- sidewalks for interior and exterior roads and landscaping.

- Implementation of the road network, the main irrigation

-5-

Photo work Previous Business Number 6)

- network and the sub-plant The 110-acre surface will be planted on the basis of industrial wastewater in the desert of the 18th Military Plant

- Completion of the finishing work of the company's factory in Obour Industrial City for the manufacture of solar cells for heaters

- Completion of the complete finishing works for villas 158 and 186 in the eighth district in the city of shuruck 3- Roya For Real Estate Investment & Contracting

Work as an engineer and contractor in a vision

In the fields of concrete, finishing, and real estate investment

Starting from the stages of design, normal works and finishing systems for installations, electrical works and finishing facilities Elevators, fences, stairs, garages, installation of hoses and cans without wires for the rest of the units and installation of carpentry, doors and units only, water supply and disposal of units without finishing, indoor and outdoor bleaching and

installation of acrylic and alumetal works for facades and marble for stairs and entrances. In the areas of buildings and villas

- Finishes and finishes 4, 37 and 59 adjacent to Building 4, 2 and 3 third area and finishes.

- Building 32, 3 and 37 sites adjacent to 1, 3, 3 and 4 Area III structural structure

Construction and finishing sites insulation,, Building 38, 45, 71, 68 and adjacent sites 1, 2, 3 and 4

- Construction and finishing site 40, adjacent to the second area, structural structure V and finishes

- Construction and finishing site 77 neighboring 2 Structural structure VII in finishes

He made iron through the iron workshop he owned.

-6-

degla Palmz

- Designing the implementation of towers, buildings, residential houses and commercial sites for buildings and houses in the city of Tukh and its vicinity and the completion of Mohamed Mohamed Saber in 2012 to

date)

- Implementation of two buildings (77-78) in the project of the city of Abu-Absal Social Housing (Sina and the International Group) 2014

- Construction of the building 100 Bahai (trees Darna) gardens October 2012

- Implementation of a building in the city of Gardonia Nasr City on the Armed Forces 2014

-- Implementation of the project of feed company as a chemical pharmaceuticals 2015-2016

4- Ghamry Co. For General Contracting & Real Estate Investment(G.C.C.G)

- The implementation and finishing of 2 villas in the first assembly in the suburb of the palm in the architectural style distinguished by the style of finishing luxury integrated

Supervising the finishing works at Al-Arab Hospital in Al- Mansoura for 100 beds with a total of 8 floors

Implementation of the marble factory of a company in the area of 1000 factories in New Cairo

Finishing the administrative building and the cafeteria of Shibsi Asyout factory & finishing building in madkor constrction

- Finishing brand Peugeot in baloon

Thank you very much and

You are very respectful

Mohammed Saber Zaki Radwan

•Email: dido_moh2010@yahoo. Com

Mobile / 011******** &012********

-7-



Contact this candidate